December 19, 2007 Mr. James McCarthy Site Vice President FPL Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

CHANGE TO THE INSPECTION PLAN - POINT BEACH NUCLEAR PLANT Dear Mr. McCarthy As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed its inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to security) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspectors arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27

Enclosure:

As Stated cc w/encl:

J. Stall, Senior Vice President and Chief Nuclear Officer M. Warner, Vice President, Nuclear Operations North Region R. Kundalkar, Vice President, Nuclear Technical Services Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin State Liaison Officer

Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27

Enclosure:

As Stated cc w/encl:

J. Stall, Senior Vice President and Chief Nuclear Officer M. Warner, Vice President, Nuclear Operations North Region R. Kundalkar, Vice President, Nuclear Technical Services Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin State Liaison Officer DOCUMENT NAME: G:\\Branch TSS\\ALLMOC\\Midcycle 2006 to 2007\\Realignment Letter\\Point Beach.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME JCameron:dtp DATE 12/19/07 OFFICIAL RECORD COPY

Letter to J. McCarthy from J. Cameron dated December 19, 2007

SUBJECT:

CHANGE TO THE INSPECTION PLAN - POINT BEACH NUCLEAR PLANT DISTRIBUTION:

TEB CFL EMH1 LXR1 RidsNrrDirsIrib MAS KGO JKH3 CAA1 RGK DRPIII DRSIII PLB1 TXN

Point Beach Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 02/11/2008 02/15/2008 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 02/11/2008 02/15/2008 71151-BI01 IP Reactor Coolant System Activity 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 04/07/2008 04/11/2008 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/07/2008 04/11/2008 7112102 IP ALARA Planning and Controls Baseline Inspections 04/07/2008 04/11/2008 71151-OR01 IP Occupational Exposure Control Effectiveness 2

BI ENG

- ENG INSERVICE INSPECTION/ TI-150/TI-172 Safety Issues 04/07/2008 05/02/2008 2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA Generic Safety Inspec 04/07/2008 05/02/2008 2515/172 IP Reactor Coolant System Dissimiliar Metal Butt Welds Baseline Inspections 04/07/2008 05/02/2008 7111108P IP Inservice Inspection Activities - PWR 1

2515/166

- TI 2515/166 PWR SUMP INSPECTION Safety Issues 04/14/2008 04/18/2008 2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

5 BI ENG

- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 06/23/2008 07/25/2008 7111121 IP Component Design Bases Inspection 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 07/07/2008 07/11/2008 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/07/2008 07/11/2008 71151-PR01 IP RETS/ODCM Radiological Effluent 1

2515/172

- TI 2515/172 RCS WELD INSPECTION Generic Safety Inspec 08/25/2008 08/29/2008 2515/172 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2

BI ENG

- ENGINEERING INSERVICE INSPECTION/TI 172 Generic Safety Inspec 09/15/2008 10/10/2008 2515/172 IP Reactor Coolant System Dissimiliar Metal Butt Welds Baseline Inspections 09/15/2008 10/10/2008 7111108P IP Inservice Inspection Activities - PWR 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 09/29/2008 10/03/2008 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 09/29/2008 10/03/2008 7112102 IP ALARA Planning and Controls 3

BI PI&R

- BIENNIAL PI&R INSPECTION Baseline Inspections 11/03/2008 11/21/2008 71152B IP Identification and Resolution of Problems 3

BI EP

- EP EXERCISE INSPECTION / PI VERIFICATION EP Baseline Inspectio 12/08/2008 12/12/2008 7111401 IP Exercise Evaluation Baseline Inspections 12/08/2008 12/12/2008 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 12/08/2008 12/12/2008 71151-EP02 IP ERO Drill Participation Baseline Inspections 12/08/2008 12/12/2008 71151-EP03 IP Alert & Notification System