MONTHYEARML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 ML23208A0972023-07-27027 July 2023 Subsequent License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application ML23144A0192023-05-25025 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 ML23121A0552023-05-0303 May 2023 Acknowledgement of Withdrawal Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23075A0732023-04-0505 April 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Supplement (EPID Number L-2021-SLE-0002) ML23045A1332023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Achp Letter ML23045A1402023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Shpo Letter ML23045A1432023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - State Tribe Letter ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML23069A1102023-03-10010 March 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23061A1772023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 ML22363A3942023-01-12012 January 2023 Subsequent License Renewal Environmental Report Supplement - Proposed Review Schedule ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22329A1042022-11-29029 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report ML22321A1582022-11-22022 November 2022 Summary of Conference Call Regarding the Fall 2022 Steam Generator Tube Inspections ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 ML22301A0112022-11-0303 November 2022 Request for Withholding Information from Public Disclosure Regarding the SLR Application - September 2, 2022 ML22298A0752022-10-27027 October 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application Duke Energy Letter Dated July 25, 2022 ML22264A0322022-10-20020 October 2022 _Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Duke Energy Letter Dated July 8, 2022 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22222A0072022-09-14014 September 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22234A0062022-08-30030 August 2022 SLRA - Closed Public Meeting Summary - August 18, 2022 2024-02-01
[Table view] Category:Technical Specification
MONTHYEARRA-22-0292, License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-04-0404 April 2023 License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0005, Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis2021-09-0202 September 2021 Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis ML20237F4352020-09-0404 September 2020 Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations RA-19-0039, License Amendment Request to Revise Technical Specifications to Adopt Two NRC-Approved Generic Technical Specification Changes2020-04-13013 April 2020 License Amendment Request to Revise Technical Specifications to Adopt Two NRC-Approved Generic Technical Specification Changes RA-20-0011, Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2020-02-0606 February 2020 Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-0282, Technical Specification Bases Changes2019-06-26026 June 2019 Technical Specification Bases Changes RA-18-0281, Technical Specification Bases Changes2019-06-25025 June 2019 Technical Specification Bases Changes RA-18-0023, License Amendment Request (2017-05) to Add a Surveillance Requirement to Technical Specification 3.8.1, AC Sources2018-05-17017 May 2018 License Amendment Request (2017-05) to Add a Surveillance Requirement to Technical Specification 3.8.1, AC Sources ONS-2018-013, Technical Specification Bases Changes2018-02-22022 February 2018 Technical Specification Bases Changes RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ONS-2017-050, Technical Specification Bases Change 2017-042017-07-21021 July 2017 Technical Specification Bases Change 2017-04 ONS-2017-043, Technical Specification Bases Change 2017-012017-07-20020 July 2017 Technical Specification Bases Change 2017-01 ONS-2017-052, Technical Specification Bases Change 2017-032017-07-20020 July 2017 Technical Specification Bases Change 2017-03 ML17095A5302017-03-30030 March 2017 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process; License Amendment Request No. 2015-03 ONS-2017-019, Technical Specification Bases Change 2015-092017-02-23023 February 2017 Technical Specification Bases Change 2015-09 ONS-2016-082, Technical Specification Bases Change for TS Bases 3.4.16, Steam Generator Tube Integrity2016-09-0808 September 2016 Technical Specification Bases Change for TS Bases 3.4.16, Steam Generator Tube Integrity ONS-2016-071, Duke Energy Carolinas, LLC - Oconee Nuclear Station, Docket Numbers 50-269, 50-270, and 50-287 - Technical Specification (TS) Bases Change2016-08-0404 August 2016 Duke Energy Carolinas, LLC - Oconee Nuclear Station, Docket Numbers 50-269, 50-270, and 50-287 - Technical Specification (TS) Bases Change ONS-2016-059, Technical Specification Bases Changes2016-07-11011 July 2016 Technical Specification Bases Changes RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process ONS-2016-049, Technical Specification Bases Change2016-06-0606 June 2016 Technical Specification Bases Change ONS-2016-029, Technical Specification (TS) Bases Change2016-03-29029 March 2016 Technical Specification (TS) Bases Change ONS-2016-009, Technical Specification (TS) Bases Change2016-02-0909 February 2016 Technical Specification (TS) Bases Change ML16028A1912016-01-20020 January 2016 Technical Specification Base Change ONS-2015-106, Technical Specification (TS) Bases Change2015-10-26026 October 2015 Technical Specification (TS) Bases Change ML15175A4472015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6 ML15175A4482015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6 ML15175A4452015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 4 of 6 ML15175A4422015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 3 of 6 RA-15-0006, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 62015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 6 ONS-2015-069, Technical Specification (TS) Bases Change2015-06-23023 June 2015 Technical Specification (TS) Bases Change ONS-2015-047, License Amendment Request (LAR) to Add High Flux Trip for 3 Reactor Coolant Pump Operation, License Amendment Request No. 2014-052015-05-19019 May 2015 License Amendment Request (LAR) to Add High Flux Trip for 3 Reactor Coolant Pump Operation, License Amendment Request No. 2014-05 ONS-2015-057, Technical Specification (TS) Bases Changes2015-05-18018 May 2015 Technical Specification (TS) Bases Changes ONS-2015-033, Technical Specification (TS) Bases Change2015-03-18018 March 2015 Technical Specification (TS) Bases Change ONS-2015-006, Technical Specification (TS) Bases Change2015-01-29029 January 2015 Technical Specification (TS) Bases Change ONS-2014-145, Submittal of Technical Specification Bases Change2014-11-20020 November 2014 Submittal of Technical Specification Bases Change ONS-2014-103, Technical Specification (TS) Bases Change2014-07-23023 July 2014 Technical Specification (TS) Bases Change RA-14-0001, License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area2014-07-21021 July 2014 License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area ONS-2014-093, Technical Specification (TS) Bases Change2014-07-10010 July 2014 Technical Specification (TS) Bases Change ONS-2014-079, Submittal of Technical Specification (TS) Bases Change2014-06-0303 June 2014 Submittal of Technical Specification (TS) Bases Change ONS-2014-064, Technical Specification (TS) Bases Change2014-05-12012 May 2014 Technical Specification (TS) Bases Change ONS-2014-031, Technical Specification (TS) Bases Change2014-03-0404 March 2014 Technical Specification (TS) Bases Change ONS-2014-012, Submittal of Technical Specification Bases Change2014-02-0303 February 2014 Submittal of Technical Specification Bases Change ML13357A6742014-01-0808 January 2014 Issuance of Amendments Regarding the Temporary Technical Specification Change to Extend the Completion Time for an Inoperable Keowee Hydro Unit (TAC ME9021, ME9022, and ME9023) ONS-2013-006, Technical Specification Bases Change2013-11-13013 November 2013 Technical Specification Bases Change ML13234A3362013-08-0808 August 2013 Technical Specification Bases Change ML13211A2832013-07-24024 July 2013 Technical Specification Bases (Tsb) Change 2023-04-04
[Table view] Category:Bases Change
MONTHYEARRA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0005, Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis2021-09-0202 September 2021 Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis RA-19-0039, License Amendment Request to Revise Technical Specifications to Adopt Two NRC-Approved Generic Technical Specification Changes2020-04-13013 April 2020 License Amendment Request to Revise Technical Specifications to Adopt Two NRC-Approved Generic Technical Specification Changes RA-18-0282, Technical Specification Bases Changes2019-06-26026 June 2019 Technical Specification Bases Changes RA-18-0281, Technical Specification Bases Changes2019-06-25025 June 2019 Technical Specification Bases Changes RA-18-0023, License Amendment Request (2017-05) to Add a Surveillance Requirement to Technical Specification 3.8.1, AC Sources2018-05-17017 May 2018 License Amendment Request (2017-05) to Add a Surveillance Requirement to Technical Specification 3.8.1, AC Sources ONS-2018-013, Technical Specification Bases Changes2018-02-22022 February 2018 Technical Specification Bases Changes ONS-2017-050, Technical Specification Bases Change 2017-042017-07-21021 July 2017 Technical Specification Bases Change 2017-04 ONS-2017-052, Technical Specification Bases Change 2017-032017-07-20020 July 2017 Technical Specification Bases Change 2017-03 ONS-2017-043, Technical Specification Bases Change 2017-012017-07-20020 July 2017 Technical Specification Bases Change 2017-01 ML17095A5302017-03-30030 March 2017 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process; License Amendment Request No. 2015-03 ONS-2017-019, Technical Specification Bases Change 2015-092017-02-23023 February 2017 Technical Specification Bases Change 2015-09 ONS-2016-082, Technical Specification Bases Change for TS Bases 3.4.16, Steam Generator Tube Integrity2016-09-0808 September 2016 Technical Specification Bases Change for TS Bases 3.4.16, Steam Generator Tube Integrity ONS-2016-071, Duke Energy Carolinas, LLC - Oconee Nuclear Station, Docket Numbers 50-269, 50-270, and 50-287 - Technical Specification (TS) Bases Change2016-08-0404 August 2016 Duke Energy Carolinas, LLC - Oconee Nuclear Station, Docket Numbers 50-269, 50-270, and 50-287 - Technical Specification (TS) Bases Change ONS-2016-059, Technical Specification Bases Changes2016-07-11011 July 2016 Technical Specification Bases Changes RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process ONS-2016-049, Technical Specification Bases Change2016-06-0606 June 2016 Technical Specification Bases Change ONS-2016-029, Technical Specification (TS) Bases Change2016-03-29029 March 2016 Technical Specification (TS) Bases Change ONS-2016-009, Technical Specification (TS) Bases Change2016-02-0909 February 2016 Technical Specification (TS) Bases Change ML16028A1912016-01-20020 January 2016 Technical Specification Base Change ONS-2015-106, Technical Specification (TS) Bases Change2015-10-26026 October 2015 Technical Specification (TS) Bases Change ML15175A4482015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6 ML15175A4472015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6 ML15175A4452015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 4 of 6 ML15175A4422015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 3 of 6 RA-15-0006, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 62015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 6 ONS-2015-069, Technical Specification (TS) Bases Change2015-06-23023 June 2015 Technical Specification (TS) Bases Change ONS-2015-047, License Amendment Request (LAR) to Add High Flux Trip for 3 Reactor Coolant Pump Operation, License Amendment Request No. 2014-052015-05-19019 May 2015 License Amendment Request (LAR) to Add High Flux Trip for 3 Reactor Coolant Pump Operation, License Amendment Request No. 2014-05 ONS-2015-057, Technical Specification (TS) Bases Changes2015-05-18018 May 2015 Technical Specification (TS) Bases Changes ONS-2015-033, Technical Specification (TS) Bases Change2015-03-18018 March 2015 Technical Specification (TS) Bases Change ONS-2015-006, Technical Specification (TS) Bases Change2015-01-29029 January 2015 Technical Specification (TS) Bases Change ONS-2014-145, Submittal of Technical Specification Bases Change2014-11-20020 November 2014 Submittal of Technical Specification Bases Change ONS-2014-103, Technical Specification (TS) Bases Change2014-07-23023 July 2014 Technical Specification (TS) Bases Change RA-14-0001, License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area2014-07-21021 July 2014 License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area ONS-2014-093, Technical Specification (TS) Bases Change2014-07-10010 July 2014 Technical Specification (TS) Bases Change ONS-2014-079, Submittal of Technical Specification (TS) Bases Change2014-06-0303 June 2014 Submittal of Technical Specification (TS) Bases Change ONS-2014-064, Technical Specification (TS) Bases Change2014-05-12012 May 2014 Technical Specification (TS) Bases Change ONS-2014-031, Technical Specification (TS) Bases Change2014-03-0404 March 2014 Technical Specification (TS) Bases Change ONS-2014-012, Submittal of Technical Specification Bases Change2014-02-0303 February 2014 Submittal of Technical Specification Bases Change ONS-2013-006, Technical Specification Bases Change2013-11-13013 November 2013 Technical Specification Bases Change ML13234A3362013-08-0808 August 2013 Technical Specification Bases Change ML13211A2832013-07-24024 July 2013 Technical Specification Bases (Tsb) Change ML12333A3152012-11-27027 November 2012 Technical Specification Bases (Tsb) Changes ML12319A4792012-11-12012 November 2012 Technical Specification Bases (Tsb) Changes ML12307A2192012-10-30030 October 2012 License Amendment Request for Approval to Operate a Reverse Osmosis System to Remove Silica from the Borated Water Storage Tanks and Spent Fuel Pools During Unit Operation and Associated Proposed Tech Specs and Bases.. ML12310A3822012-10-29029 October 2012 Technical Specification Bases (Tsb) Changes ML12243A4012012-08-29029 August 2012 Technical Specification Bases (Tsb) Change ML12221A1822012-08-0707 August 2012 Technical Specification Bases (Tsb) Changes 2023-02-16
[Table view] |
Text
. 4 BRUCE H HAMILTON Vice President Ah*Energy' Oconee Nuclear Station Duke Energy Corporation ONO] VP / 7800 Rochester Highway Seneca, SC 29672 864 885 3487 864 885 4208 fax bhhamilton@duke-energy.com December 12, 2007 U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk
Subject:
Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC Oconee Nuclear Station
-Docket Numbers 50-269, 270, and 287 Technical Specification Bases (TSB) Change On December 4, 2007 Station Management approved revisions to TSB 3.3.18, EPSL Voltage Sensing Circuits, to state that Oconee Unit 1 Standby Bus #1 and Bus #2 voltage sensing circuits are required in order for Oconee Units 1, 2, and 3 Standby Bus #1 and #2 voltage sensing circuits to be considered OPERABLE.
Attachment 1 contains the new TSB pages, Attachment 2 contains the marked up version of the TSB pages.
If any additional information is needed, please contact Reene Gambrell at 864-885-3364.
Very truly yours, B. H. Hamilton, Vice President Oconee Nuclear Site www. duke-energy. com
Attachment #1 Proposed Bases revision Remove Page Insert Page B 3.3.18-1 B 3.3.18-1 B 3.3.18-2 B 3.3.18-2 B 3.3.18-3 B 3.3.18-3 B 3.3.18-4 B 3.3.18-4
EPSL'Voltage Sensing Circuits B 3.3.18 B 3.3 INSTRUMENTATION B 3.3.18 Emergency Power Switching Logic (EPSL) Voltage Sensing Circuits BASES BACKGROUND The EPSL voltage sensing circuits for the Startup Transformer, Standby Bus #1, Standby Bus #2, and the Auxiliary Transformer provide input to the EPSL controls to actuate breakers and initiate transfer control sequences.
Each phase of each source has an individual potential transformer feeding a 2 out of 3 logic for determining the status of the power source. The voltage sensing circuits also provide trip signals to the breaker control circuitry for the normal incoming breakers (N breakers), startup incoming breakers (E breakers), and CT-5 incoming breakers (SL breakers) whose trip is from Unit 1 Standby Bus #1 ,-Standby Bus #2 voltage sensing circuits only.
The EPSL system is designed to ensure power is supplied to the main feeder buses (MFBs) during a LOCA. In order for itto perform this function, the voltage sensing circuits for the Startup Transformer, Auxiliary Transformer, Standby Bus #1, and Standby Bus #2 must be OPERABLE.
These voltage sensing circuits provide input to the EPSL transfer functions.
The transfer functions utilize the voltage sensing circuits to initiate breaker Operations to ensure the MFBs are connected to an energized source (startup or standby). The N and E breakers also get direct trips from the two-out-of-three logic.
If a loss of power occurs on the Standby Bus when a Lee Combustion Turbine or the Central Switchyard is aligned to the Standby Bus, the Oconee Unit 1 Standby Bus #1 and Standby Bus #2 voltage sensing circuits will initiate a transfer of the Standby Bus to the Keowee Unit aligned to the Underground power path. When the CT-5 incoming breakers, (SL breakers) are closed, the Oconee Unit 1 Standby Bus #1 and Standby Bus
- 2 voltage sensing circuits are required for Oconee Units 1, 2, and 3 Standby Bus #1 and Standby Bus #2 voltage Sensing circuits to be considered OPERABLE.
No protective relay lockouts or inhibits can be present to prevent the connection of required AC power source(s) to the MFBs from the Control Room because their presence will not allow closure of the associated breaker.
APPLICABLE The EPSL voltage sensing circuits are required for the engineered SAFETY ANALYSES. safeguards (ES) equipment to function in any accident with a loss of offsite OCONEE UNITS 1, 2, & 3 B 3.3.18-1 BASES REVISION DATED 12/06/07 1
EPSL Voltage Sensing circuits B 3.3.18 BASES (continued)
APPLICABLE power. The limiting accident for the EPSL voltage sensing circuits is a SAFETY ANALYSES loss-of-coolant accident (LOCA) with a simultaneous loss of offsite (continued) power (Ref. 1).
The EPSL voltage sensing circuits satisfy Criterion 3 of 10 CFR 50.36 (Ref. 2).
LCO Three channels of each EPSL voltage sensing circuit (Auxiliary Transformer, Startup Transformer, Standby Bus #1, Standby Bus #2) are required to be OPERABLE. These circuits and associated channels ensure that no single failure can cause a loss of required ES equipment.
When the SL breakers are closed, Oconee Unit 1 Standby Bus #1 and Standby Bus #2 voltage sensing circuits are required for Oconee Units 1, 2, and 3 Standby Bus #1 and Standby Bus #2 voltage sensing circuits to be considered OPERABLE.
The LCO is modified by two Notes. Note 1 removes Auxiliary Transformer voltage sensing requirements when both N breakers are open. The function of the Auxiliary Transformer Voltage Sensing circuits is to provide a trip signal to the N breakers. When the N breakers are open, the Auxiliary Transformer voltage sensing circuits are not required and, therefore, need not be OPERABLE. Note 2 requires only the EPSL voltage sensing circuits associated with required AC power source(s) to be OPERABLE when not in MODES 1, 2, 3, and 4.
APPLICABILITY The EPSL voltage sensing circuits are required to be OPERABLE in MODES 1, 2, 3, and 4 to ensure that power is provided from AC Sources to the AC Distribution system within the time assumed in the accident analyses.
The EPSL voltage sensing circuits associated with required AC power source(s) required to be OPERABLE in MODES 5 and 6 and during movement of irradiated fuel assemblies provide assurance that:
- a. Systems needed to provide adequate coolant inventory makeup are available for the irradiated fuel assemblies;
- b. Systems needed to mitigate a fuel handling accident are available;
- c. Systems necessary to mitigat'e the effects of events that can lead to core damage during shutdown are available; and OCONEE UNITS 1, 2, & 3 B 3.3.18-2 BASES REVISION DATED 12/06/07 I
EPSL Voltage Sensing circuits B 3.3.18 BASES (continued)
APPLICABILITY d. Instrumentation and control capability is available for monitoring (continued) and maintaining the unit in a cold shutdown condition or refueling condition.
ACTIONS A Note has been added to the ACTIONS indicating separate Condition entry is allowed for each Voltage Sensing Circuit.
A.1 If one required channel is inoperable in one or more voltage sensing circuits, it must be restored to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. With one channel inoperable, the remaining two channels are capable of providing the voltage sensing function. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is considered appropriate based on engineering judgement taking into consideration the time required to complete the required action.
Required Action A.1 is modified by a Note which indicates that the Completion Time is reduced when in Condition L of LCO 3.8.1. Condition L limits the Completion Time for restoring an inoperable channel to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> when emergency power source(s) or offsite power source(s) are inoperable for extended time periods or for specific reasons.
B.1 and B.2 With the Required Action and associated Completion Time not met in MODES 1, 2, 3 and 4, the unit must be brought to a MODE in which the LCO does not apply. To achieve this status, the unit must be brought to at least MODE 3 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 5 within 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to allow for a controlled shutdown.
C.1 and C.2 With two or more channels of a required circuit inoperable when not in MODES .1, 2, 3, and 4 or the Required Action and associated Completion Time not met when not in MODES 1, 2, 3, and 4, the affected AC power sources(s) must be declared inoperable immediately. The appropriate Required Actions will be implemented in accordance with LCO 3.8.2, "AC Sources -Shutdown."
OCONEE UNITS 1, 2, & 3 B 3.3.18-3 BASES REVISION DATED 12/06/07 1
EPSL Voltage Sensing circuits B 3.3.18 BASES (continued)
ACTIONS D.1 (continued)
With the Required Action and associated Completion Time not met during movement of irradiated fuel assemblies, movement of fuel assemblies must be suspended immediately. Suspension does not preclude completion of actions to establish a safe conservative condition. This action minimizes the probability or the occurrence of postulated events. The Completion Time of immediately is consistent with the required times for actions requiring prompt attention SURVEILLANCE SR 3.3.18.1 REQUIREMENTS A CHANNEL FUNCTIONAL TEST is performed on each voltage sensing circuit channel to ensure the channel will perform its function. A circuit is defined as three channels, one for each phase. Each channel consists of components from the sensing power transformer through the circuit auxiliary relays which operate contacts in the EPSL logic and breaker trip circuits. Minimum requirements consist of individual channel relay operation causing appropriate contact responses within associated loadshed/breaker circuits, alarm activations, and proper indications for the sensing circuit control power status. The Frequency of 18 months is based on engineering judgment and operating experience that determined testing on an 18 month interval provides reasonable assurance that the circuitry is available to perform its safety function.
REFERENCES 1. UFSAR, Chapters 6 and 15.
- 2. 10 CFR 50.36.
OCONEE UNITS 1, 2, & 3 B 3.3.18-4 BASES REVISION DATED 12/06/07 1
Attachment #2 Markup of current Bases
EPSL Voltage Sensing Circuits B 3.3.18 B 3.3 INSTRUMENTATION B 3.3.18 Emergency Power Switching Logic (EPSL) Voltage Sensing Circuits 11BASES BACKGROUND The EPSL voltage sensing circuits for the Startup Transformer, Standby Bus #1, Standby Bus #2, and the Auxiliary Transformer provide input to the EPSL controls to actuate breakers and initiate transfer control sequences.
Each phase of each source has an individual potential transformer feeding a 2 out of 3 logic for determining the status of the power source. The voltage sensing circuits also provide trip signals to the breaker control circuitry for the normal incoming breakers (N breakers), startup incoming breakers (E breakers), and CT-5 incoming breakers (SL breakers) whose trip is from Unit 1 Standby Bus #1, Standby Bus #2 voltage sensing circuits only.
The EPSL system is designed to ensure power is supplied to the main feeder buses (MFBs) during a LOCA. In order for it to perform this function, the voltage sensing circuits for the Startup Transformer, Auxiliary Transformer, Standby Bus #1, and Standby Bus #2 must be OPERABLE.
These voltage sensing circuits provide input to the EPSL transfer functions.
The transfer functions utilize the voltage sensing circuits to initiate breaker operations to ensure the MFBs are connected to an energized source (startup or standby). The N and E breakers also get direct trips from the two-out-of-three logic.
If a loss of power occurs on the Standby Bus when a Lee Combustion Turbine or the Central Switchyard is aligned to the Standby Bus, the Oconee Unit 1 Standby Bus 1 and 2 voltage sensing circuits will initiate a transfer of the Standby Bus to the Keowee Unit aligned to the underground power path. When the CT-5 incoming breakers (SL breakers) are closed, the Oconee Unit 1 Standby Bus #1, and Standby Bus
- 2 voltage sensing circuits are required for Oconee Units 1, 2 and 3 Standby Bus #1, and Standby Bus #2 voltage sensing circuits to be considered operable.
No protective relay lockouts or inhibits can be present to prevent the connection of required AC power-source(s) to the MFBs from the Control Room because their presence will not allow closure of the associated breaker.
APPLICABLE The EPSL voltage sensing circuits are required for the engineered SAFETY ANALYSES safeguards (ES) equipment to function in any accident with a loss of offsite OCONEE UNITS 1, 2, & 3 B 3.3.18-1 Amendment Nos. 300, 300, & 300
power. The limiting accident for the EPSL voltage sensing circuits is a loss-of-coolant accident (LOCA) with a simultaneous loss of offsite power (Ref. 1).
The EPSL voltage sensing circuits satisfy Criterion 3 of 10 CFR 50.36 (Ref. 2).
LCO Three channels of each EPSL voltage sensing circuit (Auxiliary Transformer, Startup Transformer, Standby Bus #1, Standby Bus #2) are required to be OPERABLE. These circuits and associated channels ensure that no single failure can cause a loss of required ES equipment.
The LCO is modified by two Notes. Note 1 removes Auxiliary Transformer both N breakers are open. The voltage sensing requirements when function of the Auxiliary Transformer Voltagebreakers Sensing are circuits open,is to theprovide signal to the N breakers. When the N a trip Auxiliary Transformer voltage sensing circuits are not required and, therefore, need not be OPERABLE. Note 2 requires only the EPSL voltage AC power source(s) to be sensing circuits associated with required OPERABLE when not in MODES 1, 2, 3, and 4.
When the SL breakers are closed, Oconee Unit 1 Standby Bus #1, and Standby Bus #2 voltage sensing circuits are required for Oconee Units 1, 2 and 3 Standby Bus #1, and Standby Bus #2 voltage sensing circuits to be considered operable.