ML073310613
| ML073310613 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 11/20/2007 |
| From: | Katz B Southern California Edison Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| EA-07-141, IR-07-017 | |
| Download: ML073310613 (1) | |
Text
JSOUTHERN CALIFORNIA EDISON An EDISON INTERNATIONAL Company Brian Katz Vice President November 20, 2007 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001
Subject:
Docket No. 50-361 Reply to a Notice of Violation; EA-07-141 Inspection Report No. 05000361/2007017 San Onofre Nuclear Generation Station, Unit 2
Reference:
Letter, Mr. Dwight D. Chamberlain (USNRC) to Mr. Richard M. Rosenblum (SCE), dated November 7, 2007
Dear Sir or Madam:
The reference letter transmitted NRC Inspection Report No. 05000361/2007017 to Southern California Edison (SCE). The report included a Notice of Violation which identified a violation of NRC regulations and required SCE to provide a written response within 30 days of the date of the inspection report. Based on a teleconference on November 13, 2007, between Mr. Clay E. Williams (SCE) and Mr. Michael Vasquez (NRC, Region IV), SCE understands the response to the NOV can be delayed until 30 days after the ongoing Alternative Dispute Resolution process is completed.
If you have any questions, please contact me or Mr. Clay E. Williams at (949) 368-6707.
Sincerely, cc:
E. E. Collins, Regional Administrator, NRC Region IV D. D. Chamberlain, Director, Division of Reactor Safety, NRC Region IV C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 and 3 N. Kalyanam, NRC Project Manager, San Onofre Units 2 and 3 K. D. Fuller, Regional Counsel/Allegation Coordination/Enforcement, NRC Region IV P.O. Box 128 San Clemente, CA 92674-0128 949-368-9275 Fax 949-368-9881 601_.