ML073300023
| ML073300023 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 11/15/2007 |
| From: | Morris J Duke Energy Carolinas, Duke Power Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| TAC MD4142, NRR-07-015 | |
| Download: ML073300023 (3) | |
Text
SDuke JAMES R. MORRIS DrEnergy.
Vice President Catawba Nuclear Station 4800 Concord Rd. / CN01 VP York, SC 29745-9635 803 831 4251 November 15, 2007 803 831 3221 fax U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555-0001
Subject:
Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC (Duke)
Catawba Nuclear Station, Unit 2 Docket Number 50-414 Confirmatory Action Letter CAL No. NRR-07-015 Catawba Nuclear Station, Unit 2 (TAC No.
MD4142)
Closeout Letter The subject CAL was issued by the NRC on March 20, 2007 and concerned Alloy 82/182 butt welds in the pressurizer at Catawba Nuclear Station, Unit 2.
Specifically, Item 3 of the letter required Duke to notify the NRC in writing when Catawba Unit 2 has completed the actions and commitments addressed in the letter.
Catawba Unit 2 successfully mitigated these Alloy 82/182 butt welds during the Unit 2 End-of-Cycle 15 Refueling Outage using weld overlays.
Request for Relief Number 07-GO-00,1 documented this issue and Catawba submitted all information committed to in this Request for Relief via letters dated October 25, 2007 and November 8, 2007.
Accordingly, Duke is providing this letter to formally document our closeout of the actions required by the subject CAL.
If you have any questions concerning this information, please contact L.J. Rudy at (803) 831-3084.
Very truly yours, Jies R.. Morris LJR/s www. duke-energy. com
U.S. Nuclear Regulatory Commission Page 2 November 15, 2007 Xc:
J.E. Dyer, Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-13 D13 Rockville, MD 20852-2738 W.D. Travers, Administrator, Region II U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85 Atlanta, GA 30303-8931 J.F. Stang, Jr., NRC Senior Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 A.T. Sabisch, NRC Senior Resident Inspector Catawba Nuclear Station
U.S. Nuclear Regulatory Commission Page 3 November 15, 2007 xc:
R.D. Hart L.J. Rudy K.E. Nicholson K.L. Ashe R.L. Gill, Jr.
Document Control File 801.01 RGC Date File ELL-EC050 RFR 07-GO-001 File NCMPA-1 NCEMC PMPA SREC