ML073110357

From kanterella
Jump to navigation Jump to search
EP-Rx 1.33, Nasa, Survey Unit Release Record
ML073110357
Person / Time
Site: Plum Brook
Issue date: 11/06/2007
From:
US National Aeronautics & Space Admin (NASA)
To:
NRC/RGN-III/DNMS/DB
References
EP-Rx 1.33
Download: ML073110357 (17)


Text

Swvey Unit Release Record EP-Rx 1.33 Revision # Original Page 1 of 3 Surrey Unit #(#) Rx 1.33

1) Embedded Pipe (EP)Survey Unit Rx 1.33 meets the definition of embedded pipe for Plum Brook Reactor Facility (PBRF).
2) EP Rx 1.3 3 is a. Class 1, Group 2 survey unit as per the PBRF Find Status S w e y Plan (FSSP) and Technical Basis Document (TBD)-06404.
3) Surveys in EP Rx 1.33 were performed using a scintillationdetector optimized to measwe gamma energies representative of&-60. Sample #ElP2-5 h r n Survey Request (SR)-13 was referenced for this decision.
4) Survey Instructions for this survey unit are inco& into and performed in a c c o with ~ (TAW) the Babcock Services Incorporated @SzYr,VS-OW, Work E m o n Package (WEP)05-006. Survey hrmtiolls described in this document constitute "Specid Methodsn d the survey design used in the acquisition of survey measurements.

5 ) Instrument efficiency determinations are developed in accordance with the BSKVS-002, WEP 05-006, t h e detemhations are appropriate for the types of radiation involved and the media being surveyed.

Approval Signatures Date:

FSS/Charactebtiot1 Engineer CS-0911

- LC FSS Design # EP Rx 1.33 Revision # Original Page 2 of 3 Survey Unit: Rx 1.33 1.0 ~oryIDescription 1.1 The subject pipe system is the 3" s p a line running through Quad D to the Sub Pile Room.

1.2 EP Rx 1-33 consists of 3" diameter piping that is approximately 29 feet in length.

2.0 Survey Design Wormation 2.1 EP Rx 1.33 was surveyed IAW Procsdure #BSYLVS-002.

2.2 1W/oof the 3" ID pipe w a s accesaibIe for mwey. The m i b l e 3" ID pipe was surveyed by static measurement at one foot increments, for a total of29 survey measurements.

2.3 S&eareaforthe3"IDpipiogis730cm2foreachfootofpiping comesponding to a total 3' ID piping surbce srea of 2 1,160 cm2(2.1 rd) for the entire length of (approximately 29') of 3" piping..

3.0 S w e y Unit Measurement LacatioWata 3.1 Pipe interior radiologid survey forms are provided in Attachment 2 of this release record.

4.0 Survey Unit InvestigatiodResuIts 4.1 None 5.0 Data Assessment Results 5.1 Data assessment results are provided in the EPA3uie.d Pipe (BP) Survey Report provided in Attachment I .

5 -2 41measurement results are less than the Derived Concentration Guideline Level @CGL) for radionuclide specific EP that m p o n d s to the I W y r dose goal established in Table 3-3 of the FSSP.

5.3 When implement* the Unity Rule, provided in Section 3.6.3 of the FSSP, and applying the Nuclide Fraction @F), provided in TBD-QB-004, the survey unit ihat is constituted by EP Rx 1.33 passes FSS.

5.4 Background was not ~~ fiom the survey measurements and the Elevated Measurement Comparison @MC) was not employed h r this survey unit.

FSSDesign#EPRx 1,33 Revision # O&hd 1 P a p 3 of 3 Survey Unit: Rx 1.33 5 .$ Statistical Summary Table Number of MeasurementsSMOG 16 Plumber of MeasurementsAbwe 5096 of DCGL 0 Number of MeasurementsA b w DCGL 0 Mean -

0.0q20 Stmdard W i d o n 0.W136 Maximum 0.0215 Minknum ch0046

~~n of evaluations pertaining to compliance with the h c t e d use limit of25 mremlyr and dose mtributions h m Embedded Pipe and rudionuclides contributing 10% in aggregate ofthe total dose for both structural d o s and soils.

6.1 A review ofthe swey r e d t a has shown that the dose contribution for EP Rx E .33 to be lm than 1 mrem/yr. The dose contribution is estimated to be 0.012 m d y r based on the average of the actual gross counts measured.

Atmw Attdmmt 1 -BSI EPlsP Survey Report Attachment 2 -Pipe Intaior Radiologid Survey Form

-3 -DQAWorksbeet

&hdment 4 -Disc containing RR for EP Rx 1.33 & Spread&&

SECTION 7 ATTACHMENT l 3 PAGE@)

EP Rx I.33 3" Pipe TBD 06404 Group 2

SECTION 7 ATTACHMENT 2 6 PAGE(S)

' Pipe Interior Radiological Survey Form Date: 1-1 6-0 6 Time: /020 Building: Q Elevation -37 Access Point 9 ~ '

System: 5 Qaw~ t S)P R pipe Diameter: %T 1' Area:

&ea

( I 1 Type of Survey Investigation Characterization Sled Size & " 6' / N ~ L@ ~ L635 L inch Detector: YY-6 Z Detector ID #: 2 / ~ 7 8 / qd/&(-

Cal Date: //-I 7 - 0 ~ ~ Cal Due Date: I/-/ 7-Db Instrument: 3 .Fop( Instrument ID #: Z / Z Z Z ~

Cal Date: / 1-17-43J- Cal Due Date: //-/7-0 @

From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value 5- cpm MD CRstatic qrV cpm Efficiency Factor for Pipe 0. 0 0 0 B (taken from detector V

WE:~: 2779 dpm/100cm2 Is the MDCsbtic @ NO (if no, adjust sample count time and recalculate MDCR,tatic)

~ d f f i ~ e t B k ? = ? ,J,r,14-L ~ U U W VOJH I - /y ~ ~ 4 b --l=dZcrm d sPK (-S W R fl~~<&@drn)

Pipe Interior Radiological Survey Radiological Survey Commenced: Date: / -/b -0b Time: / O Z0 Package Page 1 of Attachment 3, Page 1 REFERENCE COPY

Package Page 2of &

A'ttachment 3, Page 2

Pipe Interior Radiological Survey Form Date: /'/7--OGP Time: 0 ZOJ" Building: &\.c Elevation: -- Z,"5 Access Point Area: Qd# 0 13 V System: 5 Q,Gj+yy- 7-8 5 PE Pipe Diameter: e e : t h : r @Y /.+21 Type of Survey Investigation Characterization inal Survey . I Sled Size .3" rJ(NYL Q ~ U L G C ~ S/d Detector: YY-d; z Detector ID #: ,J,/27&/ /a/ -

Cal Date: //-17 -of Cal Due Date: / / V 7 -8 6 Instrument: 2 3 ~ 7 3 -/ Instrument ID #: z/ 2-ZZ 3 Cal Date: 1 / - / 7 -0 5- Cal Due Date: //-if 7 -0 6 From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value J(: 7 cpm MDCRsbtic I/, 3 CPm Efficiency Factor for Pipe Diameter 0.0- (taken from detector

='-

MDCstatic 2714 dpm/10ocm2 Is the MDCstaticacceptable?

Comments: CO a

r 1 Q K A U @ ~3, No (if no, adjust sample count time and recalculat'e MDCRSuti,)

- , ~ ( t 2 - d h/fl

~ Ohl /-I 6 -0 6 psr rc i - mad r-rz qu4-a D

&"N4/e 7f

=c-Pipe Interior Radiological Survey Radiological Survey Commenced: Date: / -/.7- 0 Time: 0 Package Page 1 of Attachment 3, Page 1

Package Page 2-of L Attachment 3, Page 2

'a.

'  ! -.0 VI

<4 -

$.. f

.,(

8.

1

  • '* ej fi

( ?2 65 It-

SECTION 7 ATTACHMENT 3 1 PAGE(S)

DQA Check Sheet Design # Rx 1.33 Revision # Original Survey Unit # Rx 1.33 Preliminary Data Review' Answers to the following questions should be fully documented in the Survey Unit Release Record Yes No N,A

1. Have surveys been performed in accordance with survey instructions in the Survey Design? X
2. Is the instrumentation MDC for structure static measurements below the D C G h for Class 1 and 2 survey units, or below 0.5 D C G h for Class 3 survey units? X
3. Is the instrumentation MDC for ernbeddedlburied piping static measurements below the DCGLW? X
4. Was the instrumentation MDC for structure scan measurements, soil scan measurements, and embeddedlburied piping scan measurements below the DCGLw, or, if not, was the need for additional X static measurements or soil samples addressed in the survey design?
5. Was the instrumentation MDC for volumetric measurementsand smear analysis < 10% DCGLw ? X
6. Were the MDCs and assumptions used to develop them appropriate for the instruments and techniques used to perform the survey?
7. Were the survey methods used to collect data proper for the types of radiation involved and for the X

media being surveyed?

8. Were "Special Methods" for data collection properly applied for the survey unit under review? X
9. Is the data set comprised of qualified measurement results collected in accordance with the survey X

design, which accurately reflects the radiological status of the facility3 Graphical Data Review I. Has a posting plot been created? X

2. Has a histogram (or other frequency plot) been created? X CS-0912 Page 1 of 1

SECTION 7 ATTACHMENT 4 1 DISC