MONTHYEARML0730400922007-12-17017 December 2007 Letter Inquiring About Decommissioning Trust Funds Project stage: Other ML0800901802008-01-0909 January 2008 Request for Information Concerning Biennial Decommissioning Fund Report (TAC Nos. MD5057 and MD5058): Confirmation of Schedule Extension Project stage: Request ML0804601862008-02-14014 February 2008 Response to Request for Information Concerning Biennial Decommissioning Fund Report Project stage: Response to RAI 2008-01-09
[Table View] |
|
---|
Category:Letter
MONTHYEAR05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML24162A0882024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24141A1502024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 ML24123A2272024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report ML24088A3302024-04-0404 April 2024 Regulatory Audit Plan in Support of License Amendment Request to Implement Framatome Gaia Fuel ML24093A2162024-04-0101 April 2024 Response to Request for Additional Information Regarding License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24093A1022024-04-0101 April 2024 Alternative Request IR-4-13, Proposed Alternative Request to Support Steam Genera Tor Channel Head Drain Modification IR 05000336/20240112024-04-0101 April 2024 Comprehensive Engineering Team Inspection - Inspection Report 05000336/2024011 and 05000423/2024011 ML24092A0752024-03-28028 March 2024 3R22 Refueling Outage Inservice Inspection (ISI) Owners Activity Report Extension ML24088A2352024-03-26026 March 2024 Decommissioning Funding Status Report 2024-09-04
[Table view] |
Text
December 17, 2007 Mr. David A. Christian President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION: UNIT NOS. 2 AND 3 - REQUEST FOR INFORMATION CONCERNING BIENNIAL DECOMMISSIONING FUND REPORT (TAC NOS. MD5057 AND MD5058)
Dear Mr. Christian:
Upon review of the biennial decommissioning funding status report for the Millstone Power Station, Unit Nos. 2 and 3 (MPS2 and MPS3), the Nuclear Regulatory Commission (NRC) staff has become aware of a reduction in the reported balance of your radiological decommissioning funds set aside in an external trust to meet the requirements of Title 10 to the Code of Federal Regulations (10 CFR) Section 50.75. This observation was based on information filed by you this past March 2007 providing information as of December 31, 2006, and a comparison with the March 2005 biennial report providing information as of December 31, 2004.
During a follow-up telephone conversation, your staff provided the NRC staff information that such reductions were not the result of withdrawals from the trust, but were the result of changes in accounting for the funds in the trust. In particular, the NRC staff understands that you have adjusted your accounting to re-allocate funds in the decommissioning trust earmarked for radiological decommissioning to funds for non-radiological purposes and/or funds for spent fuel management.
Withdrawals or disbursements from trust funds for decommissioning established to meet NRC requirements in 10 CFR 50.75 are restricted under 10 CFR 50.82(a)(8) and trust agreement provisions that are required by the 2001 license transfer conditions. The reduction in the reported balance of your radiological decommissioning funds raises a question as to whether there has been full compliance with the foregoing restrictions.
Accordingly, pursuant to 10 CFR 50.33(f)(4), please provide, within 30 days of the date of this letter, a full written explanation as to whether the reduction in the reported balance of your radiological decommissioning funds from the balance previously reported constituted a withdrawal or disbursement within the scope of the NRC's restrictions on withdrawals or disbursements.
If you have any questions, please contact Mr. Michael Dusaniwskyj at (301) 415-1260.
Sincerely,
/ra/
John D. Hughey, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-336 and 50-423
If you have any questions, please contact Mr. Michael Dusaniwskyj at (301) 415-1260.
Sincerely,
/ra/
John D. Hughey, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-336 and 50-423 DISTRIBUTION:
PUBLIC LPL1-2 R/F RidsNrrDorlLpl1-2 RidsNrrPMJHughey RidsAcrsAcnwMailCenter RidsOgcRp MDusaniwskyj SHom RidsNRRDpr RidsNrrDorl JLubinsky RidsNrrLAABaxter RidsRgn1MailCenter RCarlson ADAMS Accession NO.: ML073040092 OFFICE PFPB PFPB/BC LPL1-2/GE LPLI-2/PM LPLI-2/LA LPLI-2/BC NAME MDusaniwskyj RCarlson CSanders JHughey ABaxter HChernoff DATE 11/29/07 12/3/07 12/7/07 12/7/07 12/10/07 12/17/07 OFFICIAL RECORD COPY
Millstone Power Station, Unit Nos. 2 and 3 cc:
Lillian M. Cuoco, Esquire Mr. Joseph Roy Senior Counsel Director of Operations Dominion Resources Services, Inc. Massachusetts Municipal Wholesale Building 475, 5th Floor Electric Company Rope Ferry Road P.O. Box 426 Waterford, CT 06385 Ludlow, MA 01056 Edward L. Wilds, Jr., Ph.D. Mr. William D. Bartron Director, Division of Radiation Licensing Supervisor Department of Environmental Dominion Nuclear Connecticut, Inc.
Protection Building 475, 5th Floor 79 Elm Street Roper Ferry Road Hartford, CT 06106-5127 Waterford, CT 06385 Regional Administrator, Region I Mr. J. Alan Price U.S. Nuclear Regulatory Commission Site Vice President 475 Allendale Road Dominion Nuclear Connecticut, Inc.
King of Prussia, PA 19406 Building 475, 5th Floor Rope Ferry Road First Selectmen Waterford, CT 06385 Town of Waterford 15 Rope Ferry Road Mr. Chris L. Funderburk Waterford, CT 06385 Director, Nuclear Licensing and Operations Support Charles Brinkman, Director Innsbrook Technical Center Washington Operations Nuclear Services 5000 Dominion Boulevard Westinghouse Electric Company Glen Allen, VA 23060-6711 12300 Twinbrook Pkwy, Suite 330 Rockville, MD 20852 Mr. David A. Sommers Dominion Resources Services, Inc.
Senior Resident Inspector 5000 Dominion Boulevard Millstone Power Station Glen Allen, VA 23060-6711 c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Mr. J. W. "Bill" Sheehan Co-Chair NEAC 19 Laurel Crest Drive Waterford, CT 06385 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terrys Plain Road Simsbury, CT 06070