Page 1 of 1 Justin Leous -Vogtle Environmental Site Audit Follow Up From: Justin Leous To: Dale Lane Fulton; tcmoorer@southernco.com Date: 10/23/2007 9:41 AM

Subject:

Vogtle Environmental Site Audit Follow Up CC: bobbie.hurley@earthtech.com; D. Ashley; Louise Lund; Rani Franovich Good morning, Dale and Tom.Per the Site Audit Exit Briefing, please find attached our post-audit information requests (in 3 documents).

As we discussed, I trust about a week's turn-around should be sufficient to gather this information on your end and send it over- but please keep me posted so I can advise NRC staff accordingly.

Should you have any questions regarding the attached requests, please let me know.Regards, JP Leous US NRC 301.415.2864 file://C:\temp\GW}

00001 .HTM 10/30/2007 11-CAt6ýi'p-\GWý00067'IMP

.....5 \teriip\GW}00007 TMP ~ p~Thj Mail Envelope Properties (471DF9F6.877:

7 : 9160)

Subject:

Creation Date From: Created By: Recipients earthtech.com AM Vogtle Environmental Site Audit Follow Up 10/23/2007 9:41:10 AM Justin Leous JPLI @nrc.gov Action Transferred Date & Time 10/23/2007 9:41:33 Bobbie.Hurley CC (bobbie.hurley@earthtech.com) nrc.gov OWGWPO01 .HQGWDOO1 AM DJA1 CC (D. Ashley)PM nrc.gov OWGWPOO2.HQGWDOO1 AM RLF2 CC (Rani Franovich)

AM nrc.gov TWGWPOO1 .HQGWDOO1 AM LXL CC (Louise Lund)PM Delivered Opened Delivered Opened Delivered Opened Transferred 10/23/2007 9:41:18 10/23/2007 12:23:16 10/23/2007 9:41:18 10/23/2007 10:36:46 10/23/2007 9:41:10 10/23/2007 2:11:04 10/23/2007 9:41:33 southemco.comr AM DLFULTON (Dale Lane Fulton)TCMOORER (tcmoorer@southernco.com)

Post Office Delivered Route earthtech.com OWGWPOO1.HQGWDOOI OWGWPOO2.HQGWDOO1 TWGWPOO1 .HQGWDOO1 10/23/2007 9:41:18 AM nrc.gov 10/23/2007 9:41:18 AM nrc.gov 10/23/2007 9:41:10 AM nrc.gov southemco.com Files Size Date & Time Kc \ternp\GW}00007.TMP Pg MESSAGE 1074 TEXT.htm 846 After Audit Info Request 3_hydrology.doc AM After Audit Info Request 1 .doc 89600 After Audit Info Request 2.doc 68096 10/23/2007 9:41:09i 29184 10/22/2007 1:27:181 10/23/2007 9:35:20 )10/23/2007 9:24:14 Options Auto Delete: Expiration Date: Notify Recipients:

Priority: ReplyRequested:

Return Notification:

Concealed

Subject:

Security: To Be Delivered:

Status Tracking: No None Yes Standard No None No Standard Immediate Delivered

& Opened HYDROGEOLOGY REVIEW FOR VOGTLE AUDIT 1. The non-radioactive resins and sludge are disposed of offsite in a permitted industrial landfill, with an average volume of __ pounds per year. Mike Odum stated that six roll-off containers are sent for permitted industrial landfill last year. Please provide the estimate pounds of waste from the waste manifest of non-radiological resins and sludge disposal.2. The hazardous waste consists of listed waste streams, and in 2006, comprised a total of __ pounds of hazardous waste. Mike Odum stated in 2006, two 55 gallon drums (300 Ibs) of haz-waste was sent for disposal and in 2007, two 55 gallon drums of haz-waste was sent for disposal.

Please provide a summary of the types of waste and weight in pounds from the waste manifests.

3. The VEGP Waste Minimization Plan includes procedures for evaluating and reducing the generation of the following types of wastes. Mike Odum stated during the audit the general waste types include: Oily Rags and Resins; Light Bulbs (universal wastes);Batteries

& Capacitors (universal waste); Asbestos; and Used Oils. Please verify the list and provide a copy of the Waste Minimization Plan.4. Earth Tech currently has the pre-operational estimates of water withdrawal from the Savannah River based on the maximum withdrawal capacity of the pumps in the intake structure (89 cfs, with an average estimated consumptive use of 33.4 cfs per unit, or 66.8 cfs for the entire facility.

Tom Moore stated the monthly withdrawals are located in the information docket and Mike Odum referenced an average withdrawal of 64 mgd from Savannah River intake. He also mentioned that Don Goodwin has the run-time for pumps and submits them in monthly reports to state. Please provide monthly withdrawals for the pumps for the last 5 years.5. Tom Moore was gracious enough to explain the difference between the CWS and NSCW cooling systems numerous times to NRC and Earth Tech. In addition, Figure 3.3 of the Environmental Study, March 1974 presents a diagram. For purposes of clarity please revise the following descriptions:

The Cooling Water System (CWS) which includes the two 500 ft cooling tower receives water from the Savannah River and circulates the water through the turbine plant. Blow down water from the cooling towers is discharged back into the Savannah River. The (NSCW) system is design for Safety Reactor Cooling and as an Ultimate Heat Sink. The NSCW utilizes groundwater from four wells (MV-1 and MV-2 and backup wells TW-1 and TW-2) for operation.

The system has four 80 ft deep cooling sumps with fans that receive the NSCW water and discharge the blow down to the Savannah River.6. Please provide the 2006 VEGP Surface Water Quality Monitoring Program Report.7. Please provide the NPDES Discharge Monitoring Reports for the last 5 years.

8. Tom Moore stated that there is no minimum level established to curtail surface water withdrawal from the Savannah River in the case of a drought. Instead, a Drought Plan (which is part of the Surface Water Withdrawal Permit) and Drought Task Force has been established with the US Army Corps of Engineers to address river flow and withdrawals.

There are four Action Levels that are based on the release from Thurmond Dam. At a pool of 312 ft msl in Thurmond Dam, the minimum flow is 3800 cfs. With the current Georgia drought the measuring station in Waynesboro has not dropped below 4000 cfs. Please verify the above summary and add information on the four response levels, especially Level 3 and 4 when the flow is below 3800 cfs.9. Please provide a copy of the Surface Water Withdrawal Permit and the Groundwater Withdrawal Permit.10. Gary Gunter with Tetra Tech stated that information from the UFSAR was used to develop a spreadsheet model for groundwater drawdown for the new reactor licensing.

Both "confined nonleaky aquifer" and "confined leaky aquifer" drawdowns were modeled.Please provide the hydrogeologic data and calculation package on the groundwater that VEGP used in the ER for the Proposed Reactor Units 3 and 4. Earth Tech would like to be able to re-create the model's output.

'Document IReport~lData Requested for_______ Referenc&e Review~ Comments Location Addendum Report: Intensive Archaelogoical Survey of the Proposed Expansion Areas at the Vogtle Electric Generating Plant, Burke County, Georgia. New South Associates, Stone Mountain, Al NSA 2006b Georgia.Addendum Report: Phase 1 Intensive Archaelogoical Survey of the Proposed Expansion Areas at the Vogtle Electric Generating Plant, Burke County, Georgia. New South Associates, Stone Mountain, A2 NSA 2007 Georgia.Vogtle Units 1 & 2 10 CFR 50.75 cg Actions for Potential Groundwater Leak/Spill Contamination Events, 1980s -Decomissioning Blue folder A3 SNOC 2007 Record available at audit.Cover letter in blue folder Letter from J.M. Godfrey to NRC provideD at audit.Document Control Desk, 2006 Need coies of Annual Occupational Radiation contents of blue SNOC April 4, Exposure Report (for Hatch, Farley, folder and copy of A4 2007 and Vogtle) report itself.Intracompany correspondence, VEGP -Units 1 &2, Conceptual SNOC April 30, Design for a Low Level Radwaste Blue folder A5 2007 Pad at Plant Vogtle available at audit.Plant Alvin W. Vogtle Nuclear SNOC April Generating Plant Groundwater Blue folder A6 2007 Monitoring Plan for Radionuclides available at audit.Offsite Dose Calculation Manual for Southern Nuclear Operating SNOC January Company Vogtle Electric Blue folder A7 2007 Generating Plant, Version 23. available at audit.Copies of Radiological Environmental Monitoring Reports A8 SNOC for last 5 years Copies of Non-Radiological Environmental Monitoring Reports A9 SNOC for last 5 years Copies of NPDES self-monitoring A10 SNOC reports for last 5 years Southeastern Natural Sciences Draft Savannah River Water Quality Gene Eidson, All Academy Study 7/1/2007 Current water withdrawel rates from SRS A12 A13 SNOC VEGP Waste Minimization Plan Groundwater Monitoring data from.first round testing of NEI A14 SNOC groundwater initiative Information on Safe Harbor A15 SNOC Program List of water additives and A16 SNOC application rates List of herbicides used on site and A17 SNOC on transmission lines A18 SNOC Information on WINGS Current version of Land A19 SNOC Management Plan Bathymetric map and cross-A20 SNOC sections of Savannah Rvier Habitat Utilization and Biological Characteristics of Adult Atlantic Sturgeon in Two South Carolina Rivers, Transactions of the Collins, et al. American Fisheries Society, Reference Book ER1 2000 129.982-988,2000 1, Chapter 2 Characteristics of the Adult Segment of the Savannah River Collins and Population of Shortnose Sturgeon, Reference Book ER2 Smith 1993 1993 Prc. Anu. Conf. SEAFWA 1, Chapter 2 Georgia Department of Natural Resources.

Authorization to Dishcarge under the National Pollutant Discharge Elimination System. Permit No. GA0026786.

Environmental Protection Division, Reference Book ER3 GDNR 2004 Atlanta. May 21, 2004. 4, Chapter 3 SNC 2000a -Reference Book ER4 2004b, 2005b Groundwater Use Reports 4, Chapter 3 Vogtle Early Site Permit Application, SNOC April Part 3, Environmnetal Report, May be proprietary Reference Book ER6 2007 Revision 2 and confidential.

5, Chapter 4 Draft Environmental Assessment Finding of No Significant Impact, USACE May Drought Contingency Plan Update, Reference Book ER7 2006 Savannah River Basin 5, Chapter 4 Hydrogeoogy ER8 SNC 2005 Calculation Package Aquifer Test Data Reference Book 3 Savannah River Basin USACE July Comprehensive Reconnaissance ER9 1999 Study Reference Book 3 ER1 0 Entire notebook contents SNOC Permits and Caculation Packaaes Reference Book 9 Safe Drinking Water Information System, List of Water Systems in SDWIS for the state of Georgia in USEPA Columbia County, January 16, http://oaspub.epa.gov/enviro, ER1 1 2005 Accessed on February 21, 2005 Reference Book 2 Stratigraphy and Depositional Environments of Sediments from Five Cores from Screven and Burke Counties,Georgia.

US Geological ER12 USGS undated Survey Professional Paper 1603-A Reference Book 2 Huddlestun The Lithostratigraphic Freamework and of the Uppermost Creataceous and Summerour Lower Tertiary of Eastern Burke ER13 1996 County Georgia Reference Book 2 Office of Transportation Data 2005 ER14 GDOT 2005 Annual Average Daily Traffic Report Reference Book 2

  1. D .1nt jRqfere~nce j " ~RpporlslD eta Requested for Review Comments________i ' !m~ ~ii

.........o m... .'"n.. .en -==Arnett, M. 2001. 2000 Savannah River Biological Surveys for Westinghouse Savannah River Company. Prepared for WSRC by Patrick Center for Environmental Research, Philadelphia Academy of Natural Sciences, PhiladelDhia.

PA. December 2001.Reference Book 1, Chaoter 2 1 Arnett 2001 Bailey, M. M., J. I. Isley, and W. C. Bridges. 2004.Movement and population size of American shad near a low-head Bailey et al. lock and dam. Transactions of the American Reference Book 1, 2 2004 Fisheries Society 133: 300-308. Chapter 2 Bennett, D.H. and R. W. McFarlane.

1983. The Fishes of the Savannah River Plant: National Bennett and Environmental Research Park. Prepared by McFarlane Savannah River Ecology Laboratory for the U.S. Reference Book 1, 3 1983 Department of Energy. Chapter 2 Burke County "Tax Digest- Real and Personal Property," facsimile Tax transmission from Cynthia McManus, Burke County Commission Tax Commissioner, to N. Hill, TTNUS, January 5, Reference Book 1, 4 2006 2006. Chapter 2 U.S. Department of Energy. 1987. Impingement and Entrainment at the River Water Intakes of the Savannah River Plant. Savannah River Operations 5 DOE 1987 Office, Aiken, SC 1987. Reference Book 2 E. I. du Pont de Nemours & Co. 1987.Comprehensive Cooling Water Study, Volume V: Also need Volume 1. Could Aquatic Ecology. DP-1 739-5. Savannah River not locate in ER Reference 6 DuPont 1987 Laboratory, Aiken, SC. Books.

u~otvand A. J., J. i. msner, u;. t-. uDersi, ana] U. L.Calhoun. Water Resources Data-Georgia, 2004.Volume 1: Continuous water-level, streamflow water-quality, and periodic water-quality data, Water Year 2004, B.E. McCallum and D.V. Alhadeff (compilers):

Reston, Va., U.S. Geological Survey Water Data Reoort GA 04-1. 2005.Gotvald et al.2005 7 Holt reauested durina auidt.Reference Book 2 Georgia Department of Transportation.

1987.General Highway Map of Columbia County, Georgia with Traffic Count Locations, Division of Planning and Programs, Data Planning Services, in cooperation with the U.S. Department of Transportation, Federal Highway Administration, Atlanta, GA, Last Revised 8 GDOT 1987a 1987. Reference Book 2 Georgia Department of Transportation.

1987.General Highway Map of Burke County, Georgia with Traffic Count Locations, Division of Planning and Programs, Data Planning Services, in cooperation with the U.S. Department of Transportation, Federal Highway Administration, Atlanta, GA, Last Revised 9 GDOT 1987b 1987. Reference Book 2 Georgia Department of Transportation.

1992.General Highway Map of Richmond County, Georgia with Traffic Count Locations,.

Division of Planning and Programs, Data Planning Services, in cooperation with the U.S. Department of Transportation, Federal Highway Administration, Atlanta, GA, Last Revised 10 GDOT 1992 1992. Reference Book 2 Georgia Department of Transportation.

1999. City Map of Augusta, Richmond County with Traffic Count Locations, Division of Planning and Programs, Data Planning Services, in cooperation with the U.S.Department of Transportation, Federal Highway 11 GDOT 1999 Administration, Atlanta, GA, Last Revised 1991. Reference Book 2

~Document#Ref ere~nc e ' Repor-ts/Data Reguestpd for Review CommnentsA Location~z Georgia Department of Transportation.

2005. Fax from Ron Battle, Office of Communications, Photocopies of Road Capacity Information from the 12 GDOT 2005 Highway Capacity Manual 2000, August 22, 2005. Reference Book 2 Georgia Power Company. 1997. Georgia Power Transmission Bulletin Number 6-10, "Maintenance of Plant Vogtle Transmission Line Corridors," Atlanta, 13 GPC 1987 Georgia, May 8, 1997. Accessed 12/16/05.

Reference Book 2 Georgia Power Company. "Electrical Design Parameters of Typical 230 kv and 500 kv Transmission Lines Terminating into Plant Vogtle." Transmitted by email from Dennis Mize (GPC) to Could not locate in ER 14 GPC 2005 Steven Connor (TtNUS) on July 12, 2005. Reference Books.D McCuallister and JR. MStatffew.

1980. Atlasogica leNorth Amern Freshwatertnishes.

Stu orthgeo oina 15 M Lee etal 1980 State Museum L eur , leih, NCa RDdahas B.~C;, BCD. E. Fletcher, F.D.Martin, M.F1.1Paller.

Matthews Plant DPST-83-754.

E. I du Pont de Nemours and"17 1983 Company. Aiken, S.C. October. Reference Book 2 National Oceanic and Atmospheric Administration and Georgia Department of Natural Resources.

2003. State of Georgia Coastal Management Program and Program Document.

NOAA Office of NOAA and Ocean and Coastal Resources Management and Could not locate in ER 18 GDNR 2003 GDNR Coastal Resources Division.

June 2003. Reference Books.

bocument -_Reference prtsl/ta Regestd for Review Coatmments Lcaton U.S. Nuclear Regulatory Commission?

1985. Final Environmental Statement Related to the Operation of Vogtle Electric Generating Plant Units 1 and 2, Docket Nos. 50-424 and 50-425, Georgia Power Could not locate in ER 19 NRC 1985 Company, et al. Washington, D.C. March. Reference Books.Southern Nuclear Operating Company. 2003. Wildlife Habitat Council 2003 Recertification Application for Voatle Electric Generatincl Plant. July.Wike, L.U., I-. U. Martin, L. A. Nelson, N.V Halverson, J.J. Mayer, M. H. Paller, R. S. Riley, and M. G. Serrato. 2006. SRS Ecology Environmental Information Document.

WSRC-TR-2005-00201.

Prepared for the U.S. Dept. of Energy by Westinghouse Savannah River Company, Savannah River Site, Aiken, SC. March.Wike et al.2006 22 22 I I Kaa monitoring vveiis -zo new weiis nave Deen installed with the completion of the last well near the discharge ditch at the Savannah River. Please provide any monitoring data that may be available for 24 NA the new wells.Please provide a description of the following areas and monitoring data that may have been collected in the past 5 years: Rad Waste Storage Area;Non-Rad Waste Storage Area; Hazardous Waste Storage Area. (NPDES Permit Sampling);

Low Level Rad Waste Shipping Building; Fire Training Area;Landfills

-Construction LF #3; Asbestos and Closed 25 NA Landfills; Rifle Range; and Sewage Treatment Plant.-.4-