MONTHYEARML23065A0702023-03-0606 March 2023 Bru 2022301 2B Exam Administrative Items IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 ML21034A6212021-02-0303 February 2021 301 2B (Normal Release) Exam Administrative Items ML21034A6222021-02-0303 February 2021 301 2A Exam Administrative Items (2 Year Delayed Release) ML21034A6252021-02-0303 February 2021 301 2A Exam Final Items (2 Year Delayed Release) ML21015A0162021-01-15015 January 2021 301 1A Final RO Written Exam (2-Year Delayed Release) ML21015A0202021-01-15015 January 2021 301 1A Final SRO Written Exam (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20339A4052020-11-30030 November 2020 Operator Licensing Examination Approval 05000325/2020301 and 05000324/2020301 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19115A2282019-04-25025 April 2019 Exam 2019-301, Exam Administrative Items (Normal Release) ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML19004A3402019-01-0303 January 2019 Operator Licensing Examination Approval 05000325/2019301 and 05000324/2019301 ML18239A4532018-08-27027 August 2018 302 Exam Administrative Items (ADAMS-2D)- Delay Release 2 Yrs ML18239A4522018-08-27027 August 2018 302 Exam Administrative Items (ADAMS-2C)- Delay Release 2 Yrs ML18239A4482018-08-27027 August 2018 302 Exam Final Items (ADAMS-2B)- Delay Release 2 Yrs ML18239A4462018-08-27027 August 2018 302 Examination Draft Items (ADAMS-2A)- Delay Release 2 Yrs RA-18-0049, Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-3012018-06-25025 June 2018 Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 IR 05000324/20183012018-06-25025 June 2018 Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 ML18110A3212018-04-16016 April 2018 March 2018 - Brunswick NRC Generic Fundamentals Examination Results ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination IR 05000324/20173022017-12-12012 December 2017 (Retake) Operator Licensing Examination Approval 05000325/2017302 and 05000324/2017302 ML17298B1732017-10-25025 October 2017 05000325/2017-301 and 324/2017-301 Exam Administrative Items ML17298B1312017-10-25025 October 2017 05000325/2017-301 and 05000324/2017-301 Exam Draft Items ML17298B1612017-10-25025 October 2017 05000325/2017-301 and 324/2017-301 Exam Final Items ML17263A6222017-09-20020 September 2017 Reactor Operator and Senior Reactor Operator License Post-Examination Documentation and Comments 05000325/2017301 and 05000324/2017301 Post Exam Comments ML17263A6012017-09-20020 September 2017 Final RO Written as Given and Answer Sheet - Delay Release 2 Yrs ML17263A6042017-08-0808 August 2017 Final SRO Written as Given and Answer Sheet - Delay Release 2 Yrs ML17201B5072017-07-18018 July 2017 Operator Licensing Written Examination Approval 050003252017301 and 050003242017301 ML17181A3862017-06-30030 June 2017 Exam Draft Items 2A - Delay Release ML17181A3952017-06-30030 June 2017 Exam Final Items 2B - Delay Release ML17181A4012017-06-30030 June 2017 Exam Administrative Items 2C - Delay Release ML17181A3342017-06-30030 June 2017 Brunswick 2015301 ADAMS 2D - Exam Admin Items ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17012A3042017-01-27027 January 2017 Final RO Written Exam - Delay Release 2 Yrs ML17017A3852017-01-27027 January 2017 Final SRO Written Exam - Delay Release 2 Years ML17017A3892017-01-27027 January 2017 Post-Exam Comment - Delay Release 2 Yrs ML16334A5322016-11-21021 November 2016 Operator Licensing Written Examination Approval 05000325/2016301 and 05000324/2016301 ML16007A2122016-01-0707 January 2016 Initial Exam 2015-301 Post Exam Comments BSEP 15-0105, Reactor Operator and Senior Reactor Operator License Post-Examination Documentation and Comments2015-12-21021 December 2015 Reactor Operator and Senior Reactor Operator License Post-Examination Documentation and Comments BSEP 15-0018, Updated Information Regarding Operator Licensing Examinations2015-03-0505 March 2015 Updated Information Regarding Operator Licensing Examinations ML14350A1732014-12-16016 December 2014 Initial Exam 2014-301 Final Administrative JPMs ML14350A1682014-12-16016 December 2014 Initial Exam 2014-301 Final Simulator In-Plant JPMs ML14350A1612014-12-16016 December 2014 Initial Exam 2014-301 Final Simulator Scenarios ML14350A1582014-12-16016 December 2014 Initial Exam 2014-301 Final Administrative Documents ML14350A1552014-12-16016 December 2014 Initial Exam 2014-301 Draft Administrative JPMs 2023-03-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23065A0702023-03-0606 March 2023 Bru 2022301 2B Exam Administrative Items IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 ML21034A6222021-02-0303 February 2021 301 2A Exam Administrative Items (2 Year Delayed Release) ML21034A6252021-02-0303 February 2021 301 2A Exam Final Items (2 Year Delayed Release) ML21034A6212021-02-0303 February 2021 301 2B (Normal Release) Exam Administrative Items ML21015A0202021-01-15015 January 2021 301 1A Final SRO Written Exam (2-Year Delayed Release) ML21015A0162021-01-15015 January 2021 301 1A Final RO Written Exam (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20339A4052020-11-30030 November 2020 Operator Licensing Examination Approval 05000325/2020301 and 05000324/2020301 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19115A2282019-04-25025 April 2019 Exam 2019-301, Exam Administrative Items (Normal Release) ML19004A3402019-01-0303 January 2019 Operator Licensing Examination Approval 05000325/2019301 and 05000324/2019301 ML18239A4462018-08-27027 August 2018 302 Examination Draft Items (ADAMS-2A)- Delay Release 2 Yrs ML18239A4522018-08-27027 August 2018 302 Exam Administrative Items (ADAMS-2C)- Delay Release 2 Yrs ML18239A4532018-08-27027 August 2018 302 Exam Administrative Items (ADAMS-2D)- Delay Release 2 Yrs ML18239A4482018-08-27027 August 2018 302 Exam Final Items (ADAMS-2B)- Delay Release 2 Yrs RA-18-0049, Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-3012018-06-25025 June 2018 Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 IR 05000324/20183012018-06-25025 June 2018 Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 ML18110A3212018-04-16016 April 2018 March 2018 - Brunswick NRC Generic Fundamentals Examination Results BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination IR 05000324/20173022017-12-12012 December 2017 (Retake) Operator Licensing Examination Approval 05000325/2017302 and 05000324/2017302 ML17298B1312017-10-25025 October 2017 05000325/2017-301 and 05000324/2017-301 Exam Draft Items ML17298B1732017-10-25025 October 2017 05000325/2017-301 and 324/2017-301 Exam Administrative Items ML17298B1612017-10-25025 October 2017 05000325/2017-301 and 324/2017-301 Exam Final Items ML17263A6222017-09-20020 September 2017 Reactor Operator and Senior Reactor Operator License Post-Examination Documentation and Comments 05000325/2017301 and 05000324/2017301 Post Exam Comments ML17263A6012017-09-20020 September 2017 Final RO Written as Given and Answer Sheet - Delay Release 2 Yrs ML17263A6042017-08-0808 August 2017 Final SRO Written as Given and Answer Sheet - Delay Release 2 Yrs ML17201B5072017-07-18018 July 2017 Operator Licensing Written Examination Approval 050003252017301 and 050003242017301 ML17181A4012017-06-30030 June 2017 Exam Administrative Items 2C - Delay Release ML17181A3952017-06-30030 June 2017 Exam Final Items 2B - Delay Release ML17181A3862017-06-30030 June 2017 Exam Draft Items 2A - Delay Release ML17181A3342017-06-30030 June 2017 Brunswick 2015301 ADAMS 2D - Exam Admin Items ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17012A3042017-01-27027 January 2017 Final RO Written Exam - Delay Release 2 Yrs ML17017A3852017-01-27027 January 2017 Final SRO Written Exam - Delay Release 2 Years ML17017A3892017-01-27027 January 2017 Post-Exam Comment - Delay Release 2 Yrs ML16334A5322016-11-21021 November 2016 Operator Licensing Written Examination Approval 05000325/2016301 and 05000324/2016301 ML16007A2122016-01-0707 January 2016 Initial Exam 2015-301 Post Exam Comments BSEP 15-0018, Updated Information Regarding Operator Licensing Examinations2015-03-0505 March 2015 Updated Information Regarding Operator Licensing Examinations ML14350A1612014-12-16016 December 2014 Initial Exam 2014-301 Final Simulator Scenarios ML14350A1732014-12-16016 December 2014 Initial Exam 2014-301 Final Administrative JPMs ML14350A1682014-12-16016 December 2014 Initial Exam 2014-301 Final Simulator In-Plant JPMs ML14350A1582014-12-16016 December 2014 Initial Exam 2014-301 Final Administrative Documents ML14350A1552014-12-16016 December 2014 Initial Exam 2014-301 Draft Administrative JPMs ML14350A1372014-12-16016 December 2014 Initial Exam 2014-301 Draft Simulator In-plant JPMs ML14350A1342014-12-16016 December 2014 Initial Exam 2014-301 Draft Simulator Scenarios ML14350A1312014-12-16016 December 2014 Initial Exam 2014-301 Draft SRO Written Exam ML14350A1252014-12-16016 December 2014 Initial Exam 2014-301 Draft RO Written Exam ML14350A1242014-12-11011 December 2014 Initial Exam 2014-301 Draft Administrative Documents 2023-03-06
[Table view] |
Text
Unit 2 APP A-06 1-7 Page 1 of 2
- LPRM DOWNSCALE AUTO ACTIONS LPRM in inverse video is displayed on the associated APRM aDA header and APRM chassis at P608.
CAUSE
- 1. Anyone of 124 LPRMs indicating less than or equal to 3 on the 0 to 125 scale.
- 2. LPRM detector failure.
- 3. Control rod insertion OBSERVATIONS
- 1. The APRM channel with input from the affected LPRM may indicate slightly lower than other APRM channels.
ACTIONS NOTE: Periodic LPRM downscale or upscale alarms spuriously illuminating and clearing is an indication of neutronic/thermal-hydraulic instability. LPRMs provide input to OPRM channels for detection and suppression of thermal hydraulic instability events. The OPRM System alarms are a quick method for detection of these instability events.
- 1. Check the following annunciators to analyze whether the LPRM DOWNSCALE alarm is the result of a thermal-hydraulic instability event:
OPRM TRIP ENABLED (A-OS 4-8)
OPRM PBA/CDA ALARM (A-OS 5-8)
LPRM UPSCALE (A-06 1-8)
OPRM UPSCALE TRIP (A-OS 6-8)
- 2. Identify the affected LPRMs as follows:
- a. At the APRM NUMAC or aDA, identify the affected APRM by indication of LPRM in inverse video displayed on the header.
- b. Use PPC Displays 863 (864, 865, 866) LPRM BAR CHART-APRM 1(2,3,4) or PPC Display 861, FILTERED LPRM READINGS EDIT to identify LPRMs indicating below the downscale setpoint.
- c. If desired, use APRM ODA/NUMAC LPRM BARGRAPHS display to identify downscale LPRMs .
Unit 2 APP A-06 1-7 Page 2 of 2
NOTE: The core power shape should be symmetrical at each LPRM plane throughout the core.
- 3. Compare downscale LPRM(s) to other LPRMs as follows:
- a. Observe the PPC FILTERED LPRM READINGS EDIT display 861 for symmetry.
- b. Select a control rod adjacent to the affected LPRM string and observe the LPRM BARGRAPH display on RBM ODAs for symmetry.
NOTE: Bypassing an LPRM may cause an APRM, OPRM, or RBM channel Inop due to too few LPRM inputs if other LPRMs are already bypassed.
- 4. If the affected LPRM indication is invalid or erratic, then refer to 20P-09 for bypassing the LPRM.
DEVICE/SET POINTS Any of 124 LPRMs less than or equal to 3 on the 0 to 125 scale
- POSSIBLE PLANT EFFECTS 1.
2.
3.
4.
A bypassed or inoperative LPRM detector may result in a Tech Spec LCO.
APRM channel inoperable.
RBM channel inoperable.
OPRM channel inoperable.
REFERENCES
- 1. LL-09364 - 94
- 2. Technical Specification B3.3.1.1
- 3. NEDO-32465-A Licensing Topical Report; Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applicability, GE Nuclear Energy, August 1996
- 4. 2-FP-05851
- 5. 20P-09, Neutron Monitoring System Operating Procedure
(
(
(
Unit 2 APP A-06 3-7 Page 1 of 2
- APRM TROUBLE AUTO ACTIONS
- 1. Rod Withdrawal Block if alarm initiated by too few LPRM detectors per level or too few LPRM detectors in flux average.
CAUSE
- 1. The quantity of operating LPRM detectors at any given reactor level is less than three.
- 2. The quantity of operating LPRM detectors in the flux average is less than 17.
- 3. Any self-test fault.
OBSERVATIONS
- 1. ROD OUT BLOCK (A-OS 2-2) alarm.
- 2. The Rod Withdrawal Permissive indicating light will be off.
- 3. On APRM BARGRAPH display at P608 and PPC Displays 882-885, LPRMs in average is less than 17, if this condition caused the alarm.
ACTIONS NOTE: If cause of the alarm is due to too few LPRMs in the average or too few LPRMs per axial level, the APRM is inoperable in accordance with Tech Spec Basis 3.3.1.1. However, no trip is automatically sent to the Voters.
- 1. If necessary to determine which APRM initiated the alarm, perform the following at each APRM ODA:
- a. Press ETC soft key to obtain TRIP STATUS soft key.
- b. Press TRIP STATUS soft key.
- c. Observe an asterisk in inverse video in the Trouble Alarm column, indicating this APRM initiated the alarm.
- d. Press INOP STATUS soft key to determine cause of the alarm.
- 2. Refer to Tech Spec Section 3.3.1.1 for required actions.
- 3. If the APRM cannot be returned to operable status, then if possible, place the affected APRM in Bypass.
- 4. When plant conditions allow, return LPRMs to service and remove the affected APRM from Bypass.
- 5. If self-test fault initiated the alarm, then contact I&C .
Unit 2 APP A-06 3-7 Page 2 of 2
- ACTIONS APRM Channels 1 through 4 Less than 17 LPRM detector inputs to flux average Less than 3 LPRM detectors per axial level.
Self-test fault.
POSSIBLE PLANT EFFECTS
- 1. APRM inoperable.
- 2. If an APRM channel is inoperable or bypassed, a Tech Spec LCO or TRM Compensatory Measure may result.
REFERENCES
- 1. LL-09364 - 94
- 2. 2-FP-05851
- 3. Tech Spec 3.3.1.1, B3.3.1.1, TRMS 3.3
- 4. APP A-05 2-2, ROD OUT BLOCK
(
(
(
Unit 2 APP A-05 2-2 Page 1 of 2 ROD OUT BLOCK AUTO ACTIONS
- 1. Rod withdrawal prohibited.
CAUSE
- l. South SDV not drained.
- 2. North SDV not drained.
- 3. SRM downscale and any IRM is below Range 3.
- 4. IRM downscale and affected IRM channel is not on Range 1.
- 5. SRM upscale/inoperative and any IRM channel is below Range 8.
- 6. IRM upscale and the reactor system mode switch is not in the RUN position.
- 7. IRM A upscale/inoperative and the reactor system mode switch is not in the RUN position.
- 8. SRM detector not fully inserted and log count rate is less than or equal to 100 cps (bypassed when all IRM channels are above Range 2 or the reactor system mode switch is in the RUN position) .
- 9. IRM B upscale/inoperative and the reactor system mode switch is not in the RUN position.
- 10. APRM downscale and the reactor system mode switch is in the RUN position.
- 11. APRM UPSCALE alarm.
- 12. APRM UPSCALE TRIP/INOP alarm.
- 13. Less than 17 LPRM inputs to any APRM or less than 3 LPRMs per axial level for any APRM.
- 14. RBM downscale and reactor system mode switch is in the RUN position.
- 15. RBM upscale/inoperative.
- 16. Recirc flow signal to any APRM greater than or equal to 110%.
- 17. Discharge Volume Hi Water Level Trip Bypass switch in Bypass with the Reactor System Mode Switch in Shutdown or Refuel.
- 18. Reactor System Mode Switch in Refuel with a second rod selected and another rod not full in.
NOTE: The Service Platform has been removed. Associated refuel interlocks are non-functional, but available.
- 19. Reactor System Mode Switch in Startup AND the refuel bridge is over the core OR the service platform is loaded.
- 20. Reactor System Mode Switch in Refuel with the service platform loaded.
- 21. Reactor System Mode Switch in Refuel with the refuel bridge over the core AND the grapple loaded OR not full up.
- 22. Reactor System Mode Switch in Refuel with the refuel bridge over the core AND any refuel bridge hoist loaded.
- 23. No power to the refuel bridge.
- 24. Reactor System Mode Switch in Shutdown.
- 25. Any IRM detector not fully inserted and the reactor mode switch is not in RUN.
- 26. Circuit malfunction .
12APP-A-05 Rev. 52 Page 20 of 941
Unit 2 APP A-OS 2-2 Page 2 of 2 OBSERVATIONS
- 1. Selected rod will not withdraw.
- 2. Rod withdraw permissive light is off.
- 3. SOUTH SDV NOT DRND (A-OS 1-1) alarm.
- 4. NORTH SDV NOT DRND (A-OS 2-S) alarm.
S. SRM DOWNSCALE (A-OS 1-3) alarm.
- 6. IRM DOWNSCALE (A-OS 1-4) alarm.
- 7. SRM UPSCALE/INOP (A-OS 2-3) alarm.
- 8. IRM UPSCALE (A-OS 2-4) alarm.
- 9. IRM A UPSCALE/INOP (A-OS 3-4) alarm.
- 10. SRM DET RETRACT NOT PERMITTED (A-OS 4-3) alarm.
- 11. IRM B UPSCALE/INOP (A-OS 4-4) alarm.
- 12. APRM DOWNSCALE (A-06 2-7) alarm.
- 13. APRM UPSCALE (A-06 2-8) alarm.
- 14. APRM TROUBLE (A-06 3-7) alarm.
IS. APRM UPSCALE TRIP/INOP (A-06 3-8) alarm.
- 16. REM DOWNSCALE/TROUBLE (A-06 4-7) alarm.
- 17. RBM UPSC/INOP (A-06 4-8) alarm.
- 18. FLOW REF OFF NORMAL (A-06 S-7) alarm.
ACTIONS
- l. Refer to appropriate Annunciator procedure listed in OBSERVATIONS.
- 2. Verify proper position of the Discharge Volume Hi Water Level Trip Bypass switch, refer to APP A-OS 1-5.
- 3. Verify proper positioning of the refueling equipment and power supplies.
DEVICE/SETPOINTS Rod Out Block Relays CI2A-K1 or CI2A-K2 Deenergized POSSIBLE PLANT EFFECTS
- 1. Control rods may not be withdrawn from the core while the rod block is in effect.
REFERENCES
- 1. LL-9364 - 74
- 2. FP-SOOI2 - 6