1:ýý5 fqg'7C,)
RECURRING TASK WORK ORDER NUMBER
- R2088493 ACT PRIORITY 5
STATUS
- HISTRY 29APR07 NBR OF ACTS:
06 LAST UPDATE: 29APR07.
APPLICANT'S EXHIBIT 56 PRINT DATE 09AUG07 W/O DESC CAMERA INSPECTION OF REACTOR CAVITY DRAIN LINE AR NUMBER APPROVED BY RESP FOREMAN MAINT UNIT FEG M/U COMPONENT ID MAINT UNIT DESCR EQUIP REQD MODES PROCEDURE NUMBER:
COMPONENT UPDATE :
BOM/PART UPDATE MOD NUMBER NEXT DUE DATE TECH SPEC DATE A2145128
- DOLL, RICK RESPONSIBLE ORG AR TYPE/SUBTYPE 0:
R' PAGE: 01 MM3 T
ACT OMM3 MAINTENANCE TEAM 3 MUC C
OC 1
187 000 ATTACHMENTS:
N OC 1
187 F
MISC 187 DRYWELL'AND TORUS (SEE NR01 & TORUS VESSEL)
QA CLASS 5
Y ____
EQ N
N SAFE S/D :
ASME SECTION XI Y
POST MAINT TEST Y
REPEAT/
PEP NBR N
TASK FREQUENCY 0001 17OCT06 UNIT R
ACCOUNTING DATA BUSINESS UNIT 10105 PROJECT:
CUSTOMER:
SUB ACCT:
517010 PRODUCT:
DEPARTMENT:
05322 OPERATING UNIT:
83 DOCKETED USNRC October 1, 2007 (10:45am)
OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF U.S. NUCLEAR REGULATORY COMMISSION In tit Mattnr nf A1,L~t-1 ]*
('A.. LI Dockwt NoW-0219L- *Z. Official Exhibit No.,7 OFFERED
-Appl*
n ensee intervenor N
S ff Other IDENTIFIED on Witness/Panel Action Talen:
MAI~ITT r.REJECTED WITHDRAWN Pqmfot/rClerk
RECURRING TASK WORK ORDER
- U** R2**
NUMBER
- R2088493 ACT
.PRIORITY
- 5 STATUS
- HISTRY 29APR07 NBR OF ACTS: 06 LAST UPDATE: 29APR07 PRINT DATE 09AUG07 WORK ORDER COMPONENTS......
w/O DESC CAMERA INSPECTION OF REACTOR CAVITY DRAIN LINE PAGE:
02 WORK ORDER COMPONENTS=======---------------------------
COMPONENT ID CHEM/RAD MAP OC 1
187 F
MISC 187 DRYWF.T,T.
ND ¶PTORTIq (5SEE NRO1
& TORUIq VE5qSELT)
LOCATION QA CLASS
- MULTI 000 ASME SECTION XI:
Y EQ :
Y
-================--
COMPLETION VERIFICATION--------------=--.
PKG ASSMBLED JCC6
- COLUCCI, JOHN C OTHER-:--
RESP FOREMAN
- COLUCCI, JOHN C REPEAT REQD SSV VERIF N
-. ISI BY:
N COMPLETE DATE: 06NOV06 HISTORY VERIFICATION==-----------------------------
COMPNT UPDATE
- N BLIP NBR BOX: 0000 BILL OF MATLS
- N FILE LOCATION:
REPEAT REQD A/R NBR COMPLETED BY
- COLUCCI, JOHN C COMPLETE DATE:
06NOV06 CLOSED BY
- JOHNSTON, IRENE L HISTORY DATE
- 29APR07 CAUSE CODE
- CA REPAIR CODE
- NF
COMPLETION REMARKS REPEAT MAINT:
N PEP NBR:
AS FOUND CONDITION:
ACT 01 ZERO BLOCKAGE FOUND.
PETE TAMBURRO HAS VIDEO OF BOROSCOPE.
06NOV06 DRRO 06NOV06 06NOV06 ACT 02 ZERO BLOCKAGE FOUND.
PETE TAMBURRO HAS VIDEO OF BOROSCOPE.
06NOV06 DRR0 06NOV06 06NOV06 I
HAVE REVIEWED BOTH VIDEOS AND FOUND NO BLOCKAGE.
PETE TAMBURRO 10APR07 WORK PERFORMED:
ACT 03: ERECTED SCAFFOLD C6-1510 AS DIRECTED.
ELECTRONIC SIGNOFFS 04OCT06 PERFORMED BY A.M.STANFORD FOR G.LANE.
04OCT06 ACT 02: INSPECTIONS PERFORMED IAW WORK STEPS.
RESULTS SAT.
PETE 24OCT06 TAMBURRO HAS VIDEO.
DRRO 24OCT06 ACT 01: INSPECTIONS PERFORMED IAW WORK STEPS.
RESULTS SAT.
PETE 06NOV06 TAMBURRO HAS VIDEO.
DRRO 06NOV06 ACT.04 REMOVED SCAFFOLD C6-1510 AS DIRECTED.
GAL3 17NOV06 23APR07 A05: ACTIVITY HAS BEEN COMPLETED.
SEE AS FOUND SECTION FOR PETE'S 23APR07 COMMENTS.
FGAO 23APR07 A06: NO WORK PERFORMED 25APR07 SUSPECTED CAUSE OF FAILURE:
NO FAILURE THESE TASK 25APR07
RECURRING TASK ACTIVITY W/O NBR A/R NBR
-1 W/O STATUS ACT STATUS TYPE R2088493 01 A2145128 HISTRY 29APR07 HISTRY 29APR07 ACT PAGE:
01
================-=======-==----DESCRIPTION---------------------------
W/O DESCRIPTION
- CAMERA INSPECTION OF REACTOR CAVITY DRAIN LINE ACT DESCRIPTION
- PRE-OUTAGE INSP. OF RX CAVITY DRAIN LINE.
PERFORMING ORG
- OMM3 RECURRING TASK NBR:
PM18703M PRI: 5 COMPONENT ID
- OC 1
187 F
MISC 187 EQUIPMENT LOCATION:
MULTI 000 CLR NUMBER 6501333 QA CLASS:0Q EQ: Y WO RESP ORG
- OMM3 FEG
/
- OC 1
187 000 DATE/SHIFT
- 130CT06 X
FOREMAN
- MAINTENANCE TEAM 3 CHARGING WORK CENTER:
05322 SSV AUTH DATE
- N/A ORG-INSP/HOLD ACT TYPE
- C SUPPORT DATES: N/A N/A PREPARED BY
- DOLL, RICK DATE 09MAY06 HOLDS
- MODE N
PARTS N
CHEM + RAD CLR PLAN SCH SAFETY/PLANT IMPACT CONSIDERATIONS=========----------------
BARRIER PERMIT RQD:
CHEMICAL HAZARD : N CSP REQ
- N FIRE PROTECTION
- N SECURITY
- N FSI REQ
- N HAZARD BARRIER
- N
/
=====================--CHEM AND RAD DATA-SYSTEM BREACH
- Y HWP REQ
- N MULTIPLE WORK LOC HP REQD
- T INSULATION REQUIRED:
N SCAFFOLDING REQD
- Y TECH MAP NBR:
PP TEFCHNTCTAN SUPPORTP RECUITRED SPEC: N HP TECHNICIAN SUPPORT REQUIRED SCHEDULING DATA----------------------
PREMIS ID 1
1P41 187 SCHED ID/WIN
- 1P41 187 START DATE
" 09OCT06 EST DUR (HRS) 1 POST MAINT TEST:
CLEARANCE REQD :_Y DUE DATE 170CT06 TECH SPEC:
NIA DOSE ESTIMATE
- 0016 mR INITIAL REVI EWS=--------. ---------------------------
ASME/ISI REVIEW
- YARNES,R ASME XI R&R:
DATE: 05SEP06 QC PLAN REVIEW
- YARNES,R NOCR DATE: 05SEP06 APPROVED BY
- YARNES,R DATE:
PRINT NAME AND WRITE INITIALS OF ALL PERSONNEL WHO INITIALED THIS ACTIVITY
RECURRING TASK ACTIVITY W/O NBR A/R NBR
'I w/o STATUS ACT STATUS TYPE R2088493 01 A2145128 HISTRY 29APR07
- HISTRY 29APR07
__ACT
- ,.~.*
PAGE:
02 ACTIVITY PROCEDURE LIST HP SPECIAL INSTRUCTIONS
- OC-1-05-00057 MECHANICAL & ELB-'RICAL MAINTENANCE,
& NMD
- KNOWLEDGE OF THE RADIOLOGICAL CONDITIONS IS REQUIRED PRIOR TO ENTERING THE RCA UNLESS ESCORTED BY AN RP TECH.
'PHTQ PlAiD TC~
T~3nm \\7~T.Tfl FflP 14.T.HR~VT4RA IR21 REACTOR BUILDING GENERAL MAINTENANCE
- A DOCUMENTED HRA RP BRIEF IS REQUIRED FOR ALL ENTRIES INTO AREAS POSTED AS "LOCKED HIGH RADIATION AREA",
AND "HIGH RADIATION AREA".
(REF RP-AA-460)
" WORKERS SHALL WEAR DOSIMETRY SO THEIR EXPOSURE CAN BE MONITORED IN ANY RCA.
- AIR SAMPLING PER RP
- OBTAIN CURRENT RADIOLOGICAL' CONDITIONS FROM RP
- SURVEYS REQUIRED FOR OVERHEAD AREAS, SYSTEM BREACH, GRINDING AND DRILLING
- INTERFACE WITH RADPRO ON ALL WORK IN RCA
- DEBRIS HAS BEEN IDENTIFIED AS THE PRIMARY CAUSE OF FUEL FAILURE IN THE NUCLEAR INDUSTRY.EACH PERSON PERFORMING WORK ON A COMPONENT OR SYSTEM IN PLANT HAS THE RESPONSIBILITY TO BE THE PRIMARY BARRIER FOR PREVENTING THE ENTRY OF FOREIGN MATERIAL INTO THE COMPONENT OR SYSTEM.
- OC-1-06-00080 REACTOR BUILDING HIGH RAD AREAS KNOWLEDGE OF THE RADIOLOGICAL CONDITIONS IS REQUIRED PRIOR TO ENTERING THE RCA UNLESS ESCORTED BY AN RP TECH.
- A DOCUMENTED HRA RP BRIEF IS REQUIRED FOR ALL ENTRIES INTO AREAS POSTED AS "LOCKED HIGH RADIATION AREA",
AND "HIGH RADIATION AREA".(REF RP-AA-460)
- RADIOLOGICAL CONDITIONS CAN CHANGE BASED ON REACTOR POWER LEVEL, HYDROGEN INJECTION, RECIRC FLOW, SULFATE LEVEL AND WORK LOCATIONS.
REMOTE MONITORS AND HISTORICAL DATA MAY BE USED.
- REFER TO RWP SUPPORT GUIDELINES FOR ADDITIONAL INFORMATION NOT VALID FOR RWCU AREAS, SDC AREAS, RBEDT ROOM, OR TIP SHIELD AREA.
- DOSE RATE METER REQUIRED TO PULL TRASH/PCS FROM ANY HIGH RAD AREA,-
MATERIALS > 5MR/HR AT 30CM NEED RP COVERAGE PRIOR TO MOVEMENT.
- CONTACT RADENG FOR ANY TASK EXPECTED TO RECEIVE 50 MREM OR GREATER.