MONTHYEARML0705705352007-02-26026 February 2007 Revised Actions for the Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds Project stage: Request ML0708200792007-03-29029 March 2007 Confirmatory Action Letter Project stage: Other ML0721300022007-09-12012 September 2007 Completion of Actions for Confirmatory Action Letter NRR-07-021 Project stage: Other ML0727801402007-10-0404 October 2007 Results of the Completed Alloy 600 Pressurizer Nozzle Alternative Weld Repair CMP-022R1 Project stage: Request ML0731702442007-11-29029 November 2007 Closure of Confirmatory Action Letter NRR-07-021 (TAC Nos. MD4163 and MD4164) Project stage: Other 2007-02-26
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 October 4. 2007 U.S. Nuclear Regulatory Commission Serial No. 07-0656 Attention: Document Control Desk NLOS/ETS One White Flint North Docket No. 50-338 11555 Rockville Pike License No. NPF-4 Rockville, MD 20852-2738 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNIT 1 RESULTS OF THE COMPLETED ALLOY 600 PRESSURIZER NOZZLE ALTERNATIVE WELD REPAIR CMP-022R1 In a letter, dated January 3, 2007 (Serial No. 06-1007), as supplemented on March 13,2007 (Serial No. 06-1007A), June 15, 2007 (Serial No. 07-0421), July 25, 2007 (Serial No. 07-0421 A) and October 1, 2007 (Serial No. 07-0652), Dominion requested approval to use a proposed alternative to apply dissimilar metal weld overlays for repair/replacement activities associated with Alloy 600 materials. That request contained alternative requirements for the North Anna Units 1 and 2 Inservice Inspection (lSI) programs to perform full structural preemptive weld overlays (PWOLs) to mitigate the potential for primary water stress corrosion cracking (PWSCC) susceptibility for those pressurizer nozzles containing Alloy 600.
This letter documents the submittal of the above information and provides the examination results of the mitigated pressurizer nozzles for Unit 1. As stated in our relief request, Dominion committed to provide: (1) the final stress analysis for five of the weld overlays and the preliminary engineering evaluation of insurge/outsurge transients for the surge line prior to entry into Mode 4; (2) the examination results of the weld overlays, a discussion of any repairs to the overlay material and/or base material, and the reason for the repair within 14 days after the completion of the ultrasonic examination of weld overlay installations.
The proprietary version of the stress analysis for the mitigated nozzles and the preliminary engineering evaluation of insurge/outsurge transients were provided directly to Mr. S. P. Lingam of your staff on April 11, 2007 for Units 1 and 2. The non-proprietary version of the stress analysis and the insurge/outsurge evaluation were submitted as docketed correspondence on May 16, 2007 (Serial No. 06-10078). These stress analysis reports were applicable to both Units 1 and 2. Therefore, the stress reports will not be resubmitted at this time.
Six full structural mitigative PWOLs for the pressurizer safety, spray, relief, and surge nozzles were performed during the fall 2007 refueling outages for Unit 1, in accordance with relief request CMP-022R1. The surface and volumetric examinations of the weld
Serial No. 07-0656 Docket No. 50-338 Results of Completed Weld Repair - Request CMP-022R1 Page 2 of 3 and base material were completed with no recordable indications. The acceptance examination of the PWOLs resulted in 100% coverage for all overlay weld volume.
However, due to a previous weld repair during initial fabrication which changed the geometry of the nozzle on the 'A' pressurizer safety valve nozzle to safe end weld, only 99.8% of coverage for the preservice examination of the lSI examination volume was obtained. This coverage is consistent with the revision to CMP-022R1 provided to the NRC on October 1, 2007 (Serial No. 07-0652). The preservice examinations of the lSI examination volume resulted in 100% coverage for the remaining five PWOLs.
Other than the initial fabrication weld repair, no additional repairs were necessary to the weld overlay material or base metal during the installation of the PWOLs.
This letter also satisfies the 60-day notification commitments made in Dominion letter dated February 26,2007 (Serial No. 07-0035B) and the NRC Confirmatory Action Letter dated March 29, 2007 for North Anna Unit 1.
If you have any questions regarding this submittal, please contact Mr. Thomas Shaub at (804) 273-2763.
Very truly yours, fdj1ib-6 Gerald T. Bischof Vice President - Nuclear Engineering Attachments: None Commitments made in this letter: None
Serial No. 07-0656 Docket No. 50-338 Results of Completed Weld Repair - Request CMP-022R1 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. J. E. Reasor, Jr.
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.
Suite 300 Glen Allen, Virginia 23060 Mr. J. T. Reece NRC Senior Resident Inspector North Anna Power Station Mr. R. A. Jervey NRC Project Manager U. S. Nuclear Regulatory Commission One White Fli nt North 11555 Rockville Pike Mai I Stop 0 -8 G9A Rockville, Maryland 20852 Mr. M. M. Grace Authorized Nuclear Insurance Inspector North Anna Power Station