Category:E-Mail
MONTHYEARML24032A2442024-02-0101 February 2024 OEDO-24-00011 - 10 CFR 2.206 Petition Holtec Misuse Decommissioning Fund- Email to Petitioner ML24011A2332024-01-11011 January 2024 Request for Additional Information - License Amendment Request (ML23058A064) (EPID L-2023-LLA-0026 - Three Mile Island, U2: Amendment Historic and Cultural Resources) ML24012A0492024-01-11011 January 2024 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML24005A1262024-01-0505 January 2024 Permanently Defueled Emergency Plan Implementation Notification ML23349A0362023-12-14014 December 2023 NRR E-mail Capture - Draft Request for Additional Information Re Quad Cities Emergency Amendment Related to Unit 1 Diesel Generator Inoperability ML23348A3472023-12-12012 December 2023 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Minnesota Regarding a Prairie Island Nuclear Generating Plant, Units 1 & 2, Amendment ML23335A1152023-12-0101 December 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Request for Additional Information LAR to Revise TS 3.7.8 Required Actions ML23338A1192023-11-21021 November 2023 NRR E-mail Capture - Draft Request for Additional Information Quad Cities Relief Request I5R-26 ML23312A0882023-11-0808 November 2023 Acceptance of Request to Revise Alternatives 1-RR-5-10 and 2-RR-5-10 ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23304A0152023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Calvert Cliffs 1 & 2 - Exemption from Security Rule (L-2023-LLE-0033) ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23262A7432023-09-19019 September 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 Acceptance of Relief Request I5R-26 ML23248A3462023-09-0505 September 2023 NRR E-mail Capture - Request for Additional Information for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant - Decommissioning Funding Status Reports ML23207A1962023-07-26026 July 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Acceptance of Requested Licensing Action Request to Revise Technical Specification 3.7.8 Required Actions ML23186A1412023-07-0505 July 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt TSTF-505 ML23186A1482023-07-0505 July 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt 10 CFR 50.69 ML23181A0732023-06-30030 June 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs TSTF-59A ML23187A0202023-06-29029 June 2023 TMI Unit 2 RAI Related to the Amended Post-Shutdown Decommissioning Activities Report ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23160A0222023-06-0606 June 2023 NRR E-mail Capture - Calvert Cliffs - Long Term Coupon Surveillance Program RAI ML23156A0102023-06-0404 June 2023 NRR E-mail Capture - Calvert Cliffs - RAI License Amendment Request for Emergency Desiel Generator ML23135A3992023-05-12012 May 2023 (External_Sender) Section 106 Consultation - NRC NHPA for Three Mile Island Unit 2 ML23159A1642023-05-11011 May 2023 Email TMI-2 Pol Am. 67 SE Minor Discrepancies ML23118A1652023-04-28028 April 2023 NRR E-mail Capture - Request for Additional Information Quad Cities, Unit 2, Alternative Request I6R-11 ML23107A2232023-04-14014 April 2023 Response Re State Consultation-TMI-2 Solutions - Draft EA Fonsi Criticality Exemption Request ML23094A1482023-03-30030 March 2023 TMI-2 TS 6.0 Draft Wording Agreement ML23090A2142023-03-30030 March 2023 Asnyder, NRC Email from Tdevik, Energysolutions, Three Mile Island, Unit 2 -Response Regarding MC&A TS Change, Modification ML23094A0602023-03-30030 March 2023 TMI-2 Response on Draft TS Wording ML23083B9572023-03-24024 March 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Adopt TSTF-564 ML23080A0672023-03-21021 March 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Unit 1 - LAR to Modify the Long-Term Coupon Surveillance Program ML23080A1002023-03-21021 March 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Repair Replacement of Saltwater System Buried Piping ML23075A2802023-03-16016 March 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Acceptance of Relief Requests 1-RR-5-15 and 2-RR-5-15 to Use Subsequent ASME Code Edition and Addenda ML23068A4682023-03-0909 March 2023 Response Re State Consultation - License Amendment Request TMI-2 Solutions - Update Technical Specifications and Remove Certain License Conditions Applicable to Pdms ML23065A0592023-02-27027 February 2023 NRR E-mail Capture - (External_Sender) Prairie Island Request for Pre-application Meeting for Proposed LAR to Change TS 3.7.8, Condition B Required Actions ML23055A0392023-02-24024 February 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Amendment to Adopt TSTF-416 ML23055A1532023-02-24024 February 2023 Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML23057A0062023-02-24024 February 2023 State Consultation - License Amendment Request TMI-2 Solutions - Update Technical Specifications and Remove Certain License Conditions Applicable to Pdms ML23052A0772023-02-21021 February 2023 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance Timely Renewal Exemption Request ML23051A0412023-02-15015 February 2023 Email from TMI-2 Solutions Regarding Commitment Date, Dated 02/15/2023 ML23026A1332023-01-26026 January 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Deletion of License Condition for Decommissioning Trust LAR ML23018A2952023-01-18018 January 2023 Acceptance of Requested Licensing Action to Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) (EPID L-2022-LLA-0184) (Email) ML22364A1942022-12-30030 December 2022 Email Mitigation for Hydrogen Concerns Commitment, Dated December 30, 2022 ML22357A0392022-12-23023 December 2022 NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of I6R-10 Related to Repair of Penetration N-11B ML22357A0142022-12-22022 December 2022 NRC Request for Additional Information Related to the TMI-2 Pdms Transition License Amendment Request ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML23004A0262022-12-16016 December 2022 NRR E-mail Capture - Draft Request for Additional Information - Quad Cities Alternative RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves (EPD L-2022-LLR-0070) 2024-02-01
[Table view] |
Text
Mark Kigg - Region-1 . and 3 Morning..Cali Plant Status Notes for T .ue .sday, 2/2 .7/07 ___fage 1J From: Mark King NP-'-
To: John Thorp AJgfJ,,
Date: Tue, Feb 27, 2007 10:35 AM
Subject:
Region-1 and 3 Morning Call Plant Status Notes for Tuesday, 2/27/07 Re-gion-1 No ENs to screen, no IFRs, COMMs or followup items recommended.
Beginning of the call (it was hard to hear any details), but apparently a reporter will be discussing with the Region some issues at Three Mile Island related to Security personnel and related overtime issues. I sent an FYI e-mail to David Desaulniers already.
Calvert Cliffs, HQs is getting ready to deny their uprate request using Westinghouse Cross Flow Meter, will also rescind our previous "topical" report approval. Note this affects between 20 and 30 plants (Caldon LEFM devices not affected). A RIS and letter to Westinghouse to be issued soon. This may tie in some with my IFR on the over the core themal limits concerns.
Fitzpatrick, UI increased up to .11 gpm now, in Action Level III for RI followup, licensee procedure doesn't have any further actions till it reaches .25 gpm.
Indian Point-2, gas turbine repair delayed due to clutch parts hold, will complete it next week.
Millstone-3, Setting up for RFO scheduled for an April 7th start, new fuel arriving. Planning a downpower to 97% for feedpump repair.
Nine Mile Point-i, apparently SC has notified them of a type B cask that has 12 hold down bolts, 2 were found loose at inspection at the Barnwell site.
NMP-2, jet pump flow blockage - no change.
Salem-i, talked about a SFP structural integrity item that is being inspected.
Susquehanna-I, B EDG reactive load was noted as off-scale by inspectors, they rescaled and found they were outside the required band of 1500 KVARs, actually was at 2000 KVARs, because of grid changes/
operators not paying attention. RI followup item.
TMI-1, indicators for B low pressure flow OOS, have used 30 of 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> LCO so far.
Vermont Yankee, Protesters were outside the owner controlled area gate (15 - peaceful, cops called to check them out, no issues, no arrests). Also then marched to have a "prayer vigil."
ASLB has ruled that Entergy met it's burden, no need for large transient testing. Apparently VY is being discussed by the state legislature today.
Region-3 One EN (recommend screen out), no IFRs, COMMS or followup items recommended.
EN 43184, Quad Cities 1 & 2, REDUCTION IN EMERGENCY PREPAREDNESS CAPABILITY - UPDATE -
recommend screen out.
"On February 24, 2007, at 1820 hours0.0211 days <br />0.506 hours <br />0.00301 weeks <br />6.9251e-4 months <br />, 13 of 51 alert sirens in the Quad Cities Station Emergency Planning Zone were determined to be inoperable. This is considered a major loss of the Quad Cities offsite notification capability. The alert sirens were disabled due to a loss of power. Power was lost due to a major winter storm in the area. Repairs are in progress at the time of this notification. This report is being made due to the reduction in public notification capabilities in accordance with 10CFR50.72(b)(3)(xiii)."
Notes for Tuesday, 2/27/07 Page 2 Mark King - Region-I and King - Region-1 Morning Call and 33 Morning Plant Status Call Plant Status Notes for Tuesday, 2/27/0 Page 2 1 He licensee notified the NRC Resident Inspector, and will be notifying the State.
- UPDATE AT 2006 ON 02/26/07 FROM JIM STORTZ TO W. GOTT * *
- This is a follow up notification to report that only 4 sirens remain inoperable with no estimated time of repair due to downed poles and high voltage power lines on the ground. This is also to correct the number of alert sirens available in the Quad Cities Station Emergency Planning Zone. There are 52 sirens not 51 reported in the original report. With 48 of the 52 alert sirens operational, the station no longer meets the reporting criteria. Notified R3DO (R. Lanksbury)
Braidwood-2, EHC flow leak isolated, a turbine drive pump put on line, no issues.
Byron-2 is on excess letdown, this means they lost aux spray and should have been in elevated risk level. RI followup item (RI staff not impressive with their followup on this condition).
DC Cook, had an ultra sonic flow device fail, working to install new one, if can't get it done in time may have to reduce power slightly. Voltage regulator on turbine generator found to have cross connected power supplies by mistake, Troubleshooting to see if they can correct on line.
Duane Arnold, 4 of 6 offsite power lines restored. No further details discussed.
Fermi-2, EDG #11 is OOS, LCO runs out on 3/1 at 0030. Checking out the lube oil sump some concerns related to 7 day mission time. RI staff followup item.
Monticello - a danger tag was hung wrong, RI staff followup (didn't get any more details)
Palisades is entering Mode 5 today, found an AFW bypass valve that failed open versus failing closed during testing, RI / regional staff followup item (fairly rare condition to have this occur? any need to do anything, continue to follow is my recommendation). They will be replacing 4 CRDMs, doing an air cooler repair and splicing some heat affected cables (DRS is following up on the last item).
95001 inspection is exiting today, with 2 green findings, this will allow closeout of the 95001 issue (which they did not say what it was - I see no white Pl's or findings on the Palisades website ??).
Prairie Island-2, apparently will be shutting down Unit 2 due to MSIV # 22 chattering, it's a dual check valve arrangement valve, repair / shutdown is planned for 7 days. Item for ET briefer to look for, (but it wasn't clear, they may be waiting till the weekend??? guess we'll see).
Quad cites-2, mentioned a reactor feedpump seal leak.
"Be debe be debe.... That's All Folks" (hey if Carla can talk in Spanish, I can talk in "porky the pig")
Mark CC: Carla Roquecruz; Joseph Giantelli; Laray Benton; Omid Tabatabai; Stephen. Pannier