Correction to Technical Specification Pages Issued with Amendment No. 215 Issued on June 15, 2007
ML072570225
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/19/2007
From: Vaaler M
NRC/NRR/ADRO/DORL/LPLII-2
To: Walt T
Carolina Power & Light Co
Vaaler, Marlayna, NRR/DORL 415-3178
Shared Package
ml072570221 List:
References
TAC MD2682
Download: ML072570225 (3)


Text

September 19, 2007 Mr. Thomas D. Walt, Vice President H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550-0790

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 - CORRECTION TO TECHNICAL SPECIFICATION PAGE ISSUED WITH AMENDMENT NO. 215 ISSUED ON JUNE 15, 2007 (TAC NO. MD2682)

Dear Mr. Walt:

On June 15, 2007, the Nuclear Regulatory Commission issued Amendment No. 215 to Facility Operating License No. DPR-23 for the H.B. Robinson Steam Electric Plant, Unit No. 2, in response to your request dated July 17, 2006.

The amendment revised the technical specifications (TS) to change the containment design pressure in Surveillance Requirement 3.6.8.1 and 3.6.8.5 concerning the Isolation Valve Seal Water System, and TS Section 5.5.16 Containment Leakage Rate Testing Program.

A typographical error was found in one of the camera-ready TS pages issued with the amendment. The error was in the page number for the revised TS Section 5.5.16, which was on page 5.0-22, but was listed on page 5.0-24 in Amendment 215. This error was due to repagination in the section caused by an earlier amendment.

A corrected license amendment page is enclosed. We regret any inconvenience this may have caused. If you have any questions regarding this matter, please call me at (301) 415-3178.

Sincerely,

/RA/

Marlayna Vaaler, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261

Enclosure:

As stated cc: See next page

September 19, 2007 Mr. Thomas D. Walt, Vice President H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550-0790

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 - CORRECTION TO TECHNICAL SPECIFICATION PAGE ISSUED WITH AMENDMENT NO. 215 ISSUED ON JUNE 15, 2007 (TAC NO. MD2682)

Dear Mr. Walt:

On June 15, 2007, the Nuclear Regulatory Commission issued Amendment No. 215 to Facility Operating License No. DPR-23 for the H.B. Robinson Steam Electric Plant, Unit No. 2, in response to your request dated July 17, 2006.

The amendment revised the technical specifications (TS) to change the containment design pressure in Surveillance Requirement 3.6.8.1 and 3.6.8.5 concerning the Isolation Valve Seal Water System, and TS Section 5.5.16 Containment Leakage Rate Testing Program.

A typographical error was found in one of the camera-ready TS pages issued with the amendment. The error was in the page number for the revised TS Section 5.5.16, which was on page 5.0-22, but was listed on page 5.0-24 in Amendment 215. This error was due to repagination in the section caused by an earlier amendment.

A corrected license amendment page is enclosed. We regret any inconvenience this may have caused. If you have any questions regarding this matter, please call me at (301) 415-3178.

Sincerely,

/RA/

Marlayna Vaaler, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261

Enclosure:

As stated cc: See next page DISTRIBUTION:

PUBLIC LPL2-2 R/F RidsNrrPMMVaaler RidsNrrLACSola RidsNrrDorlLpl2-2 RidsOgcRp RidsAcrsAcnwMailCenter RidsRgn2MailCenter (RMusser)

GHill (2)

ADAMS Accession Number: ML072570225 Revised Page: ML072610201 Package: ML072570221 NRR-106 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME MVaaler CSola TBoyce DATE 9/18/07 9/14/07 9/19/07 OFFICIAL RECORD COPY

Mr. T. D. Walt H. B. Robinson Steam Electric Plant, Carolina Power & Light Company Unit No. 2 cc:

David T. Conley Associate General Counsel II - Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 U. S. Nuclear Regulatory Commission Resident Inspectors Office H. B. Robinson Steam Electric Plant 2112 Old Camden Road Hartsville, South Carolina 29550 Mr. Ernest J. Kapopoulos, Jr.

Plant General Manager H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Director of Site Operations H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211 Ms. J. F. Lucas Manager - Support Services - Nuclear H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. C. T. Baucom Supervisor, Licensing/Regulatory Programs H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Ms. Beverly Hall, Section Chief N.C. Department of Environment and Natural Resources Division of Radiation Protection 3825 Barrett Dr.

Raleigh, North Carolina 27609-7721 Mr. Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Mr. Henry H. Porter, Assistant Director South Carolina Department of Health Bureau of Land & Waste Management 2600 Bull Street Columbia, South Carolina 29201 Mr. J. Paul Fulford Manager, Performance Evaluation and Regulatory Affairs PEB 5 Carolina Power & Light Company Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. John H. ONeill, Jr.

Pillsbury Winthrop Shaw Pittman, LLP 2300 N Street NW.

Washington, DC 20037-1128