Category:Letter
MONTHYEARIR 05000369/20240032024-11-0404 November 2024 Integrated Inspection Report 05000369/2024003 and 05000370/2024003 IR 05000413/20240032024-11-0404 November 2024 Integrated Inspection Report 05000413/2024003 and 05000414/2024003 IR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) ML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI ML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24297A6222024-10-11011 October 2024 PCA Letter to NRC Catawba Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure IR 05000369/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000369/2024402 05000370/2024402 IR 05000413/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000413/2024011 and 05000414/2024011 ML24255A8312024-09-23023 September 2024 Project Manager Assignment ML24261B9782024-09-19019 September 2024 Notification of an NRC Fire Protection Team Inspection NRC Inspection Report 05000413-2024010, 05000414-2024010 and Request for Information IR 05000414/20240912024-09-0505 September 2024 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter-NRC Inspection Report 05000414-2024091 IR 05000413/20240052024-08-26026 August 2024 Updated Inspection Plan for Catawba Nuclear Station (Report 05000413/2024005 & 05000414/2024005) IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) ML24235A1542024-08-22022 August 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000413-2024402 and 05000414-2024402) IR 05000413/20240022024-08-0808 August 2024 Integrated Inspection Report 05000413-2024002 and 05000414-2024002 and Apparent Violation 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000413/20244032024-08-0101 August 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000413/2024403; 05000414/2024403 IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20244032024-07-25025 July 2024 – Cyber Security Inspection Report 05000369/2024403 and 05000370/2024403 Rev IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24178A0552024-06-26026 June 2024 Requalification Program Inspection – Catawba Nuclear Station ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) IR 05000414/20240902024-06-24024 June 2024 NRC Inspection Report 05000414/2024090 and Preliminary White Finding and Apparent Violation ML24170A8632024-06-11011 June 2024 Flowserve June 11, 2024, Part 21 Notification - Redacted Version for Publishing IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24144A1162024-05-28028 May 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000413/20240012024-05-10010 May 2024 Integrated Inspection Report 05000413/2024001 and 05000414/2024001 and Apparent Violation IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24100A8742024-04-10010 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403 ML24095A1072024-04-0808 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report (C1R27) ML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B 2024-09-05
[Table view] Category:License-Operator
MONTHYEARML24302A0522024-10-28028 October 2024 301 2B File RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000413/20243012024-03-12012 March 2024 – Notification of Licensed Operator Initial Examination 05000413/2024301 and 05000414/2024301 ML23307A0772023-11-0303 November 2023 301 ADAMS 2B ML23079A0902023-03-20020 March 2023 1B- Post Exam Comments IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 ML23045A1842023-02-14014 February 2023 Post Examination Comment - Revised Simulator JPM B ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station – Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) ML22199A2552022-07-0606 July 2022 Ds Catawba 2022 RQ Inspection Notification Letter ML22089A1642022-03-30030 March 2022 301 ADAMS 2B ML22089A1722022-03-30030 March 2022 301 ADAMS 2A-2 ML22089A1762022-03-30030 March 2022 301 ADAMS 2A-3 ML22070B0512022-03-11011 March 2022 301 Post Exam Comments ML22070A8202022-03-11011 March 2022 301 Exam Report Items - RO as Given Written Exam ML22070A8932022-03-11011 March 2022 301 Exam Report Items - SRO as Given Written Exam IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML22047A1812022-02-0909 February 2022 301 Written Exam Approval Letter ML21321A0882021-11-17017 November 2021 301 File 2B Exam Draft Items ML21320A3282021-11-16016 November 2021 301 File 2A2 Exam Draft Items (1).pdf ML21320A3312021-11-16016 November 2021 301 File 2A3 Exam Draft Items ML21286A5252021-10-13013 October 2021 1A Final SRO Exam, Answer Key, References ML21286A3632021-10-13013 October 2021 1A Final RO Exam, Answer Key, References ML21258A3892021-09-15015 September 2021 Operating Licensing Examination Approval 05000413/2021301 and 05000414/2021301 ML21218A0952021-08-0606 August 2021 301 ADAMS 2B IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 ML21111A3422021-04-16016 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Oconee Nuclear Station ML21062A0762021-03-0303 March 2021 301 Corporate Notification Letter ML21055A6072021-02-23023 February 2021 301 Exam Corporate Notification Letter ML21054A1272021-02-23023 February 2021 302 Exam Final Items 2A-2 (2 Year Delayed Release) ML21054A1342021-02-23023 February 2021 302 Exam Administrative Items 2A-3 (2 Year Delayed Release) ML21054A1872021-02-23023 February 2021 302 (Normal release)2B Exam Administrative Items ML21034A6102021-02-0303 February 2021 302 1A Final RO Written Exam & Key (2-Year Delayed Release) ML21034A6142021-02-0303 February 2021 302 1A Final SRO Written Exam & Key (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20321A1912020-11-12012 November 2020 302 Retake Exam Approval Letter ML20302A4322020-10-28028 October 2020 2A-3 Combined Delayed Release Exam Admin Items.Pdf ML20302A2662020-10-26026 October 2020 File 2A-2 Exam Final Items Delayed Release ML20302A2512020-10-26026 October 2020 File 2A-1 Exam Draft Items Delayed Release ML20233A8152020-08-20020 August 2020 1A (2) Oconee 2020301 as Given SRO Written Exam and Key.Pdf ML20233A8092020-08-20020 August 2020 1A (1) Oconee 2020301 as Given RO Written Exam and Key ML20225A0682020-08-11011 August 2020 301 Exam Corporate Notification Letter ML20140A0652020-05-19019 May 2020 ADAMS 2B ML20140A0822020-05-19019 May 2020 ADAMS 2C ML20084L4312020-03-24024 March 2020 2020 NRC Exam Post Exam Comments RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19308A2502019-11-0404 November 2019 301 ADAMS 2D Page 1 Exam Admin Items Normal Release ML19291G2262019-10-18018 October 2019 Exam Corporate Notification Letter Aka 210-day Letter ML19281E0202019-10-0808 October 2019 301 Post Exam Comments 2024-04-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24302A0522024-10-28028 October 2024 301 2B File RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000413/20243012024-03-12012 March 2024 – Notification of Licensed Operator Initial Examination 05000413/2024301 and 05000414/2024301 ML23307A0772023-11-0303 November 2023 301 ADAMS 2B ML23079A0902023-03-20020 March 2023 1B- Post Exam Comments IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 ML23045A1842023-02-14014 February 2023 Post Examination Comment - Revised Simulator JPM B ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station – Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) ML22089A1642022-03-30030 March 2022 301 ADAMS 2B ML22089A1722022-03-30030 March 2022 301 ADAMS 2A-2 ML22089A1762022-03-30030 March 2022 301 ADAMS 2A-3 ML22070A8202022-03-11011 March 2022 301 Exam Report Items - RO as Given Written Exam ML22070A8932022-03-11011 March 2022 301 Exam Report Items - SRO as Given Written Exam IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML22047A1812022-02-0909 February 2022 301 Written Exam Approval Letter ML21321A0882021-11-17017 November 2021 301 File 2B Exam Draft Items ML21320A3312021-11-16016 November 2021 301 File 2A3 Exam Draft Items ML21320A3282021-11-16016 November 2021 301 File 2A2 Exam Draft Items (1).pdf ML21286A3632021-10-13013 October 2021 1A Final RO Exam, Answer Key, References ML21286A5252021-10-13013 October 2021 1A Final SRO Exam, Answer Key, References ML21258A3892021-09-15015 September 2021 Operating Licensing Examination Approval 05000413/2021301 and 05000414/2021301 ML21218A0952021-08-0606 August 2021 301 ADAMS 2B IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 ML21062A0762021-03-0303 March 2021 301 Corporate Notification Letter ML21055A6072021-02-23023 February 2021 301 Exam Corporate Notification Letter ML21054A1272021-02-23023 February 2021 302 Exam Final Items 2A-2 (2 Year Delayed Release) ML21054A1342021-02-23023 February 2021 302 Exam Administrative Items 2A-3 (2 Year Delayed Release) ML21054A1872021-02-23023 February 2021 302 (Normal release)2B Exam Administrative Items ML21034A6102021-02-0303 February 2021 302 1A Final RO Written Exam & Key (2-Year Delayed Release) ML21034A6142021-02-0303 February 2021 302 1A Final SRO Written Exam & Key (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20321A1912020-11-12012 November 2020 302 Retake Exam Approval Letter ML20302A4322020-10-28028 October 2020 2A-3 Combined Delayed Release Exam Admin Items.Pdf ML20302A2512020-10-26026 October 2020 File 2A-1 Exam Draft Items Delayed Release ML20302A2662020-10-26026 October 2020 File 2A-2 Exam Final Items Delayed Release ML20233A8152020-08-20020 August 2020 1A (2) Oconee 2020301 as Given SRO Written Exam and Key.Pdf ML20233A8092020-08-20020 August 2020 1A (1) Oconee 2020301 as Given RO Written Exam and Key ML20225A0682020-08-11011 August 2020 301 Exam Corporate Notification Letter ML20140A0822020-05-19019 May 2020 ADAMS 2C ML20140A0652020-05-19019 May 2020 ADAMS 2B ML20084L4312020-03-24024 March 2020 2020 NRC Exam Post Exam Comments RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19308A2502019-11-0404 November 2019 301 ADAMS 2D Page 1 Exam Admin Items Normal Release ML19291G2262019-10-18018 October 2019 Exam Corporate Notification Letter Aka 210-day Letter ML19281E0202019-10-0808 October 2019 301 Post Exam Comments ML19281E0172019-10-0808 October 2019 301 Exam Report Items Delayed Release RO as Given IR 05000413/20193012019-09-0303 September 2019 Operator Licensing Written Examination Approval 05000413/2019301 and 05000414/2019301 RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19115A2552019-04-25025 April 2019 301 ADAMS2C Exam Administrative Items 2024-04-02
[Table view] |
Text
THOMAS P. HARRALL, Jr.
Vice President, Plant Support PdkvEnergy Nuclear Generation Duke Energy Corporation 526 South Church Street Charlotte, NC 28202 Mailing Address:
ECO7H / P.O. Box 1006 Charlotte, NC 28201-1006 August 24, 2007 704 382 3989 704 382 6056 fax tpharral@duke-energy.com U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk
Subject:
Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413, 50-414 Response to NRC Regulatory Issue Summary 2007-17 Preparation and Scheduling of Operator Licensing Examinations On July 12, 2007, the NRC issued Regulatory Issue Summary (RIS) 2007-17, "Preparation and Scheduling of Operator Licensing Examinations." The subject RIS requested an update to the NRC on projected site-specific operator licensing examination schedules, as well as the estimated numbers of applicants planning to take operator licensing examinations and the NRC's generic fundamentals examinations (GFEs).
NRC Form 536, "Operator Licensing Examination Data" is attached as requested for Oconee, McGuire, and Catawba Nuclear Stations.
Please direct any questions to L. B. Jones at (704) 382-4753.
Very truly yours, Thomas P. Harrall, Jr.
Attachments tIGD3 www. duke-energy. corn
U. S. Nuclear Regulatory Commission August 24, 2007 Page 2 xc:
W. D. Travers, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303-8931 L. N. Olshan, Senior Project Manager (ONS)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 J. F. Stang, Senior Project Manager (CNS & MNS)
U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 D. W. Rich NRC Senior Resident Inspector Oconee Nuclear Station J. B. Brady NRC Senior Resident Inspector McGuire Nuclear Station A. T. Sabisch NRC Senior Resident Inspector Catawba Nuclear Station
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (1-5 F53), U.S.
Nuclear Regulatory Commission, .Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Oconee Nuclear Station A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2008 CY 2009 CY 2010 CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY2009 CY2010 CY2011 NUMBER OF REACTOR 9 14 12 12 OPERATORS NUMBER OF SENIOR REACTOR 2 2 2 2 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 6 2 4 4 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 12/01/2008 11/30/2009 11/29/2010 11/28/2011 ALTERNATE DATE 01/05/2009 01/04/2010 01/03/2011 01/03/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2008 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 14 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA Eand e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION McGuire Nuclear Station A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2008 CY 2009 CY2010 CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY2009 CY2010 CY2011 NUMBER OF REACTOR 3 9 7 7 OPERATORS NUMBER OF SENIOR REACTOR 5 1 2 3 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 7 5 6 5 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 05/19/2008 05/11/2009 05/17/2010 05/23/2011 ALTERNATE DATE 06/23/2008 06/22/2009 06/28/2010 06/27/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2008 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 9 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: I hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Catawba Nuclear Station A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY2009 CY2010 CY2011 NUMBER OF REACTOR 7 7 8 8 OPERATORS NUMBER OF SENIOR REACTOR 2 2 2 2 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 4 OPERATORS - UPGRADE3344 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 12/01/2008 12/07/2009 12/06/2010 12/05/2012 ALTERNATE DATE 12/08/2008 12/14/2009 12/13/2010 12/12/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2008 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF o8 8 CANDIDATES NR FOR 53 I25 PRNE ON REYCE PAPE NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER