Category:Letter
MONTHYEARIR 05000413/20230042024-02-0202 February 2024 Integrated Inspection Report 05000413-2023004 and 05000414-2023004 ML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) IR 05000369/20234022023-12-14014 December 2023 Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 ML23208A0972023-07-27027 July 2023 Subsequent License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 IR 05000369/20234202023-07-24024 July 2023 Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application ML23144A0192023-05-25025 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 IR 05000413/20230012023-05-0505 May 2023 Integrated Inspection Report 05000413/2023001 and 05000414/2023001 ML23121A0552023-05-0303 May 2023 Acknowledgement of Withdrawal Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 2024-02-02
[Table view] Category:License-Operator
MONTHYEARML23307A0772023-11-0303 November 2023 301 ADAMS 2B ML23079A0902023-03-20020 March 2023 1B- Post Exam Comments IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 ML23045A1842023-02-14014 February 2023 Post Examination Comment - Revised Simulator JPM B ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) ML22199A2552022-07-0606 July 2022 Ds Catawba 2022 RQ Inspection Notification Letter ML22089A1642022-03-30030 March 2022 301 ADAMS 2B ML22070B0512022-03-11011 March 2022 301 Post Exam Comments ML22066B0612022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML22047A1812022-02-0909 February 2022 301 Written Exam Approval Letter ML21321A0882021-11-17017 November 2021 301 File 2B Exam Draft Items ML21320A3282021-11-16016 November 2021 301 File 2A2 Exam Draft Items (1).pdf ML21320A3312021-11-16016 November 2021 301 File 2A3 Exam Draft Items ML21286A5252021-10-13013 October 2021 1A Final SRO Exam, Answer Key, References ML21286A3632021-10-13013 October 2021 1A Final RO Exam, Answer Key, References ML21258A3892021-09-15015 September 2021 Operating Licensing Examination Approval 05000413/2021301 and 05000414/2021301 ML21218A0952021-08-0606 August 2021 301 ADAMS 2B IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 ML21111A3422021-04-16016 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Oconee Nuclear Station ML21062A0762021-03-0303 March 2021 301 Corporate Notification Letter ML21054A1872021-02-23023 February 2021 302 (Normal release)2B Exam Administrative Items ML21055A6072021-02-23023 February 2021 301 Exam Corporate Notification Letter ML21054A1342021-02-23023 February 2021 302 Exam Administrative Items 2A-3 (2 Year Delayed Release) ML21054A1272021-02-23023 February 2021 302 Exam Final Items 2A-2 (2 Year Delayed Release) ML21034A6102021-02-0303 February 2021 302 1A Final RO Written Exam & Key (2-Year Delayed Release) ML21034A6142021-02-0303 February 2021 302 1A Final SRO Written Exam & Key (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20321A1912020-11-12012 November 2020 302 Retake Exam Approval Letter ML20302A4322020-10-28028 October 2020 2A-3 Combined Delayed Release Exam Admin Items.Pdf ML20302A2512020-10-26026 October 2020 File 2A-1 Exam Draft Items Delayed Release ML20302A2662020-10-26026 October 2020 File 2A-2 Exam Final Items Delayed Release ML20233A8092020-08-20020 August 2020 1A (1) Oconee 2020301 as Given RO Written Exam and Key ML20233A8152020-08-20020 August 2020 1A (2) Oconee 2020301 as Given SRO Written Exam and Key.Pdf ML20225A0682020-08-11011 August 2020 301 Exam Corporate Notification Letter ML20140A0652020-05-19019 May 2020 ADAMS 2B ML20140A0822020-05-19019 May 2020 ADAMS 2C ML20084L4312020-03-24024 March 2020 2020 NRC Exam Post Exam Comments RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19308A2502019-11-0404 November 2019 301 ADAMS 2D Page 1 Exam Admin Items Normal Release ML19291G2262019-10-18018 October 2019 Exam Corporate Notification Letter Aka 210-day Letter ML19281E0202019-10-0808 October 2019 301 Post Exam Comments ML19281E0172019-10-0808 October 2019 301 Exam Report Items Delayed Release RO as Given IR 05000413/20193012019-09-0303 September 2019 Operator Licensing Written Examination Approval 05000413/2019301 and 05000414/2019301 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19115A2482019-04-25025 April 2019 301 ADAMS2A Draft Exam Items ML19115A2602019-04-25025 April 2019 301 ADAMS2D Exam Administrative Items 2023-03-20
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23307A0772023-11-0303 November 2023 301 ADAMS 2B ML23079A0902023-03-20020 March 2023 1B- Post Exam Comments IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 ML23045A1842023-02-14014 February 2023 Post Examination Comment - Revised Simulator JPM B ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) ML22089A1642022-03-30030 March 2022 301 ADAMS 2B IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML22066B0612022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML22047A1812022-02-0909 February 2022 301 Written Exam Approval Letter ML21321A0882021-11-17017 November 2021 301 File 2B Exam Draft Items ML21320A3282021-11-16016 November 2021 301 File 2A2 Exam Draft Items (1).pdf ML21320A3312021-11-16016 November 2021 301 File 2A3 Exam Draft Items ML21286A5252021-10-13013 October 2021 1A Final SRO Exam, Answer Key, References ML21286A3632021-10-13013 October 2021 1A Final RO Exam, Answer Key, References ML21258A3892021-09-15015 September 2021 Operating Licensing Examination Approval 05000413/2021301 and 05000414/2021301 ML21218A0952021-08-0606 August 2021 301 ADAMS 2B IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 ML21062A0762021-03-0303 March 2021 301 Corporate Notification Letter ML21055A6072021-02-23023 February 2021 301 Exam Corporate Notification Letter ML21054A1872021-02-23023 February 2021 302 (Normal release)2B Exam Administrative Items ML21054A1342021-02-23023 February 2021 302 Exam Administrative Items 2A-3 (2 Year Delayed Release) ML21054A1272021-02-23023 February 2021 302 Exam Final Items 2A-2 (2 Year Delayed Release) ML21034A6102021-02-0303 February 2021 302 1A Final RO Written Exam & Key (2-Year Delayed Release) ML21034A6142021-02-0303 February 2021 302 1A Final SRO Written Exam & Key (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20321A1912020-11-12012 November 2020 302 Retake Exam Approval Letter ML20302A4322020-10-28028 October 2020 2A-3 Combined Delayed Release Exam Admin Items.Pdf ML20302A2512020-10-26026 October 2020 File 2A-1 Exam Draft Items Delayed Release ML20302A2662020-10-26026 October 2020 File 2A-2 Exam Final Items Delayed Release ML20233A8092020-08-20020 August 2020 1A (1) Oconee 2020301 as Given RO Written Exam and Key ML20233A8152020-08-20020 August 2020 1A (2) Oconee 2020301 as Given SRO Written Exam and Key.Pdf ML20225A0682020-08-11011 August 2020 301 Exam Corporate Notification Letter ML20140A0652020-05-19019 May 2020 ADAMS 2B ML20140A0822020-05-19019 May 2020 ADAMS 2C ML20084L4312020-03-24024 March 2020 2020 NRC Exam Post Exam Comments RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19308A2502019-11-0404 November 2019 301 ADAMS 2D Page 1 Exam Admin Items Normal Release ML19291G2262019-10-18018 October 2019 Exam Corporate Notification Letter Aka 210-day Letter ML19281E0202019-10-0808 October 2019 301 Post Exam Comments ML19281E0172019-10-0808 October 2019 301 Exam Report Items Delayed Release RO as Given IR 05000413/20193012019-09-0303 September 2019 Operator Licensing Written Examination Approval 05000413/2019301 and 05000414/2019301 RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19115A2602019-04-25025 April 2019 301 ADAMS2D Exam Administrative Items ML19115A2552019-04-25025 April 2019 301 ADAMS2C Exam Administrative Items ML19115A2522019-04-25025 April 2019 301 ADAMS2B Final Exam Items ML19115A2482019-04-25025 April 2019 301 ADAMS2A Draft Exam Items IR 05000269/20193012019-02-21021 February 2019 Operator Licensing Retake Written Examination Approval 05000269/2019301, 05000270/2019301, and 05000287/2019301 ML19014A0282019-01-0909 January 2019 Notification of Licensed Operator Retake Initial Examination 05000269/2019301, 05000270/2019301, and 05000287/2019301 ML18242A6932018-08-30030 August 2018 Exam Administrative Items ADAMS-2D 2023-03-20
[Table view] |
Text
THOMAS P. HARRALL, Jr.
Vice President, Plant Support PdkvEnergy Nuclear Generation Duke Energy Corporation 526 South Church Street Charlotte, NC 28202 Mailing Address:
ECO7H / P.O. Box 1006 Charlotte, NC 28201-1006 August 24, 2007 704 382 3989 704 382 6056 fax tpharral@duke-energy.com U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk
Subject:
Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413, 50-414 Response to NRC Regulatory Issue Summary 2007-17 Preparation and Scheduling of Operator Licensing Examinations On July 12, 2007, the NRC issued Regulatory Issue Summary (RIS) 2007-17, "Preparation and Scheduling of Operator Licensing Examinations." The subject RIS requested an update to the NRC on projected site-specific operator licensing examination schedules, as well as the estimated numbers of applicants planning to take operator licensing examinations and the NRC's generic fundamentals examinations (GFEs).
NRC Form 536, "Operator Licensing Examination Data" is attached as requested for Oconee, McGuire, and Catawba Nuclear Stations.
Please direct any questions to L. B. Jones at (704) 382-4753.
Very truly yours, Thomas P. Harrall, Jr.
Attachments tIGD3 www. duke-energy. corn
U. S. Nuclear Regulatory Commission August 24, 2007 Page 2 xc:
W. D. Travers, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303-8931 L. N. Olshan, Senior Project Manager (ONS)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 J. F. Stang, Senior Project Manager (CNS & MNS)
U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 D. W. Rich NRC Senior Resident Inspector Oconee Nuclear Station J. B. Brady NRC Senior Resident Inspector McGuire Nuclear Station A. T. Sabisch NRC Senior Resident Inspector Catawba Nuclear Station
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (1-5 F53), U.S.
Nuclear Regulatory Commission, .Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Oconee Nuclear Station A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2008 CY 2009 CY 2010 CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY2009 CY2010 CY2011 NUMBER OF REACTOR 9 14 12 12 OPERATORS NUMBER OF SENIOR REACTOR 2 2 2 2 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 6 2 4 4 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 12/01/2008 11/30/2009 11/29/2010 11/28/2011 ALTERNATE DATE 01/05/2009 01/04/2010 01/03/2011 01/03/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2008 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 14 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA Eand e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION McGuire Nuclear Station A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2008 CY 2009 CY2010 CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY2009 CY2010 CY2011 NUMBER OF REACTOR 3 9 7 7 OPERATORS NUMBER OF SENIOR REACTOR 5 1 2 3 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 7 5 6 5 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 05/19/2008 05/11/2009 05/17/2010 05/23/2011 ALTERNATE DATE 06/23/2008 06/22/2009 06/28/2010 06/27/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2008 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 9 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: I hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Catawba Nuclear Station A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY2009 CY2010 CY2011 NUMBER OF REACTOR 7 7 8 8 OPERATORS NUMBER OF SENIOR REACTOR 2 2 2 2 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 4 OPERATORS - UPGRADE3344 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 12/01/2008 12/07/2009 12/06/2010 12/05/2012 ALTERNATE DATE 12/08/2008 12/14/2009 12/13/2010 12/12/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2008 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF o8 8 CANDIDATES NR FOR 53 I25 PRNE ON REYCE PAPE NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER