Oconee Inspection / Activity Plan 09/01/2007 - 03/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/31/2007 10:09:42 Report 22 3
OL EXAM
- INITIAL EXAM WEEK 2 Not Applicable 09/10/2007 09/14/2007 1
V23266 OCONEE/AUGUST 2007 EXAM AT POWER FACILITIES 1
EB3-ISI
- UNIT 3 INSERVICE INSPECTION Baseline Inspections 11/05/2007 11/09/2007 3
7111108P IP Inservice Inspection Activities - PWR 1
EB3SGISI
- UNIT 3 STEAM GENERATOR ISI Baseline Inspections 11/12/2007 11/16/2007 3
7111108P IP Inservice Inspection Activities - PWR 10 EB1-CDBI
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 01/07/2008 01/11/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 01/28/2008 02/01/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 02/11/2008 02/15/2008 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 02/25/2008 02/29/2008 1, 2, 3 7111121 IP Component Design Bases Inspection 3
PSB1-EP
- EP EXERCISE Baseline Inspections 03/31/2008 04/04/2008 1, 2, 3 7111401 IP Exercise Evaluation Baseline Inspections 03/31/2008 04/04/2008 1, 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 03/31/2008 04/04/2008 1, 2, 3 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 03/31/2008 04/04/2008 1, 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 03/31/2008 04/04/2008 1, 2, 3 71151-EP03 IP Alert & Notification System 1
EB3-ISI
- U-1 INSERVICE INSPECTION Baseline Inspections 04/21/2008 04/25/2008 1
7111108P IP Inservice Inspection Activities - PWR 1
EB3SGISI
- U1 SG ISI Baseline Inspections 04/28/2008 05/02/2008 1
7111108P IP Inservice Inspection Activities - PWR 1
PSB1-RP
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 06/16/2008 06/18/2008 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas 1
EB3 - MR
- MAINT RULE Baseline Inspections 06/23/2008 06/27/2008 1, 2, 3 7111112B IP Maintenance Effectiveness 5
EB2-TFP
- TRIENNIAL FIRE PROTECTION Baseline Inspections 07/01/2008 07/03/2008 1, 2, 3 7111105T IP Fire Protection [Triennial]
Baseline Inspections 07/21/2008 07/25/2008 1, 2, 3 7111105T IP Fire Protection [Triennial]
Baseline Inspections 08/04/2008 08/08/2008 1, 2, 3 7111105T IP Fire Protection [Triennial]
4 PSB1-RP
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 71151-OR01 IP Occupational Exposure Control Effectiveness This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Oconee Inspection / Activity Plan 09/01/2007 - 03/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/31/2007 10:09:42 Report 22 4
PSB1-RP
- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections 07/14/2008 07/18/2008 1, 2, 3 71151-PR01 IP RETS/ODCM Radiological Effluent 3
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections 08/11/2008 08/15/2008 1, 2, 3 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 08/11/2008 08/15/2008 1, 2, 3 7111117B IP Permanent Plant Modifications 3
OL EXAM
- INITIAL EXAM PREP Not Applicable 08/18/2008 08/22/2008 1
V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 3
OL EXAM
- INITIAL EXAM WEEK 1 Not Applicable 09/08/2008 09/12/2008 1
V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 3
OL EXAM
- INITIAL EXAM WEEK 2 Not Applicable 09/22/2008 09/26/2008 1
V23286 OCONEE/SEPTEMBER 2008 EXAM AT POWER FACILITIES 1
EB3ISI
- U2 ISI Baseline Inspections 10/27/2008 11/03/2008 2
7111108P IP Inservice Inspection Activities - PWR 1
EB3SGISI
- U2 SG ISI Baseline Inspections 11/03/2008 11/07/2008 2
7111108P IP Inservice Inspection Activities - PWR 2
EB3-HS
- HEAT SINK Baseline Inspections 11/17/2008 11/21/2008 1, 2, 3 7111107B IP Heat Sink Performance 2
- REQUAL INSPECTION Baseline Inspections 03/09/2009 03/13/2009 1, 2, 3 7111111B IP Licensed Operator Requalification Program 1
PSB1-RP
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 03/16/2009 03/18/2009 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.