ML072430040

From kanterella
Jump to navigation Jump to search
Mid Cycle Letter Regarding Performance Review and Insp Plan
ML072430040
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 08/31/2007
From: Moorman J
NRC/RGN-II/DRP/RPB1
To: Gordon Peterson
Duke Energy Carolinas, Duke Power Co
Shared Package
ML072430036 List:
References
Download: ML072430040 (4)


Text

August 31, 2007 Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC (Duke)

ATTN: Mr. G. R. Peterson Vice President McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078-8985

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - MCGUIRE NUCLEAR STATION

Dear Mr. Peterson:

On August 14, 2007, the NRC staff completed its performance review of the McGuire Nuclear Station for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and the enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and a resultant inspection plan.

Overall, McGuire Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for McGuire Units 1 and 2 for the most recent quarter was in the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. In addition to the ROP baseline inspections, we plan to conduct non-baseline inspections involving containment sump blockage, operator licensing examinations, and Independent Spent Fuel Storage Installation.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2009. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last twelve months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

DPC 2

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all baseline inspection procedures.

If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change(s) as soon as possible. Please contact me at (404) 562-4647 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

James H. Moorman, III, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-369, 50-370, 72-38 License Nos.: NPF-9, NPF-17

Enclosure:

McGuire Inspection/Activity Plan cc w/encl: (See page 3)

OFFICE RII:DRP SIGNATURE JHM /RA/

NAME JMoorman DATE 08/31/2007 August 31, 2007 August 31, 2007 August 31, 2007 August 31, 2007 August 31, 2007 August 31, 2007 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

DPC 3

cc w/encls:

C. J. Thomas Regulatory Compliance Manager (MNS)

Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC Electronic Mail Distribution R. L. Gill, Jr., Manager Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC 526 S. Church Street Charlotte, NC 28201-0006 Lisa F. Vaughn Associate General Counsel and Managing Attorney Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202 Kathyrn B. Nolan Senior Counsel Duke Energy Corporation 526 South Church Street-EC 07H Charlotte, NC 28202 David A. Repka Winston & Strawn LLP Electronic Mail Distribution Beverly Hall, Chief, Radiation Protection Section N. C. Department of Environmental Health & Natural Resources Electronic Mail Distribution County Manager of Mecklenburg County 720 East Fourth Street Charlotte, NC 28202 Distribution w/encl: (See page 4)

DPC 4

Letter to G. R. Peterson from James H. Moorman, III date August 31, 2007

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - MCGUIRE NUCLEAR STATION Distribution w/encl:

J. Stang, NRR C. Evans, RII EICS L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC