September 20, 2007 Mr. Timothy G. Mitchell Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.
1448 SR 333 Russellville, AR 72802
SUBJECT:
ARKANSAS NUCLEAR ONE, UNIT 1 - CLOSURE OF CONFIRMATORY ACTION LETTER NRR-07-010 (TAC NO. MD4130)
Dear Mr. Mitchell:
On March 29, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070780094) regarding dissimilar metal welds in the pressurizer at Arkansas Nuclear One, Unit 1 (ANO-1). This letter acknowledges receipt of your letters dated May 22, 2007 and June 27, 2007 (ADAMS Accession No. ML072420397 and ML071870335, respectively), informing the NRC of actions taken in response to this CAL.
In your letters, you provided the inspection results of the weld overlays applied to the pressurizer surge nozzle weld, the pressurizer spray nozzle weld and the associated safe-end to pipe weld, and the three safety/relief nozzle welds at ANO-1.
Based on your letters, the NRC has found that all the commitments listed in the CAL and supporting commitment letter (ADAMS Accession No. ML070610349) have been met. No further response is required regarding the CAL. We consider the CAL closed. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. This completes NRC staff action for TAC No. MD4130.
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.
Current NRC regulations and the NRC Enforcement Policy are available at the NRC web site at http://www.nrc.gov/materials/miau/mat-toolkits.html and http://www.nrc.gov/what-wedo/
regulatory/enforcement or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).
T. Mitchell In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-313 cc: See next page
ML072420534 OFFICE DCI/CPNB LPL4/PM LPL4/LA LPL4/BC NAME TLupold AWang JBurkhardt CMH for THiltz DATE 9/13/07 9/11/07 8/31/07 9/20/07 OFFICE DCI/D DRP/D RIV DORL/D NAME MEvans DChamberlain, via e-mail CHaney DATE 9/14/07 9/18/07 9/20/07
February 2007 Arkansas Nuclear One cc:
Executive Vice President
& Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 General Manager Plant Operations Entergy Operations, Inc.
Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802 Director, Nuclear Safety Assurance Entergy Operations, Inc.
Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802 Manager, Licensing Entergy Operations, Inc.
Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802 Director, Nuclear Safety & Licensing Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213-8298 Section Chief, Division of Health Radiation Control Section Arkansas Department of Health and Human Services 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Section Chief, Division of Health Emergency Management Section Arkansas Department of Health and Human Services 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 310 London, AR 72847 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 County Judge of Pope County 100 W. Main Street Russellville, AR 72801 Vice President, Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995