Letter Sequence Request |
|---|
|
|
MONTHYEARML0702401592007-01-22022 January 2007 MRP 2007-003 Attachment 1, Implications of Wolf Creek Pressurizer Butt Weld Indications Relative to Safety Assessment and Inspection Requirements Project stage: Request ML0706001232007-02-22022 February 2007 Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds - Revised Project stage: Request ML0707903362007-03-27027 March 2007 Confirmatory Action Letter Alloy 82/182 Pressurizer Butt Welds Project stage: Other ML0715603982007-04-30030 April 2007 Evaluation of Circumferential Indications in Pressurizer Nozzle Dissimilar Metal Welds at the Wolf Creek Power Plant - Non-Proprietary Report Project stage: Request ML0715603852007-05-0303 May 2007 Technical Note on Critical Flaw Size Evaluation for Circumferential Cracks in Dissimilar Metal Welds Project stage: Request ML0724101982007-08-0606 August 2007 Mitigation of Alloy 600/82/182 Pressurizer Butt Welds in 2008 Project stage: Request ML0724102362007-08-13013 August 2007 Transmittal of EPRI Report, Advanced Fea Evaluation of Growth of Postulated Circumferential PWSCC Flaws in Pressurizer Nozzle Dissimilar Metal Welds (MRP-126, Rev. 1): Evaluations Specific to Nine Subject Plants Project stage: Request ML0724703942007-08-31031 August 2007 Final Report on Implication of Wolf Creek Indications Project stage: Request ML0724800042007-09-0707 September 2007 Evaluation of Finite Element Analysis in Support of Alloy 82/182 Pressurizer Butt Weld Inspections in 2008 as Provided by Confirmatory Letter NRR-07-009 (Tac No. MD4186) Project stage: Other ML0724001992007-09-0707 September 2007 (Enclosure 1) Safety Assessment on the Advanced Finite Element Analysis on Growth of Postulated Primary Water Stress Corrosion Cracking Flaws in Pressurizer Nozzle Dissimilar Metal Butt Welds Project stage: Request ML0807010172008-03-10010 March 2008 EPRI Reports (St. Lucie Pressurizer Nozzle DM Weld Examination Project Internal Office Report) Project stage: Request ML0807403562008-03-14014 March 2008 Evaluation of New Information Related to Alloy 82/182 Pressurizer Butt Weld Inspections Confirmatory Action Letter NRR-07-009 Project stage: Other ML0817602662008-06-18018 June 2008 Withdrawal of Proposed Amendment to Technical Specification 3.8.3.1 Project stage: Request NOC-AE-08002331, Pressurizer Nozzle Safe End Weld Overlays: Completion of Confirmatory Action Letter Commitments2008-07-15015 July 2008 Pressurizer Nozzle Safe End Weld Overlays: Completion of Confirmatory Action Letter Commitments Project stage: Other ML0820406272008-07-15015 July 2008 Pressurizer Nozzle Safe End Weld Overlays: Completion of Confirmatory Action Letter Commitments Project stage: Other ML0824601472008-09-16016 September 2008 Closure of Confirmatory Action Letter NRR - 07-009 Project stage: Other 2007-08-31
[Table View] |
Text
NUCLEAR ENERGY INSTITUTE Alexander Marion EXECUTIVE DIRECTOR NUCLEAR OPERATIONS & ENGINEERING NUCLEAR GENERATION DIVISION August 13, 2007 Mr. James E. Dyer Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-5-E-7 Washington, MD 20555
Subject:
Transmittal of EPRI Report, "Advanced FEA Evaluation of Growth of Postulated Circumferential PWSCC Flaws in Pressurizer Nozzle Dissimilar Metal Welds (MRP-126, Rev. 1):
Evaluations Specific to Nine Subject Plants" Project Number: 689
Dear Mr. Dyer:
Enclosed is the final version of the subject report containing the evaluation of potential generic implications of the pressurizer piping indications that were found at Wolf Creek. The enclosed version contains a few minor editorial/wording changes that were made within the Report Summary (pages v & vi) only. There are no technical changes within the main body of the report from the version I forwarded to you August 1.
If you have any questions on this matter, please contact Jay Thayer at 202.739.8112; jkt~nei.org or me at 202.739.8080; am~nei.org.
Sincerely, Alexander Marion Enclosure C:
Mr. John A. Grobe, Director, Nuclear Security Special Projects, NRC Ms. Michelle Evans, Director, Division of Component Integrity, NRC Mr. William H. Bateman, Deputy Director, Materials and Chemical Engineering Branch, NRC Mr. Ted J. Sullivan, U. S. Nuclear Regulatory Commission 17761 Street, NW I Suite 400 1 Washington, DC 1 20006-3708 1 P: 202.739.8080 1 F: 202.533.0164 1 am@nei.org I www.nei.org
-c,[