ML072300004

From kanterella
Jump to navigation Jump to search
Meeting with Arizona Public Service, Palo Verde, Units 1, 2 and 3 to Discuss Licensee'S Progress on the Site Integrated Improvement Plan and the Status of the NRC 95003 Inspection
ML072300004
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/17/2007
From:
Division of Nuclear Materials Safety IV
To:
References
Download: ML072300004 (4)


Text

August 17, 2007

SUBJECT:

MEETING WITH ARIZONA PUBLIC SERVICE COMPANY FACILITY: Palo Verde Nuclear Generating Station (PVNGS)

DOCKETS: 50-528; 50-529; and 50-530 DATE & TIME: Thursday, September 6, 2007 9 am - 12 pm (CST)

LOCATION: Nuclear Regulatory Commission, Region IV Training Conference Room 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011 PURPOSE: This is a meeting between the NRC and PVNGS to discuss the licensees progress on the site integrated improvement plan and the status of the NRC 95003 inspection.

CATEGORY 1: The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print, language translation), please notify the NRCs meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

A telecommunications bridge will be available for the public. The phone number is (800) 952-9677. The callers should then request to be transferred to extension 472 for the Arizona Public Service Company meeting.

PARTICIPANTS: NRC P. Gwynn, Deputy Regional Administrator, Region IV A. Howell, Director, Division of Reactor Projects (DRP)

A. Vegel, Deputy Director, Division of Reactor Projects (DRP)

T. Pruett, Chief, Project Branch D, DRP G. Werner, Senior Project Engineer, Project Branch D, DRP

Arizona Public Service Company G. Warnick, Senior Resident Inspector, DRP J. Melfi, Resident Inspector, DRP E. Collins, Region IV Administrator Designee D. Chamberlain, Director, Division of Reactor Safety Roy Caniano, Deputy Director, Division of Reactor Safety D. Chamberlain, Director, Division of Reactor Safety M. Markley, Project Manager Tom Hiltz, Plant Licensing Branch Victor Dricks, Public Affairs Officer Bill Maier, Regional State Liaison Officer LICENSEE Randall Edington, Senior Vice President, Nuclear Robert Bement, Vice President, Nuclear Operations Dwight Mims, Vice President, Regulatory Affairs and Improvement Mike Shea, Director, ImPact Scott Bauer, Director Regulatory Affairs John Hesser, Vice President, Engineering Jeanne Copsey, Department Leader Employee Concerns MEETING CONTACT: Troy W. Pruett, NRC, RIV 817 860-8173 twp@nrc.gov cc: Chairman Randall K. Edington Maricopa County Board of Supervisors Senior Vice President, Nuclear 301 W. Jefferson, 10th Floor Mail Station 7602 Phoenix, AZ 85003 Arizona Public Service Company P.O. Box 52034 Aubrey V. Godwin, Director Phoenix, AZ 85072-2034 Arizona Radiation Regulatory Agency 4814 South 40 Street Steve Olea Phoenix, AZ 85040 Arizona Corporation Commission 1200 W. Washington Street Scott Bauer, Acting General Manager Phoenix, AZ 85007 Regulatory Affairs and Performance Improvement Douglas K. Porter, Senior Counsel Palo Verde Nuclear Generating Station Southern California Edison Company Mail Station 7636 Law Department, Generation Resources P.O. Box 52034 P.O. Box 800 Phoenix, AZ 85072-2034 Rosemead, CA 91770

Arizona Public Service Company Jeffrey T. Weikert Chief, Radiological Emergency Assistant General Counsel Preparedness Section El Paso Electric Company National Preparedness Directorate Mail Location 167 Technological Hazards Division 123 W. Mills Department of Homeland Security El Paso, TX 79901 1111 Broadway, Suite 1200 Oakland, CA 94607-4052 John W. Schumann Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 John Taylor Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Hwy, Bldg. N50 San Clemente, CA 92672 Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Karen O'Regan Environmental Program Manager City of Phoenix Office of Environmental Programs 200 West Washington Street Phoenix, AZ 85003 Matthew Benac Assistant Vice President Nuclear & Generation Services El Paso Electric Company 340 East Palm Lane, Suite 310 Phoenix, AZ 85004

Arizona Public Service Company E-Mail To:

( ) NRC Attendees OEWEB S. Bogle PMNS Mtg Announcement Coordinator BAB2 Bruce Boger, ADRO OEMAIL D/OE JET3 J. Thorp DLP1 D. Pelton, RIV OEDO Coordinator AWM M. Markley, Project Manager, NRR GXW2 G. Warnick, Senior Resident Inspector FPB P. Bonnett VLD V. Dricks, PAO WAM W. Maier, RSLO GMV M. Vasquez, ES LAO, JAK RA Secretaries AMT, MJS, SCG1 DRP Secretaries LMB, LAR, TEK DRS Secretaries CMS, BST1 DNMS Secretaries JLP J. Pellet, IRMB LPL P. Longdo, Receptionist AMM A. Mattila, Security Advisor SUNSI Review Completed: _TWP__ ADAMS: / Yes G No Initials: _TWP__

/ Publicly Available G Non-Publicly Available G Sensitive / Non-Sensitive R:\_REACTORS\_PV\2007\PV9-6-07MN-DRP.wpd ML072300004 RIV:PE:DRP/D C:DRP/D PAO RSLO MLChambers TWPruett VLDricks WAMaier

/RA/ /RA/ /RA/ /RA/

8/17/07 8/17/07 8/17/07 8/17/07 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax