ML072250180
| ML072250180 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 08/08/2007 |
| From: | Scherer A Southern California Edison Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RIS-07-017 | |
| Download: ML072250180 (2) | |
Text
ISOUTHERN CALIFORNIA EDISONp An EDISON INTERN.41TIONAI.9 Company A. Edward Scherer Manager of Nuclear Regulatory Affairs August 8, 2007 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Docket Nos. 50-361 and 50-362 Response to Regulatory Issue Summary (RIS) 2007-17 San Onofre Nuclear Generating Station, Units 2 and 3
Reference:
RIS 2007-17, "Preparation and Scheduling of Operator Licensing Examinations,"
dated July 12, 2007 Gentlemen:
This letter provides the Southern California Edison (SCE) response to U. S. Nuclear Regulatory Commission Regulatory Issue Summary 2007-17, "Preparation and Scheduling of Operator Licensing Examinations," dated July 12, 2007.
The schedule shown on NRC Form 536, "Operator Licensing Examination Data," is enclosed and provides SCE's best estimate to meet our operator licensing needs through calendar year 2011.
If you have any questions, please feel free to contact me or Mr. Clay E. Williams at (949) 368-6707.
Sincerely, Enclosure cc: B. S. Mallet, Regional Administrator, NRC Region IV A. T. Gody, Chief, Operations Branch, NRC Region IV C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 and 3 P.O. Box 128 San Clemente, CA 92672 949-368-7501 Fax 949-368-7575 P003
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)
Estimated burden.per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 REGION IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2008 CY 2009 CY 2010 CY 2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
2 1
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY2009 CY2010 CY2011 NUMBER OF REACTOR OPERATORS 12 7
10 8
9 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3
6 3
5 0
NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 3
3 / 3 2
3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
0 0
PROPOSED DATES 5/4/09 /
PRIMARY DATE 9/29/08 11/30/09 9/20/10 7/25/11 5/18/09 /
ALTERNATE DATE 10/13/08 12/7/09 10/11/10 8/8/11 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 08 CY 09 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
10 0
0 0
0 CANDIDATES NRC FORM 536 (8-2005)
PRINTED ON RECYCLED PAPER