Letter Sequence Other |
---|
|
|
MONTHYEARML0722000222007-08-0909 August 2007 Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 (Tac Nos. MD4506 and MD4507) Project stage: Other ML0722005052007-08-0909 August 2007 Revised Pages of Facility Operating Licenses NPF-11 and NPF-18 Project stage: Other ML19365A0152020-01-0909 January 2020 Correction Letter for Conforming License Amendments to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 and the Radiological Protection Mitigation Strategies Required Project stage: Other 2007-08-09
[Table View] |
|
---|
Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23286A2602023-11-0808 November 2023 Issuance of Amendment Nos. 260 and 245 to Renewed Facility Operating Licenses Relocation of Pressure and Temperature Limit Curves to the Pressure Temperature Report ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML22341A2222022-12-28028 December 2022 Issuance of Amendment Nos. 257 and 243 to Renewed Facility Operating Licenses New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies and Changes to Core Operating Limits Report ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML21362A7212022-02-0404 February 2022 Issuance of Amendment Nos. 255 and 241 Revision to Technical Specifications to Incorporate Licensing Topical Report NEDE-33885P-A, Revision 1, GNF CRDA Application Methodology ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21307A3422021-12-0707 December 2021 Issuance of Amendments to Adopt Reactor Pressure Vessel Water Inventory Control Enhancements (EPIDs L-2020-LLA-0253 and L-2020-LLA-0254) ML21162A0692021-09-0707 September 2021 Issuance of Amendment Nos. Xxx and Yyy Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 ML21158A2282021-07-13013 July 2021 Issuance of Amendments to Renewed Facility Operating Licenses a License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink ML21082A4222021-05-27027 May 2021 Issuance of Amendment Nos. 249 and 235 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20034G5462020-03-12012 March 2020 Issuance of Amendments Revising Instrument Testing and Calibration Definitions ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML19266A5272019-10-0808 October 2019 Issuance of Amendments to Eliminate Second Completion Times from Technical Specifications ML19176A0332019-08-28028 August 2019 Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR ML19121A5052019-06-24024 June 2019 Issuance of Amendments to Renewed Facility Operating Licenses Removal of Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator RS-19-017, Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control2019-06-14014 June 2019 Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control ML19025A2882019-02-14014 February 2019 Issuance of Amendments to Renewed Facility Operating Licenses Revision of Technical Specifications to Adopt TSTF-334-A ML18304A3652019-01-16016 January 2019 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements ML18311A2652019-01-0202 January 2019 Issuance of Amendments Nos. 233 and 219 to Renewed Facility Operating Licenses License Amendment Request for Temporary Extensions to Technical Specifications ML18278A0302018-12-19019 December 2018 Issuance of Amendments 232, 218 to Renewed Facility Operating Licenses Request to Revise the Technical Specifications Surveillance Requirement to Revise the Lower Setpoint Tolerance for Safety/Relief Valves ML18254A3672018-10-29029 October 2018 County 1 & 2; and Quad Cities 1 & 2 - Issuance of Amendments 220, 259, 252, 231, 217, 271 and 266 to Revise Technical Specification Requirements for Inoperable Snubbers ML18226A2022018-10-15015 October 2018 Issuance of Amendments to Renewed Facility Operating Licenses Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18113A0452018-05-29029 May 2018 Issuance of Amendments to Revise Technical Specification Requirements for Secondary Containment ML18008A1232018-02-0606 February 2018 Issuance of Amendments to Renewed Facility Operating Licenses Revision to Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits (CAC Nos. MG0211 and MG0212; EPID L-2017-LLA-0279) ML17283A0852017-11-16016 November 2017 Issuance of Amendment Nos. 226 and 212 - Revise Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Leak Rate Test Frequencies (CAC MF8700 and MF8701; L-2016-LLA-0021) ML17257A3042017-10-30030 October 2017 Non-Proprietary - Issuance of Amendments Request to Revise Suppression Pool Swell Design Analysis and the Facility Licensing Basis ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) ML17073A0672017-05-26026 May 2017 Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256) ML17037D2122017-02-16016 February 2017 Issuance of Amendments to Revise Surveillance Requirement for Secondary Containment Access Doors ML16320A1822016-11-18018 November 2016 Issuance of Amendments High Burnup Atrium-10 Partial Length Fuel Rods RS-16-193, License Amendment Request to Revise Suppression Pool Swell Design Analysis2016-10-27027 October 2016 License Amendment Request to Revise Suppression Pool Swell Design Analysis ML16239A1092016-10-19019 October 2016 Renewed FOL Draft 2016-08-24 to Concurrence ML16239A0842016-10-19019 October 2016 Renewed FOL Draft 2016-08-24 to Concurrence ML16155A1102016-08-23023 August 2016 Issuance of Amendments Reduction in the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls ML15324A4392015-12-17017 December 2015 Issuance of Amendments (CAC Nos. MF5471-MF5476) ML15202A5782015-11-19019 November 2015 Issuance of Amendment to Revise the Ultimate Heat Sink Temperature Limits ML15153A2822015-07-30030 July 2015 Issuance of Amendments Revising the Completion Date for Milestone 8 of the Cyber Security Plan (TAC Nos. MF4728, MF4729, MF4730, MF4731, MF4732, MF4733, MF4734, MF4735, MF4736, MF4737, MF4738, MF4739, MF4740 ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) 2023-05-01
[Table view] |
Text
ENCLOSURE 1 FACILITY OPERATING LICENSE NOS. NPF-11 AND NPF-18 DOCKET NOS. 50-373 AND 50-374 LASALLE COUNTY STATION, UNIT NOS. 1 AND 2 Replace the following pages of the Facility Operating Licenses and Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert License NPF-11 License NPF-11 Page 16a1 Page 16a1 Page 16a1a Page 16a1a License NPF-18 License NPF-18
Page 9d
- 16a1 -
(40) The decommissioning trust agreement for LaSalle, Unit 1, at the time the transfer of the unit to Exelon Generation Company, LLC is effected and thereafter, is subject to the following:
(a) The decommissioning trust agreement must be in a form acceptable to the NRC.
(b) With respect to the decommissioning trust fund, investments in the securities or other obligations of Exelon Corporation or affiliates thereof, or their successors or assigns are prohibited. Except for investments tied to market indexes or other non-nuclear sector mutual funds, investments in any entity owning one or more nuclear power plants are prohibited.
(c) The decommissioning trust agreement for LaSalle, Unit 1, must provide that no disbursements or payments from the trust shall be made by the trustee unless the trustee has first given the Director of the Office of Nuclear Reactor Regulation, 30 days prior written notice of payment. The decommissioning trust agreement shall further contain a provision that no disbursements or payments from the trust shall be made if the trustee receives prior written notice of objection from the NRC.
(d) The decommissioning trust agreement must provide that the agreement can not be amended in any material respect without 30 days prior written notification to the Director of the Office of Nuclear Reactor Regulation.
(e) The appropriate section of the decommissioning trust agreement shall state that the trustee, investment advisor, or anyone else directing the investments made in the trust shall adhere to a "prudent investor" standard, as specified in 18 CFR 35.32(a)(3) of the Federal Energy Regulatory Commission's regulations.
(41) Exelon Generation Company, LLC, shall take all necessary steps to ensure that the decommissioning trust is maintained in accordance with the application for approval of the transfer of the LaSalle, Unit 1, license and the requirements of the Order approving the transfer, and consistent with the safety evaluation supporting the Order.
(42) EGC shall relocate certain Technical Specification requirements to EGC-controlled documents upon implementation of Amendment No. 147. The items and appropriate documents are as described in Table LA, "Removal of Details Matrix," and Table R, "Relocated Specifications," that are attached to the NRC's Safety Evaluation enclosed with Amendment No. 147.
Amendment No. 146 Revised by letter dated August 9, 2007 l
- 16a1a -
(43) The schedule for performing Surveillance Requirements (SRs) that are new or revised in Amendment No. 147 shall be as follows:
For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval that begins on the date of implementation of Amendment No. 147.
For SRs that existed prior to this amendment whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of Amendment No. 147.
For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance is due at the end of the first surveillance interval that began on the date the surveillance was last performed prior to the implementation of Amendment No. 147.
For SRs that existed prior to this amendment whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to implementation of Amendment No. 147.
(44) Mitigation Strategy License Condition l l
Develop and maintain strategies for addressing large fires and explosions and l that include the following key areas: l l
(a) Fire fighting response strategy with the following elements: l
- 1. Pre-defined coordination fire response strategy and guidance l
- 2. Assessment of mutual aid fire fighting assets l
- 3. Designated staging areas for equipment and materials l
- 4. Command and control l
- 5. Training of response personnel l l
(b) Operations to mitigate fuel damage considering the following: l
- 1. Protection and use of personnel assets l
- 2. Communications l
- 3. Minimizing fire spread l
- 4. Procedures for implementing integrated fire response strategy l
- 5. Identification of readily-available pre-staged l
- 6. Training or integrated fire response strategy l
- 7. Spent fuel pool mitigation measures l l
(c) Actions to minimize release to include consideration of: l
- 1. Water spray scrubbing l
- 2. Dose to onsite responders l l
Amendment No. 147 Revised by letter dated August 9, 2007 l
- 9d -
(28) Mitigation Strategy License Condition l l
Develop and maintain strategies for addressing large fires and explosions and l that include the following key areas: l l
(a) Fire fighting response strategy with the following elements: l
- 1. Pre-defined coordination fire response strategy and guidance l
- 2. Assessment of mutual aid fire fighting assets l
- 3. Designated staging areas for equipment and materials l
- 4. Command and control l
- 5. Training of response personnel l l
(b) Operations to mitigate fuel damage considering the following: l
- 1. Protection and use of personnel assets l
- 2. Communications l
- 3. Minimizing fire spread l
- 4. Procedures for implementing integrated fire response strategy l
- 5. Identification of readily-available pre-staged l
- 6. Training or integrated fire response strategy l
- 7. Spent fuel pool mitigation measures l l
(c) Actions to minimize release to include consideration of: l
- 1. Water spray scrubbing l
- 2. Dose to onsite responders l l
Revised by letter dated August 9, 2007 l