ML072140852
Jump to navigation
Jump to search
| ML072140852 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 08/02/2007 |
| From: | NRC/NRR/ADRO/DORL/LPLIII-2 |
| To: | |
| Thorpe-Kavanaugh, Meghan, LPL3-1 | |
| Shared Package | |
| ML072140838 | List: |
| References | |
| TAC MD6014, TAC MD6015 | |
| Download: ML072140852 (1) | |
Text
UHS 3.7.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Verify cooling water temperature supplied 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the plant from the CSCS pond is 10 11.25°F.
SR 3.7.3.2 Verify sediment level is
- 1.5 ft in the 24 months intake flume and the CSCS pond.
SR 3.7.3.3 Verify CSCS pond bottom elevation is 24 months 686.5 ft.
LaSalle I and 2 3.7.3-2 Amendment No. 183 / 170