Revised Pages of Facility Operating License NPF-41, NPF-51 and NPF-74
ML072120061
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/02/2007
From:
NRC/NRR/ADRO/DORL/LPLIV
To:
Markley, M T, NRR/DORL/LP4, 301-415-5723
Shared Package
ML072110424 List:
References
EA-02-026, TAC MD4552, TAC MD4553, TAC MD4554
Download: ML072120061 (9)


Text

ENCLOSURE 1 REVISED PAGES OF FACILITY OPERATING LICENSE NOS. NPF-41, NPF-51, AND NPF-74 DOCKET NOS. STN 50-528, STN 50-529, AND STN 50-530 PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 Replace the following pages of Facility Operating License Nos. NPF-41, NPF-51, and NPF-74.

The revised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change.

License NPF-41 REMOVE INSERT Page 6 Page 6 Page 7 Page 7 Page 8 License NPF-51 REMOVE INSERT Page 7 Page 7 Page 8 Page 8 License NPF-74 REMOVE INSERT Page 4 Page 4 Page 5 Page 5 Page 6 (9)

Results of Piping Vibration Test Program (Section 3.9.2, SER)

Deleted (10)

Response to Salem ATWS Event (Section 7.2, SSER 7, and Section 1.11, SSER 8)

Deleted (11)

Supplement No. 1 to NUREG-0737 Requirements Deleted (12)

Radiochemistry Laboratory (Section 7.3.1.5(3), Emergency Plan)

Deleted (13)

RCP Shaft Vibration Monitoring Program (Section 5.4.1, SSER 12)

Deleted (14)

Additional Conditions Deleted (15)

Mitigation Strategy License Condition l

l APS shall develop and maintain strategies for addressing large fires and l

explosions and that include the following key areas:

l l

(a)

Fire fighting response strategy with the following elements:

l l

1.

Pre-defined coordinated fire response strategy and l

guidance.

l 2.

Assessment of mutual aid fire fighting assets.

l 3.

Designated staging areas for equipment and materials.

l 4.

Command and control.

l 5.

Training of response personnel.

l l

(b)

Operations to mitigate fuel damage considering the following:

l l

1.

Protection and use of personnel assets.

l 2.

Communications.

l 3.

Minimizing fire spread.

l 4.

Procedures for implementing integrated fire response l

strategy.

l 5.

Identification of readily-available pre-staged equipment.

l 6.

Training on integrated fire response strategy.

l 7.

Spent fuel pool mitigation measures.

l Amendment No. 128 Revised by letter dated August 2, 2007 (c)

Actions to minimize release to include consideration of:

l l

1.

Water spray scrubbing.

l 2.

Dose to onsite responders.

l D.

The facility requires an exemption from Paragraph III.D.2(b)(ii) of Appendix J to 10 CFR Part 50 (Section 6.2.6, SSER 7). This exemption is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest. This exemption is, therefore, hereby granted pursuant to 10 CFR 50.12. With the granting of this exemption, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E.

The licensees shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Palo Verde Nuclear Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program Revision 3, submitted by letter dated May 16, 2006.

F.

Deleted G.

The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims; and Amendment No. 162 Revised by letter dated August 2, 2007 l

H.

This license is effective as of the date of issuance and shall expire at midnight on June 01, 2025.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By Harold R. Denton, Director Office of Nuclear Reactor Regulation

Enclosures:

1. Attachment 1 - [Requirements for Initial Mode 1 Entry] - Deleted
2. Attachment 2 - [Operating Staff Experience Requirements ] - Deleted
3. Attachment 3 - [Emergency Response Capabilities] - Deleted
4. Appendix A -

Technical Specifications

5. Appendix B -

Environmental Protection Plan

6. Appendix C -

Antitrust Conditions

7. Appendix D - [Additional Conditions] - Deleted Date of Issuance: June 1, 1985 Amendment No. 147 Revised by letter dated August 2, 2007 (9)

Additional Conditions Deleted (10)

Mitigation Strategy License Condition l

l APS shall develop and maintain strategies for addressing large fires and l

explosions and that include the following key areas:

l l

(a)

Fire fighting response strategy with the following elements:

l l

1.

Pre-defined coordinated fire response strategy and l

guidance.

l 2.

Assessment of mutual aid fire fighting assets.

l 3.

Designated staging areas for equipment and materials.

l 4.

Command and control.

l 5.

Training of response personnel.

l l

(b)

Operations to mitigate fuel damage considering the following:

l l

1.

Protection and use of personnel assets.

l 2.

Communications.

l 3.

Minimizing fire spread.

l 4.

Procedures for implementing integrated fire response l

strategy.

l 5.

Identification of readily-available pre-staged equipment.

l 6.

Training on integrated fire response strategy.

l 7.

Spent fuel pool mitigation measures.

l l

(c)

Actions to minimize release to include consideration of:

l l

1.

Water spray scrubbing.

l 2.

Dose to onsite responders.

l D.

(1)

APS has previously been granted an exemption from Paragraph III.D.2(b)(ii) of Appendix J to 10 CFR Part 50. This exemption was previously granted in Facility Operating License NPF-46 pursuant to 10 CFR 50.12.

(2)

Deleted With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

Amendment No. 128 Revised by letter dated August 2, 2007 E.

The licensees shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Palo Verde Nuclear Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program Revision 3," submitted by letter dated May 16, 2006.

F.

Deleted G.

The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims; and H.

This license is effective as of the date of issuance and shall expire at midnight on April 24, 2026.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By Darrell G. Eisenhut, Acting Director Office of Nuclear Reactor Regulation Attachments:

1. [Requirements for Initial Mode 1 Entry] - Deleted
2. [Schedule for NUREG-0737, Sup. 1, Requirement (SPDS)] - Deleted
3. Appendix A -

Technical Specifications

4. Appendix B Environmental Protection Plan
5. Appendix C Antitrust Conditions 6

Appendix D - [Additional Conditions] - Deleted Date of Issuance: April 24, 1986 Amendment No. 162 Revised by letter dated August 2, 2007 (1)

Maximum Power Level Arizona Public Service Company (APS) is authorized to operate the facility at reactor core power levels not in excess of 3876 megawatts thermal (100% power) through operating cycle 13, and 3990 megawatts thermal (100% power) after operating cycle 13, in accordance with the conditions specified herein.

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 168, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where Otherwise stated in specific license conditions.

(3)

Antitrust Conditions This license is subject to the antitrust conditions delineated in Appendix C to this license.

(4)

Initial Test Program (Section 14, SER and SSER 2)

Deleted (5)

Additional Conditions Deleted (6)

Mitigation Strategy License Condition l

l APS shall develop and maintain strategies for addressing large fires and l

explosions and that include the following key areas:

l l

(a)

Fire fighting response strategy with the following elements:

l l

1.

Pre-defined coordinated fire response strategy and l

guidance.

l 2.

Assessment of mutual aid fire fighting assets.

l 3.

Designated staging areas for equipment and materials.

l 4.

Command and control.

l 5.

Training of response personnel.

l Amendment No. 168 Revised by letter dated August 2, 2007 (b)

Operations to mitigate fuel damage considering the following:

l l

1.

Protection and use of personnel assets.

l 2.

Communications.

l 3.

Minimizing fire spread.

l 4.

Procedures for implementing integrated fire response l

strategy.

l 5.

Identification of readily-available pre-staged equipment.

l 6.

Training on integrated fire response strategy.

l 7.

Spent fuel pool mitigation measures.

l l

(c)

Actions to minimize release to include consideration of:

l l

1.

Water spray scrubbing.

l 2.

Dose to onsite responders.

l D.

APS has previously been granted an exemption from Paragraph III.D.2(b)(ii) of Appendix J to 10 CFR Part 50. This exemption was previously granted in Facility Operating License NPF-65 pursuant to 10 CFR 50.12.

With the granting of this exemption, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E.

The licensees shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Palo Verde Nuclear Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program Revision 3," submitted by letter dated May 16, 2006.

F.

APS shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety analysis Report for the facility, as supplemented and amended, and as approved in the SER through Supplement 11, subject to the following provision:

APS may make changes to the approved fire protection program without approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

G.

Deleted Amendment No. 162 Revised by letter dated August 2, 2007 l

H.

The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims; and I.

This license is effective as of the date of issuance and shall expire at midnight on November 25, 2027.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By Thomas E. Murley, Director Office of Nuclear Reactor Regulation Attachments:

1. [Requirements for Initial Mode 1 Entry] - Deleted
2. Appendix A -

Technical Specifications

3. Appendix B Environmental Protection Plan
4. Appendix C Antitrust Conditions
5. Appendix D - [Additional Conditions] - Deleted Date of Issuance: November 25, 1987 Amendment No. 158 Revised by letter dated August 2, 2007