ML072040443

From kanterella
Jump to navigation Jump to search

Revised Pages of Facility Operating License No. NPF-63
ML072040443
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/26/2007
From:
NRC/NRR/ADRO/DORL/LPLII-2
To:
Mel Fields
Shared Package
ML072050060 List:
References
EA-02-026, TAC MD4537
Download: ML072040443 (4)


Text

ENCLOSURE 1 REVISED PAGES OF FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 Replace the following pages of the Facility Operating License. The revised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change.

REMOVE INSERT Page 6 Page 6 Page 7 Page 7


Page 8

(11) Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders D. Exemptions The facility requires an exemption from Appendix E,Section IV.F.1, which requires that a full participation exercise be conducted within one year before the issuance of a license for full power operation. This exemption is authorized by law and will not endanger life or property or the common defense and security, and certain special circumstances are present. This exemption is, therefore, hereby granted pursuant to 10 CFR 50.12 as follows:

Shearon Harris Nuclear Power Plant, Unit 1, is exempt from the requirement of 10 CFR Part 50, Appendix E, Section IV.F.1 for the conduct of an offsite full participation exercise within one year before the issuance of the first operating license for full power and prior to operation above 5 percent of rated power, provided that a full participation exercise is conducted before or during March 1987.

Revised by letter dated July 26, 2007

The facility is granted an exemption from Paragraph III.D.2(b)(ii) of Appendix J to 10 CFR Part 50 (see SER Section 6.2.6). This exemption is authorized by law and will not endanger life or property or the common defense and security, and certain special circumstances are present. In addition, the facility was previously granted an exemption from the criticality alarm requirements of paragraph 70.24 of 10 CFR Part 70 insofar as this section applies to this license. (See License Number SNM-1939 dated October 28, 1985, which granted this exemption).

E. Physical Security (Section 13.6.2.10)

The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: Guard Training and Qualification Plan submitted by letter dated October 19, 2004, Physical Security Plan and Safeguards Contingency Plan submitted by letter dated October 19, 2004 as supplemented by letter dated May 16, 2006.

F. Fire Protection Program (Section 9.5.1)

Carolina Power & Light Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility as amended and as approved in the Safety Evaluation Report (SER) dated November 1983 (and Supplements 1 through 4),

and the Safety Evaluation dated January 12, 1987, subject to the following provision below.

The licensees may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

G. Reporting to the Commission Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, Carolina Power & Light Company shall report any violations of the requirements contained in Section 2.C of this license in the following manner:

initial notification shall be made within twenty-four (24) hours to the NRC Operations Center via the Emergency Notification System with written follow-up within 30 days in accordance with the procedures described in 10 CFR 50.73 (b),

(c) and (e).

Revised by letter dated July 26, 2007

H. The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

I. This license is effective as of the date of issuance and shall expire at midnight on October 24, 2026.

FOR THE NUCLEAR REGULATORY COMMISSION ORIGINAL SIGNED BY HAROLD R. DENTON Harold R. Denton, Director Office of Nuclear Reactor Regulation

Enclosures:

1. Attachment 1 -

TDI Diesel Engine Requirements

2. Appendix A - Technical Specifications
3. Appendix B - Environmental Protection Plan
4. Appendix C - Antitrust Conditions Date of Issuance: January 12, 1987 Revised by letter dated July 26, 2007