|
---|
Category:Letter
MONTHYEARIR 07200015/20244012024-10-30030 October 2024 NRC Independent Spent Fuel Storage Installation Security Inspection Report No. 07200015/2024401 ML24303A2822024-10-29029 October 2024 License Termination Plan Supplemental Submittal for Technical Bases Documents ML24284A1972024-10-10010 October 2024 Cover Letter Oyster Creek, License Termination Plan Acceptance Review ML24269A0462024-10-0404 October 2024 Cover Letter for Oyster Creek Nuclear Generating Station, License Amendment Request, License Termination Plan, Acceptance Review Request for Additional Information ML24274A0822024-09-25025 September 2024 Independent Spent Fuel Storage Installation Security Plan, Training Qualification Plan, Safeguards Contingency Plan, Revisions 1 and 2 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000219/20240022024-09-0505 September 2024 – NRC Inspection Report 05000219/2024002 and 07200015/2024001 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24214A0372024-08-0101 August 2024 License Amendment Request to Revise Renewed Facility Operating License to Add License Condition 2.C.(18) to Include License Termination Plan Requirements ML24179A1842024-07-23023 July 2024 June 20, 2024, Clarification Call on Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000219/20240012024-05-14014 May 2024 Decommissioning Intl, LLC Oyster Creek Nuclear Generating Station - NRC Inspection Report No. 05000219/2024001 ML24120A0412024-04-29029 April 2024 Annual Radioactive Environmental Operating Report for 2023 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24120A0402024-04-29029 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24094A2142024-04-19019 April 2024 Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24089A2492024-03-29029 March 2024 Reply to Notice of Violation EA-2024-024 ML24085A7902024-03-28028 March 2024 – Preapplication Readiness Assessment of the License Termination Plan ML24081A2882024-03-21021 March 2024 Request Preliminary Review and Feedback on Chapter 6 of the Draft License Termination Plan ML24046A1242024-02-29029 February 2024 – NRC Inspection Report 05000219/2023003 ML24033A3272024-02-0202 February 2024 Request Preliminary Review and Feedback on Chapter 5 of the Draft License Termination Plan ML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 – NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report – January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 – NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 – NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 – NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages 2024-09-05
[Table view] Category:License-Operator
MONTHYEARML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17156A5502017-06-0505 June 2017 Requalification Program Inspection - Oyster Creek Nuclear Generating Station RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 RS-16-156, Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations2016-07-18018 July 2016 Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations ML17261B0602016-02-16016 February 2016 Final QA Related Forms (Folder 1) ML16064A1772016-02-10010 February 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17216A1722016-02-10010 February 2016 Draft Operating Exam (Sections a, B and C) (Folder 2) ML17216A1742016-02-10010 February 2016 Draft Written Exam (Folder 2) ML17261B1652016-02-10010 February 2016 Final Outlines (Folder 3) ML17261B1672016-02-10010 February 2016 Draft - Outlines (Folder 2) ML17261B1682016-02-10010 February 2016 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML17261B1692016-02-10010 February 2016 NRC Comments of Draft Licensee-Developed Exam (Operating) (Folder 2) ML16064A1712016-02-10010 February 2016 Final Operating Exam (Sections a, B, and C) (Folder 3) ML16026A5812016-01-26026 January 2016 Initial Operator Licensing Operating Test and Written Examination Approval - Oyster Creek Nuclear Generating Station ML14311A6622014-11-0303 November 2014 September 10, 2014, NRC Generic Fundamentals Examination Results - Oyster Creek Nuclear Generating Station Cover Letter ML15016A1462014-06-0404 June 2014 Miscellaneous Exam Material (Folder 1) ML14163A3872014-05-28028 May 2014 Handouts to Applicants, Summary of References (Folder 3) ML14139A0052014-05-16016 May 2014 Initial Operator Licensing Operating Test and Written Examination Approval-Oyster Creek Nuclear Generating Station ML15016A1522014-05-13013 May 2014 Final Outlines (Folder 3) ML14163A3882014-05-13013 May 2014 Final Operating Exam (Sections a, B, and C) (Folder 3) ML14163A3862014-05-13013 May 2014 Final Written Examination with Answer Key (405-5 Format) (Folder 3) ML14167A3122014-05-0707 May 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14167A3232014-05-0505 May 2014 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML14167A3842014-04-0202 April 2014 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML14167A2982014-04-0202 April 2014 Draft Outlines (Folder 2) ML14167A3682014-04-0202 April 2014 Draft Written Exam (Folder 2) RS-12-114, (EGC) - Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations2012-07-0505 July 2012 (EGC) - Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations IR 05000219/20123012012-06-18018 June 2012 Er 05000219-12-301; 5/14/2012 - 5/24/2012; Oyster Creek Nuclear Generating Station; Initial Operator Licensing Examination Report ML12172A0692012-06-13013 June 2012 Final Qa/Related Forms (Folder 1) ML12165A6092012-06-0606 June 2012 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML12165A6012012-06-0606 June 2012 Final Outlines (Folder 3) ML12159A2442012-06-0101 June 2012 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML12159A3912012-06-0101 June 2012 Draft Written Exam (Folder 2) ML12159A2582012-06-0101 June 2012 Draft - Outlines (Folder 2) ML12159A2522012-06-0101 June 2012 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML12165A6352012-06-0101 June 2012 Handouts to Applicants (Folder 3) ML12128A2242012-05-0707 May 2012 Initial Operator Licensing Operating Test and Written Examination Approval - Oyster Creek Nuclear Generating Station, ML1130000532011-10-27027 October 2011 Announcement of Generic Fundamentals Examination 2012 Administration Dates IR 05000219/20113012011-08-11011 August 2011 Er 05000219-11-301, July 11-20, 2011, Oyster Creek Nuclear Generating Station; Initial Operator Licensing Examination Report ML12017A1642011-07-30030 July 2011 Draft - Outlines (Folder 2) ML1124903532011-07-28028 July 2011 Final Qa/Related Forms (Folder 1) ML1121305252011-07-11011 July 2011 Final Outlines (Folder 3) ML1121305282011-07-0606 July 2011 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML1121305342011-07-0606 July 2011 Summary of Handouts to Applicants (Folder 3) ML1121305412011-07-0606 July 2011 Final Operating Exam (Sections a, B, and C) (Folder 3) ML1118101102011-06-30030 June 2011 Operator Licensing Examination Approval (Oyster Creek) ML1118702612011-06-27027 June 2011 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML1118701862011-06-27027 June 2011 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML1118702782011-05-27027 May 2011 Draft Operating Exam (Sections a, B, and C) (Folder 2) 2018-01-03
[Table view] Category:Other HQ and Regional Correspondence
MONTHYEARML0720001172007-04-0606 April 2007 NRC Letter to Oyster Creek March 7, 2007 Generic Fundamentals Examination Results W/O Enclosures ML0700901742006-12-28028 December 2006 NRC Region 1 Annual GFE Notification Letter to Multiple Addressees Dtd 12/28/06 ML0527900362005-10-0404 October 2005 Letters to Training Managers of the Region I Facilities Participating in the September 7, 2005 Generic Fundamentals Exam 2007-04-06
[Table view] |
Text
April 6, 2007 Mr. Julius Vaccaro Director Training AmerGen Energy Company, LLC Oyster Creek Nuclear Generating Station P.O. Box 388 Forked River, NJ 08731
Dear Mr. Vaccaro:
On March 7, 2007, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of both forms of the examination, including answer keys, the grading results for your facility, and copies of the individual answer sheets for each of your employees and NRC comments. Please forward the results to the individuals along with the copies of their respective answer sheets. A P in RESULTS column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while an F indicates that the individual failed the examination.
If you have any questions concerning the examination, please contact George Usova, NRR GFE coordinator at 301-415-1064.
Sincerely,
/RA/
Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Docket No. 50-219 License No. DPR-16
Enclosures:
- 1. Examination Form A and B with answers
- 2. Examination Results Summary for Oyster Creek
- 3. Individual Answer Sheets cc w/o encl:
T. S. Rausch, Vice President
Mr. Julius Vaccaro Director Training AmerGen Energy Company, LLC Oyster Creek Nuclear Generating Station P.O. Box 388 Forked River, NJ 08731
Dear Mr. Vaccaro:
On March 7, 2007, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of both forms of the examination, including answer keys, the grading results for your facility, and copies of the individual answer sheets for each of your employees and NRC comments. Please forward the results to the individuals along with the copies of their respective answer sheets. A P in RESULTS column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while an F indicates that the individual failed the examination.
If you have any questions concerning the examination, please contact George Usova, NRR GFE coordinator at 301-415-1064.
Sincerely,
/RA/
Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Docket No. 50-219 License No. DPR-16
Enclosures:
- 1. Examination Form A and B with answers
- 2. Examination Results Summary for Oyster Creek
- 3. Individual Answer Sheets cc w/o encl:
T. S. Rausch, Vice President SUNSI Review Complete: cjb1 (Reviewers Initials)
ADAMS No.: ML072000117 ADAMS Pkg. No.: ML072000002 DOCUMENT NAME: C:\FileNet\ML072000117.wpd After declaring this document An Official Agency Record it will without enclosures be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB MDSykes/MDS DATE 03/30/07 04/06/07 OFFICIAL RECORD COPY