June 28, 2007 Southern Nuclear Operating Company, Inc.
Joseph M. Farley Nuclear Plant ATTN:
Mr. J. Randy Johnson Vice President - Farley 7388 North State Highway 95 Columbia, AL 36319
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Johnson:
On the weeks of August 6 and August 20, 2007, the NRC will perform the bienniel baseline Identification and Resolution of Problems Inspection at the Farley Nuclear Plant (NRC Inspection Procedure 71152). Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents should be provided prior to the inspection to ensure that the inspectors are adequately prepared. The inspectors will arrive on site to review the documents and become familiar with the site, personnel, procedures, etc. on July 17, 2007.
It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Doug McKinney of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Robert Carrion at (404) 562-4522 (rpc1@nrc.gov).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Scott M. Shaeffer, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket No. 50-348, 50-364 License No. NPF-2, NPF-8
Enclosure:
Identification And Resolution Of Problems Inspection Document Request cc w/encl: (See page 2)
OFFICE RII:DRP RII:DRS SIGNATURE SMS /RA/
REC /RA/
NAME SShaeffer RCarrion DATE 06/28/2007 06/28/2007 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
SNC 2
cc w/encl:
B. D. McKinney, Licensing Services Manager, B-031 Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution J. R. Johnson Farley Plant Vice President Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution J. T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Moanica Caston Southern Nuclear Operating Company, Inc.
Bin B-022 P. O. Box 1295 Birmingham, AL 35201-1295 State Health Officer Alabama Department of Public Health RSA Tower - Administration 201 Monroe St., Suite 700 P. O. Box 303017 Montgomery, AL 36130-3017 M. Stanford Blanton Balch and Bingham Law Firm P. O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201 William D. Oldfield Quality Assurance Supervisor Southern Nuclear Operating Company Electronic Mail Distribution Distribution w/encl: (See page 3)
SNC 3
Letter to J. Randy Johnson from Scott M. Shaeffer dated June 28, 2007
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION Distribution w/encl:
K. Cotton, NRR C. Evans, RII EICS L. Slack, RII EICS RIDSNRRDIRS OE Mail PUBLIC
Enclosure FARLEY PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION DOCUMENT REQUEST I need copies of the items herein listed to be available for review by inspection team members on July 17, 2007.
Copies of procedures associated with the corrective action process since August 1, 2005. This should include sub-tier or related procedures such as those for trending guidance, root cause evaluations, threshold guidance, prioritization guidance, etc.
A list of all Category 1 and Category 2 corrective action documents initiated since August 1, 2005, including a brief description of the problem and the classification. (Note: This is the starting date for all other lists unless otherwise stated.)
A list of corrective action documents sorted by the following risk-significant systems:
emergency diesel generators, dedicated shutdown diesel generator, component cooling water system, service water system, safety injection system, residual heat removal system, and auxiliary feedwater system. System and Component Health reports for these systems from August 1, 2005.
A list of 50 oldest Condition Reports (CRs) and a list of deleted CRs since August 1, 2005.
A list of root cause evaluations performed since August 1, 2005.
A copy of all corrective action documents associated with NRC findings and LERs.
A list of current temporary mods in place, and a list of cleared temporary mods worked over the past year.
A list of major modifications, and a list of deferred modifications.
A list of industry operating experience documents (i.e., 10 CFR Part 21 reports, Bulletins, Information Notices, vendor information letters affecting the risk-significant systems listed above, and operating experience reports from like plants).
Corrective action program statistics such as the number initiated by department, human performance errors by department, and others as may be available.
Contact for onsite Employee Concerns Program and governing Administrative Procedure.
Need interview with program lead set up for Wednesday or Thursday of first inspection week to discuss identified trends and review case files. A list of corrective action documents that have resulted from the Employee Concerns Program.
Backlog lists of corrective action documents and associated actions, as applicable, such as action item lists.
A list of systems which are classified as a(1) in accordance with the Maintenance Rule; a list of Maintenance Preventable Functional Failures affecting these systems; a list of corrective/
2 Enclosure preventive maintenance activities for the systems/components identified; and a Program Contact.
The four most recent corrective action trend reports to include human performance trends and others, as available.
Copies of all licensee corrective action program self-assessments and audits conducted since August 1, 2005. In addition, a copy of all offsite review committee meeting minutes for the same period.
A list of time-critical operator actions implemented during APs and EPs and a Lead Contact.
Current Operator Work Around list and copy of Operator Work Around Log from August 1, 2005, and a program contact.
Administrative process for reviewing identified component mis-positioning with list of identified items for the past year, and a program contact.
Outstanding main control room deficiencies list.
Backlog/deferred list of periodic tests, preventive maintenance items (PMs), corrective maintenance items (CMs).
Top ten equipment reliability issues on site.
CR word search on missed QC hold inspection.
CR word search on instrument inaccuracies.
Corrective Action Review Board meeting minutes for last six months.
A list of open and closed GL 91-18 operability evaluations since August 1, 2005.
During the first week of the inspection, team would like a discussion on the results of any culture surveys performed since August 1, 2005.
Basic organization charts and main contact list for programs and system engineers.
Schedule of daily meetings and other CAP or related meetings scheduled for the inspection weeks.