ML071760548
| ML071760548 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 06/27/2007 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| Fields, M B, NRR/DLPM/LPD4, 415-3062 | |
| Shared Package | |
| ML071730034 | List: |
| References | |
| EA-02-026, TAC MD4578 | |
| Download: ML071760548 (3) | |
Text
ENCLOSURE 1 REVISED PAGES OF FACILITY OPERATING LICENSE NO. DPR-23 DOCKET NO. 50-261 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 Replace the following pages of the Facility Operating License. The revised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change.
REMOVE INSERT Page 6 Page 6 Page 7 L.
Reactor Vessel Surveillance All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of ASTM E 185-82 to the extent practicable for the configuration of the specimens in the capsule.
Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC.
M.
Mitigation Strategy License Condition The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
(1)
Fire fighting response strategy with the following elements:
- a.
Pre-defined coordinated fire response strategy and guidance
- b.
Assessment of mutual aid fire fighting assets
- c.
Designated staging areas for equipment and materials
- d.
Command and control
- e.
Training of response personnel (2)
Operations to mitigate fuel damage considering the following:
- a.
Protection and use of personnel assets
- b.
Communications
- c.
Minimizing fire spread
- d.
Procedures for implementing integrated fire response strategy
- e.
Identification of readily-available pre-staged equipment
- f.
Training on integrated fire response strategy
- g.
Spent fuel pool mitigation measures (3)
Actions to minimize release to include consideration of:
- a.
Water spray scrubbing
- b.
Dose to onsite responders Renewed Facility Operating License No. DPR-23 Revised by letter dated June 27, 2007 4.
Additional Conditions The Additional Conditions contained in Appendix B, as revised through Amendment No. 200, are hereby incorporated into this license. Carolina Power &
Light Company shall operate the facility in accordance with the additional conditions.
5.
This renewed license is effective as of the date of issuance and shall expire at midnight on July 31, 2030.
FOR THE NUCLEAR REGULATORY COMMISSION ORIGINAL SIGNED BY J. E. DYER J. E. Dyer, Director Office of Nuclear Reactor Regulation Attachments: 1. Appendix A - Technical Specifications
- 2. Appendix B - Additional Conditions Date of Issuance: April 19, 2004 Renewed Facility Operating License No. DPR-23 Revised by letter dated June 27, 2007