July 3, 2007 Mr. Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348

SUBJECT:

THREE MILE ISLAND, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING THE RELOCATION OF REFUEL AND SPENT FUEL POOL AREA RADIATION MONITORS TECHNICAL SPECIFICATION AMENDMENT (TAC NO. MD3783)

Dear Mr. Crane:

By letter dated December 12, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML003540168), and supplemented by letter dated May 31, 2007 (ADAMS Accession Number ML071520229) AmerGen Energy Company, LLC submitted a license amendment request (LAR) regarding the relocation of the reactor building refueling area and spent fuel storage area radiation monitor operability requirements from the Three Mile Island, Unit 1, Technical Specifications to the Updated Final Safety Analysis Report and plant procedures.

The NRC staff has reviewed the information provided in the LAR and has identified the enclosed request for additional information (RAI). This RAI was also emailed to Mr. David Distel of your staff on June 7, 2007. The draft question was sent to ensure that it was understandable, the regulatory basis for the question was clear, and to determine if the information was previously docketed. During a subsequent telephone discussion with Mr. Distel on June 13, 2007, it was agreed that your response would be provided within 30 days of the date of this letter.

Please contact me at 301-415-2833, if you have any questions.

Sincerely,

/ra/

Peter Bamford, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289

Enclosure:

As stated cc w/encl: See next page

July 3, 2007 Mr. Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348

SUBJECT:

THREE MILE ISLAND, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING THE RELOCATION OF REFUEL AND SPENT FUEL POOL AREA RADIATION MONITORS TECHNICAL SPECIFICATION AMENDMENT (TAC NO. MD3783)

Dear Mr. Crane:

By letter dated December 12, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML003540168), and supplemented by letter dated May 31, 2007 (ADAMS Accession Number ML071520229) AmerGen Energy Company, LLC submitted a license amendment request (LAR) regarding the relocation of the reactor building refueling area and spent fuel storage area radiation monitor operability requirements from the Three Mile Island, Unit 1, Technical Specifications to the Updated Final Safety Analysis Report and plant procedures.

The NRC staff has reviewed the information provided in the LAR and has identified the enclosed request for additional information (RAI). This RAI was also emailed to Mr. David Distel of your staff on June 7, 2007. The draft question was sent to ensure that it was understandable, the regulatory basis for the question was clear, and to determine if the information was previously docketed. During a subsequent telephone discussion with Mr. Distel on June 13, 2007, it was agreed that your response would be provided within 30 days of the date of this letter.

Please contact me at 301-415-2833, if you have any questions.

Sincerely,

/ra/

Peter Bamford, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION:

PUBLIC RidsOgcRp LPLI-2 R/F RidsAcrsAcnwMailCenter RidsNrrPMPBamford RidsNrrLACSola RidsRgn1MailCenter RidsNrrDorlDpr RidsNrrDorlLpl1-2 RPedersen ADAMS Accession Number: ML071640433

  • Concurrence via e-mail, no substantive changes OFFICE LPLI-2/PM LPLI-2/PM LPLI-2/LA IPHB/BC LPLI-2/BC NAME PBamford EMiller CSola RPedersen*

HChernoff DATE 06/13/2007 06/19/2007 06/18/2007 06/08/2007 07/03/2007 OFFICIAL RECORD COPY

Three Mile Island Nuclear Station, Unit 1 cc:

Site Vice President - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P. O. Box 480 Middletown, PA 17057 Vice President - Operations, Mid-Atlantic AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Vice President - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Regional Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Chairman Board of County Commissioners of Dauphin County Dauphin County Courthouse Harrisburg, PA 17120 Chairman Board of Supervisors of Londonderry Township R.D. #1, Geyers Church Road Middletown, PA 17057 Senior Resident Inspector (TMI-1)

U.S. Nuclear Regulatory Commission P.O. Box 219 Middletown, PA 17057 Director - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Plant Manager - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P. O. Box 480 Middletown, PA 17057 Regulatory Assurance Manager - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P.O. Box 480 Middletown, PA 17057 Ronald Bellamy, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Michael A. Schoppman Framatome ANP Suite 705 1911 North Ft. Myer Drive Rosslyn, VA 22209 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Eric Epstein TMI Alert 4100 Hillsdale Road Harrisburg, PA 17112 Correspondence Control Desk AmerGen Energy Company, LLC P.O. Box 160 Kennett Square, PA 19348

Three Mile Island Nuclear Station, Unit 1 cc:

Manager Licensing - Three Mile Island Nuclear Station, Unit 1 Exelon Generation Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348 Mr. Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Assistant General Counsel AmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348

Enclosure REQUEST FOR ADDITIONAL INFORMATION RELOCATION OF TECHNICAL SPECIFICATION REQUIREMENTS FOR REFUEL AND SPENT FUEL POOL AREA RADIATION MONITORS TECHNICAL SPECIFICATION AMENDMENT REQUEST TAC NO. MD3783 DOCKET NO. 50-289 By letter dated December 12, 2006 (Agencywide Documents Access and Management System Accession No. ML063540168), AmerGen Energy Company, LLC (the licensee) submitted a license amendment request regarding Three Mile Island, Unit 1 Technical Specifications (TS).

The proposed amendment would relocate the operability requirements for the refueling and spent fuel pool area radiation monitors from the TS to licensee-controlled documents. Based on the review of the information provided by the licensee, the staff has the following additional question.

Describe how the proposed change will continue to meet the monitoring requirements of 10CFR20.1501 (a)(2), "... reasonable under the circumstances to evaluate... the magnitude and extent of radiation levels... and the potential radiological hazards."