Letter Sequence Meeting |
---|
|
|
MONTHYEARML0617201182006-06-27027 June 2006 Propriertary Withholding MRP-139, Electric Power Research Institute Project stage: Other ML0713506512007-05-0808 May 2007 Slides, Category 2 Public Meeting with NEI on the Implications of the Wolf Creek Dissimilar Metal Weld Inspections. Project stage: Request ML0713506462007-05-0808 May 2007 Industry Slides, Advanced Fea Crack Growth Calculations for Evaluation of PWR Pressurizer Nozzle Dissimilar Metal Weld Circumferential PWSCC, from Status Meeting on Implications of Wolf Creek Dissimilar Metal Weld Inspections Project stage: Request ML0713506532007-05-0808 May 2007 Slides, Recommendations for Critical Flaw Size Calculations (in Wolf Creek Advanced Fea Project). Project stage: Request ML0715705202007-06-27027 June 2007 Summary of Meeting with NRC Industry Representatives to Present a Matrix of Potential Modeling Cases for the Phase II Sensitivity, Benchmarking, and Validation Calculations in Their Advanced Finite Element Fracture Mechanics Analyses Project stage: Meeting 2007-05-08
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML23303A2182023-11-0606 November 2023 Summary of October 16, 2023, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation Regarding a License Amendment Request to Adopt TSTF-505 for Wolf Creek Generating Station, Unit 1 ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22011A0862022-01-11011 January 2022 Summary of January 10, 2022, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation Regarding a License Amendment Request to Use Portable Lighting for Wolf Creek Generating Station, Unit 1 ML21333A1312021-12-0707 December 2021 Summary of Meeting with Wolf Creek Nuclear Operating Corporation Diesel Generator Completion Time License Amendment Request for Wolf Creek Generating Station ML21266A0652021-09-23023 September 2021 NEI Presentation - ROP Public Meeting 09232021 (002) ML21200A1102021-07-21021 July 2021 Summary of July 13, 2021, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation Regarding a Temporary Emergency Preparedness Exercise Exemption Request ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21127A1322021-05-11011 May 2021 Summary of April 16, 2021, Conference Call with Representatives of Wolf Creek Generating Station Regarding the Spring 2021 Steam Generator Tube Inspections ML20332A0422020-12-0101 December 2020 Summary of November 19, 2020, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation an Emergency Response Organization Staffing License Amendment Request ML20332A0462020-11-30030 November 2020 Summary of November 18, 2020, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation a Risk-Informed Generic Safety Issue (GSI)-191 License Amendment Request ML20196L6582020-07-14014 July 2020 July 28, 2020 Public Meeting Notice on Spent Fuel Performance Margins Meeting ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML19298B1102019-11-0101 November 2019 Summary of October 17, 2019, Meeting with NEI Regarding Draft Regulatory Guide-1351, Dispositioning of Technical Specifications That Are Insufficient to Ensure Plant Safety ML19143A4182019-05-21021 May 2019 Summary of Public Meeting with Wolf Creek Nuclear Operation Corporation ML19140A4742019-05-20020 May 2019 Closed Meeting with Wolf Creek Nuclear Operating Corporation to Conduct a Mediation Session Regarding Falsification of Documentation Associated with Licensee Maintenance Activities ML18331A3702018-12-0303 December 2018 Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding Use of New Probabilistic Risk Assessment Methods ML18313A2542018-11-16016 November 2018 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation Regarding License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses for Wolf Creek Generating Station ML18208A3322018-07-27027 July 2018 Member Comments on Draft SSHAC Report ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML17276B4892017-10-23023 October 2017 9/25/17 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation Regarding the Proposed LAR for Change in Emergency Plan Staff Augmentation Response Times for Wolf Creek Generating Station (CAC No. MG0174; EPID L-2017-LRM-001 ML17227A0302017-09-0505 September 2017 Summary of Meeting with the Nuclear Energy Institute on NEI 15-03, Revision 1, Licensee Actions to Address Nonconservative Technical Specifications ML16271A4822016-09-27027 September 2016 Summary of Regulatory Conference to Discuss Safety Significance of Wolf Creek Generating Station Emergency Generator Excitation Diode Apparent Violation ML16250A1652016-09-0909 September 2016 8/25/16 Summary of Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Amendment Request to Transition to Westinghouse Analyses Methodologies and Alternate Source Term at Wolf Creek Generating Station ML16243A5132016-09-0101 September 2016 Summary of August 25, 2016, Public Meeting with Wolf Creek Nuclear Operating Corporation and Amerenue Regarding a Proposed Application for a New Technical Specification for the Class 1E Electrical Equipment Air Conditioning System (MF8118 a ML16106A1742016-04-22022 April 2016 Summary of Meeting with Wolf Creek Nuclear Operating Company to Discuss the Generic Safety Issue (GSI)-191 Testing Plan/Fiber Penetration and Head Loss Testing Approach for Wolf Creek Generating Station ML15182A0952015-06-30030 June 2015 Summary of Annual Assessment Meeting with Wolf Creek Nuclear Operating Corporation (WCNOC) Regarding Wolf Creek Generating Station 2014 Performance ML14188C4812014-07-0707 July 2014 Summary of Annual Assessment Meeting with Wolf Creek Generating Station ML14134A1842014-05-14014 May 2014 Summary of Public Meeting to Discuss an Apparent Violation Identified at Wolf Creek Generating Station ML14038A3852014-02-0606 February 2014 1/22/2014 - Summary of Public Meeting to Discuss Corrective Actions Implemented to Address the Chilling Effect Letter ML13221A2152013-08-12012 August 2013 7/30/2013 - Summary of Preapplication Meeting with Wolf Creek Nuclear Operating Company to Discuss Proposed Transition to Westinghouse Methodologies for Core Design and Non-LOCA Safety Analyses at Wolf Creek Generating Station ML13221A2132013-08-12012 August 2013 8/7/2013 - Summary of Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Long-Term Corrective Actions for Water Hammer Events in the Essential Service Water System at Wolf Creek ML13121A4892013-05-0101 May 2013 End of Cycle Meeting Summary 4-18-13 ML13077A0732013-04-0101 April 2013 Summary of 2/28/13 and 3/11/13 Conference Calls with Licensee and Its Contractors Ongoing Steam Generator Tube Inspection Activities During Refueling Outage 19 ML12355A6922012-12-20020 December 2012 Summary of Public Meeting with Wolf Creek Nuclear Operating Corp Re Improved Station Performance ML12276A2652012-11-0101 November 2012 Meeting Summary with Wolf Creek Nuclear Operating Corporation to Discuss Transition from Current to NRC-Approved Westinghouse Methodologies for Performing the Core Design and Non-LOCA Safety Analysis at Wolf Creek ML12191A1742012-07-0909 July 2012 6/25/2012 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation ML12191A1462012-07-0606 July 2012 6/26/2012 - Summary of Public Meeting to Discuss Performance of Wolf Creek Nuclear Operating Corporation ML13246A3802012-05-0808 May 2012 Email from M. King, NRR on Ioeb Clearinghouse Screening Summary for Tuesday, May 8, 2012 ML1207601012012-03-16016 March 2012 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation ML13246A3782012-02-16016 February 2012 Email from M. King, NRR on Ioeb Clearinghouse Screening Summary for Thursday, February 16, 2012 ML13246A3772012-01-31031 January 2012 Email from M. King, NRR on Ioeb Clearinghouse Screening Summary for Tuesday, January 31, 2012 ML13246A3762012-01-23023 January 2012 Email from M. King, NRR on Ioeb Clearinghouse Screening Summary for Monday, January 23, 2012 ML12011A1012012-01-19019 January 2012 Summary of Meeting with NEI and to Address Di&C Issues ML13246A3742012-01-17017 January 2012 Email from M. King, NRR on Ioeb Clearinghouse Screening Summary for Tuesday, January 17, 2012 ML1122000212011-08-31031 August 2011 8/4/2011- Summary of Meeting with the Nuclear Energy Institute and the Technical Specifications Task Force Regarding Gas Accumulation Issues and TSTF-523 ML1110104292011-04-11011 April 2011 Summary of Annual Performance Assessment Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Wolf Creek Generating Station Performance for the NRC Inspection Period Ending December 31, 2010 ML1034402692010-12-22022 December 2010 Summary of Public Meeting with Industry'S New Plant Working Group (Npwg) on Combined License Applications ML1024506282010-09-0202 September 2010 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation ML1013404892010-05-14014 May 2010 Summary of Annual Performance Assessment Meeting with Wolf Creek Nuclear Operating Corporation to Discuss the Wolf Creek Generating Station Performance for the NRC Inspection Period from January 1 Through December 31, 2009 ML0933805662009-12-17017 December 2009 Summary of Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss NRC Requests for Additional Information on Generic Letter 2004-02 Sent 7/31/2009 and 8/27/2009, Respectively 2023-11-06
[Table view] Category:Memoranda
MONTHYEARML23179A2132023-07-0505 July 2023 Approval for Credit for the Wolf Creek Generating Station Operational Safety Review Team to the Baseline Inspection Samples/Hours ML22165A0882022-06-14014 June 2022 Information Request, Security IR 2022403 ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21309A5482021-11-15015 November 2021 NSIR Staff Review of the Wolf Creek Generating Stations Security Plan Training & Qualification Plan & Safeguards Contingency Plan for the Verification of ASM EA 20 091 Incorporation ML21243A4492021-09-0202 September 2021 ISFSI Technical Assistance Request - Review of Physical Security Plan ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML18331A3702018-12-0303 December 2018 Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding Use of New Probabilistic Risk Assessment Methods ML18253A0642018-09-0505 September 2018 EPRI - Transmittal of NEl-03-08 Needed Interim Guidance. for PWR CRDM Thermal Sleeve Wear ML18173A0082018-06-20020 June 2018 Cancelling Numerous Inspection Report Numbers ML17166A1952017-06-14014 June 2017 NRC Fee Exemption Request for NEI White Paper for Use by Design Certification Applicants to Determine the Scope of Tier 1 and Itacc ML17019A2912017-01-19019 January 2017 Notice of Closed Regulatory Conference with Wolf Creek Generating Station ML17019A2932017-01-19019 January 2017 Notice of Closed Regulatory Conference with Wolf Creek Generating Station ML16064A1872016-03-0404 March 2016 Closed Pre-Decisional Enforcement Conference with Wolf Creek Nuclear Operating Corporation ML15251A0092015-09-11011 September 2015 Review of Revision 28 to the Updated Safety Analysis Report ML15015A1712015-01-0808 January 2015 Focused Baseline Inspection at the Wolf Creek Site for a Major Essential Service Water Modification ML14197A3442014-07-25025 July 2014 Review of Revision 27 to the Updated Safety Analysis Report ML14142A4252014-06-11011 June 2014 Feedback Questions on NEI SMR EPZ Methodology White Paper ML14142A4362014-06-11011 June 2014 Questions on White Paper Describing Proposed Methodology and Criteria Regarding Small Modular Reactor Emergency Planning Zone ML13204A2432013-07-24024 July 2013 Notice of Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Long-Term Corrective Actions for Water Hammer Events in the Essential Service Water System at Wolf Creek ML13109A2342013-07-12012 July 2013 Safety Evaluation Regarding Wolf Creek Generating Station - Loss of Offsite Power and Augmented Inspection, Issue for Resolution 2012-004 ML13179A1012013-07-0909 July 2013 7/30/13 Notice of Forthcoming Preapplication Meeting with Wolf Creek Nuclear Operating Company to Discuss Proposed Transition to Westinghouse Methodologies for Core Design and Non-LOCA Safety Analyses at Wolf Creek Generating Station ML13023A0512013-05-0909 May 2013 Transmittal Memo for Final Safety Evaluation for Technical Report NEI 11-04, Quality Assurance Program Description, Revision 0 ML13093A0592013-04-0202 April 2013 Public Meeting with Wolf Creek Nuclear Operating Corporation to Discuss the Performance Assessment Results for Wolf Creek Generating Station for 2012 ML13078A1552013-03-20020 March 2013 License Amendment Request to Change Diesel Generator Surveillance Requirements ML12249A0292012-09-0606 September 2012 9/20/12 Notice of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Transition from Current to NRC-Approved Westinghouse Methodologies for Performing the Core Design and Non-LOCA Safety Wolf Creek Station ML1222602142012-08-16016 August 2012 Iolb Evaluation of Ifr 2012-04 Relating to Wolf Creek Loss of Offsite Power and Notification of Unusual Event ML12011A1012012-01-19019 January 2012 Summary of Meeting with NEI and to Address Di&C Issues ML1122000212011-08-31031 August 2011 8/4/2011- Summary of Meeting with the Nuclear Energy Institute and the Technical Specifications Task Force Regarding Gas Accumulation Issues and TSTF-523 ML1101106702011-02-0707 February 2011 Fire Protection Safety Evaluation Input for Wolf Creek Generating Station Regarding License Amendment Request for Deviation from the Fire Protection Program Requirements ML1034402692010-12-22022 December 2010 Summary of Public Meeting with Industry'S New Plant Working Group (Npwg) on Combined License Applications ML1006010322010-03-0101 March 2010 Cy 2009 Baseline Inspection Completion ML0929300152009-10-20020 October 2009 Revised Notice of Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss NRC Requests for Additional Information on Generic Letter 2004-02 ML0928003162009-10-16016 October 2009 Notice of Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss NRC Requests for Additional Information on Generic Letter 2004-02 Sent 7/31/0209 and 8/27/2009, Respectively ML0925404602009-09-10010 September 2009 Summary of Phone Call with Industry to Issues Related to Eccentricity of the Steam Generator Tube-to-Tubesheet Joints in the Finite Element Model Used for the Technical Basis of the Permanent Alternate Repair Criteria License Amendment Requ ML0920306202009-07-31031 July 2009 Notice of Forthcoming Conference Call with Union Electric Company and Wolf Creek Nuclear Operating Company Re Draft Requests for Additional Information on Generic Letter 2004-02 for Callaway Plant and Wolf Creek Creek Generating Station ML0917002962009-07-30030 July 2009 Issuance of Amendment 183, Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, to Extend the Surveillance Frequency on ESFAS Slave Relays from 92 Days to 18 Months ML0835705252008-12-24024 December 2008 Meeting Notice, Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Pre-Application of Post-fire Safe Shutdown Issues at Wolf Creek ML0829405182008-11-10010 November 2008 Renewal of Full-Power Operating License for the Wolf Creek Generating Station, Unit 1 ML0813006882008-05-0909 May 2008 03/05/2008 Meeting Minutes of Subcommittee on Plant License Renewal Regarding Wolf Creek Generating Station ML0812001002008-04-29029 April 2008 End of Cycle Meeting with Wolf Creek Nuclear Operation Corporation IR 05000482/20080072008-04-24024 April 2008 IR 05000482-08-007, on 01/15/2008 - 03/13/2008, Wolf Creek Generating Station, NRC Special Inspection ML0810805452008-04-18018 April 2008 05/01/2008-Notice of Forthcoming Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Safety Evaluation Report Open Items Related to Metal Fatigue Analyses for License Renewal ML0807904692008-04-10010 April 2008 Summary of Teleconference with Wolf Creek Nuclear Operating Corporation, Ameren Union Electric Company for Callaway Plant, and Performance Contracting, Inc. Containment Sump Head Loss Testing ML0802500852008-03-26026 March 2008 Summary of Second Conference Call Held on January 16, 2008, with PWR Licensees on New Temporary License Amendment Needed for Steam Generator Tube Inspections in Spring 2008 Refueling Outages ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0807404192008-03-14014 March 2008 Assessment of Inspections of Dissimilar Metal Butt Welds in a Retired Pressurizer ML0807304562008-03-13013 March 2008 Cy 2007 Baseline Inspection Completion ML0804503232008-03-0303 March 2008 Summary of Third Conference Call Held with Pressurized-Water Reactor Licensees on Status of NRC Review of License Amendment Requests for Steam Generator Tube Inspections ML0807300242008-02-22022 February 2008 Status Report and Proposed Agenda for the ACRS Subcommittee on March 5, 2008 Related to the License Renewal Application of Wolf Creek Generating Stations Unit 1 2023-07-05
[Table view] |
Text
June 27, 2007 MEMORANDUM TO: Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM: Tanya M. Mensah, Senior Project Manager /RA/
Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF THE MAY 8, 2007, CATEGORY 2 PUBLIC MEETING RE: IMPLICATIONS OF WOLF CREEK DISSIMILAR METAL WELD INSPECTIONS (TAC NO. MD0694)
On May 8, 2007, a Category 2 public meeting was held between the U. S. Nuclear Regulatory Commission (NRC) staff and industry representatives at the Bethesda North Marriot Hotel and Conference Center in North Bethesda, MD. A list of attendees is enclosed. The purpose of this meeting was for the industry representatives to present a matrix of potential modeling cases for the Phase II sensitivity, benchmarking, and validation calculations in their Advanced Finite Element Fracture Mechanics Analyses.
The May 8, 2007, meeting was one of a series of public meetings related to the Wolf Creek pressurizer nozzle weld flaws found in October 2006. Other public meetings to discuss this topic were held on November 16, 2006 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML063320131), November 30, 2006 (ADAMS Accession No. ML063560371), December 20, 2006 (ADAMS Accession No. ML070330381),
March 7, 2007 (ADAMS Accession No. ML070740752), and May 1, 2007 (ADAMS Accession No. ML071360367).
The NRC staff opened the meeting by providing a status of the analysis program and an outline of the presentations to follow. The NRC staff made a presentation that provided the results of efforts to date to benchmark and verify the industrys analysis software. The NRC staff analyses provide reasonably similar results to the industrys analyses. The NRC staff also discussed plans for further software benchmarking and verification efforts. A more detailed summary of the NRC staffs presentation is provided in its presentation slides (ADAMS Accession Nos. ML071350651 and ML071350648).
The industry representatives made a presentation discussing proposed resolution of issues raised in the letter from NRC to NEI dated April 4, 2007 (ADAMS Accession No. ML070940186), on analysis methods. This discussion was concluded with agreements to review additional material and continue discussions at a future meeting. Industry
representatives also presented material on weld residual stress validation efforts, a concept for the analysis matrix and sensitivity cases, and leak rate calculations. At the conclusion of the meeting, participants discussed plans for future meetings. The industry representatives presentations are provided in its presentation slides (ADAMS Accession Nos. ML071350646 and ML071350653).
Members of the public were in attendance. No public meeting feedback forms were received.
Project Nos. 669 and 689
Enclosure:
List of Attendees cc w/encl: See next page
ML071350646 and ML071350653).
Members of the public were in attendance. No public meeting feedback forms were received.
Project Nos. 669 and 689
Enclosure:
List of Attendees cc w/encl: See next page DISTRIBUTION:
PUBLIC RidsNrrAdro PSPB Reading File RidsNrrDpr RidsNrrDprPspb RidsNrrPMTMensah RidsNrrLADBaxley RidsOpaMail MMurphy RidsNrrDciCpnb ESullivan MYoder TLupold MGutierrez KGruss ACsontos CSheng CTucci RHardies RidsOgcMailCenter SMalik RidsNrrDci RidsAcrsAcnwMailCenter ADAMS Package Accession No. ML071580239 Meeting Notice Accession No. ML071060285 Meeting Handout Accession Nos. ML071350651, ML071350648, ML071350646, ML071350653 Meeting Summary Accession No. ML071570520 NRC-001 OFFICE PSPB/PM PSPB/LA DCI DCI/BC PSPB/BC NAME TMensah DBaxley TSullivan JTsao for MHoncharik TChan for SRosenberg DATE 6/11/07 6/8/07 6/26 /07 6/26 /07 6/ 27 /07 List of Attendees for May 8, 2007 Name Organization Ted Anderson Quest Reliability Warren Bamford Westinghouse John Broussand Dominion Engineering Jean Collin Dominion Engineering Aladar Csontos NRC Guy DeBoo Exelon Tim Gilman Structural Integrity Mauricio Gutierrez NRC Bob Hardies NRC Craig Harrington Electric Power Research Institute (EPRI)
Daniel Horner McGraw-Hill Russ Lieder FPL Energy, Seabrook Tim Lupold NRC Shah Malik NRC Mike Melton NEI Pete Riccaroella Structural Integrity Jim Riley Nuclear Energy Institute (NEI)
David Rudland NRC (Contractor)
Simon Sheng NRC David A. Steininger EPRI Edmund Sullivan NRC Greg Thorwald Quest Reliability Glenn White Dominion Engineering, Inc.
Ken Yoon AREVA NP ENCLOSURE
Nuclear Energy Institute Project No. 689 Electric Power Research Institute Project No. 669 cc:
Mr. Anthony Pietrangelo, Vice President Mr. Alexander Marion, Executive Director Regulatory Affairs Nuclear Operations & Engineering Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 arp@nei.org am@nei.org Mr. Jack Roe, Director Mr. Jay Thayer, Vice President Operations Support Nuclear Operations Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 jwr@nei.org jkt@nei.org Mr. Charles B. Brinkman Mr. John Butler, Director Washington Operations Safety-Focused Regulation ABB-Combustion Engineering, Inc. Nuclear Energy Institute 12300 Twinbrook Parkway, Suite 330 1776 I Street, NW, Suite 400 Rockville, MD 20852 Washington, DC 20006-3708 brinkmcb@westinghouse.com jcb@nei.org Mr. Gary L. Vine, Executive Director Mr. James H. Riley, Director Federal and Industry Activities, Nuclear Engineering Sector Nuclear Energy Institute EPRI 1776 I Street, NW 2000 L Street, NW, Suite 805 Washington, DC 20006-3708 Washington, DC 20036 jhr@nei.org gvine@epri.com Mike Melton, Senior Project Manager Mr. James Gresham, Manager 1776 I Street, NW, Suite 400 Regulatory Compliance and Plant Licensing Washington, DC 20006-3708 Westinghouse Electric Company man@nei.org P.O. Box 355 Pittsburgh, PA 15230-0355 Mr. David J. Modeen greshaja@westinghouse.com Vice President and Chief Nuclear Officer EPRI Ms. Barbara Lewis 1300 W. T. Harris Boulevard Assistant Editor Charlotte, NC 28262-8550 Platts, Principal Editorial Office dmodeen@epri.com 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com 3/8/07
Mr. John Gaertner EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 jgaertner@epri.com Ms. Rosa Yang EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 ryang@epri.com Mr. Kenneth Huffman EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 khuffman@epri.com 3/8/07