2007 Owners Activity Report for Inservice Examinations
ML071560075
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 05/25/2007
From: Laughlin G
Constellation Energy Group
To:
Document Control Desk, NRC/NRR/ADRO
References
Download: ML071560075 (16)


Text

P.O. Box 63 Lycoming, New York 13093 0

Constellation Energy-Nine Mile Point Nuclear Station May 25, 2007 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Nine Mile Point Nuclear Station Unit No. 1; Docket No. 50-220 2007 Owner's Activity Report for Imservice Examinations Pursuant to 10 CFR 50.55a, Nine Mile Point Nuclear Station, LLC (NMPNS) is submitting the 2007 Owner's Activity Report for Inservice Examinations for Nine Mile Point Unit 1 (NMP1). This Report summarizes the results of examinations performed during the First Refueling Outage (RFO-19) of the Third Inspection Period of the Third Ten-Year Inspection Interval (December 26, 1999 through December 25, 2009).

This Report meets the requirements of the American Society of Mechanical Engineers (ASME), Code Case N-532-1, approved for use by Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1," Revision 13.

Should you have any questions regarding the contents of this letter, please contact T. F. Syrell, Acting Licensing Director, at (315) 349-7198.

Very t uy u s Ga/JayLaughlin Manager Engineering Services GJL/GB/

Attachment:

(1)

Nine Mile Point Nuclear Station, Unit 1 2007 Owner's Activity Report for Refuel Outage 19 Inservice Examinations.

Document control Desk May 25, 2007 Page 2 cc:

S. J. Collins, NRC Regional Administrator, Region I L. M. Cline, NRC Senior Resident Inspector M. J. David, NRR Project Manager

ATTACHMENT (1)

NINE MILE POINT NUCLEAR STATION, UNIT 1 2007 OWNER'S ACTIVITY REPORT FOR REFUEL OUTAGE 19 INSERVICE EXAMINATIONS Report No. NMP1-OAR-003-19, Revision 00, Dated April 26,2007 Nine Mile Point Nuclear Station, LLC May 25, 2007

0 Constellation Energy Group Nine Mile Point Nuclear Station Constellation Energy Group 1997 Annapolis Exchange Parkway Annapolis, Maryland 21401 THIRD INSERVICE INSPECTION INTERVAL THIRD INSERVICE INSPECTION PERIOD 2007 OWNER'S ACTIVITY REPORT FOR RFO-19 INSERVICE EXAMINATIONS Prepared For Nine Mile Point Nuclear Station P.O. Box 63, Lake Road Lycoming, New York 13093 Commercial Service Date:

December 26,1969 NRC Docket Number.

50-220 Document Number:

NMP1-OAR-003-019 Revision Number.

00 Date:

Apdl26, 2007 Prepared by:

41ýj 7 J e~me

-1241 7

Ed*ard L. Anderson L Principal Engineer Analyst Corporate Engineering Programs Reviewed by: _

,I 9

R 44,1, )

Ro*iHall - PrincipoEngineer Analyst Corporate Engineering Programs Approved by: 'fl,-~L Glenn R Perkins a-eneral Supervisor Corporate Engineering Programs Reviewed by:

Todd Avis - S ogram Implementer Approved by-.

- Gn V

M el Co wa

-Ge e Supervisor Site Engineering Programs

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-19 0Constellation Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev.

00 Nine Mie Point 2007 OWNERS' ACTIVITY REPORT Nudear Station FOR Date: April 26, 2007 INSERVICE EXAMINATIONS Page 1-2 of 1-13 TABLE OF CONTENTS Table of Contents.....................................................................................................................................................

i-2 Record of Revision....................................................................................................................................................

i-3 Abstract....................................................................................................................................................................

i-4 Form OAR-1 Owner's Activity Report for Inservice (ISI) Inspection Plan NMPI-ISI-003...................................

i-6 Form OAR-1 Owner's Activity Report for Risk-Informed (RI-ISI) Inspection Plan NMP1-RI-ISI-003..................... 1-7 Form OAR-1 Owner's Activity Report for Containment (CISI) Inspection Plan NMPI-IWE-003........................

i-8 Table I Abstract of Examination and Tests........................................................................................................

i-9 Table 2 Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service........................

i-10 Table 3 Abstract of Repairs, Replacements, or Corrective Measures Required for Continued Service...........

i-11

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-19 0

Constellation Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev.

00 Nine Mile Point 2007 OWNERS' ACTIVITY REPORT Nudear Station FOR Date: April26, 2007 INSERVICE EXAMINATIONS Page 1-3 of 1-13 RECORD OF REVISION REVISION DATE AFFECTED REASON FOR REVISION No.

PAGES 00 April 26,2007 Entire Document Initial issue of Owner's Activity Report for ASME Section XI Inservice Inspection, Risk-Informed Inspection and Containment Inservice Examinations in accordance with the requirements of ASME Code Case N-532-1.

A_____________

A __________

A

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-19 O Cornst ellation Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev.

00 Nine MWe Point 2007 OWNERS' ACTIVITY REPORT Nudear Statin FOR Date: April 26,2007 INSERVICE EXAMINATIONS Page 1-4 of 1-13 ABSTRACT This Owner's Activity Report summarizes the results of the Nine Mile Point Nuclear Station (NMPNS), Unit 1, American Society of Mechanical Engineers (ASME)Section XI Inservice Inspection, Risk-Informed Inspection and Containment Inservice Examinations performed during Refueling Outage Nineteen (RFO-19), from March 17,2007 through April 15, 2007, and the First outage of the Third Inservice Inspection Period that started on 26 December 2006 and is scheduled to end on 25 December 2009.

As an alternate to the requirements of the ASME, Boiler and Pressure Vessel Code (B&PVC),Section XI, Article IWA-6000, NMPNS is Implementing ASME Code Case N-532-1, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1". Regulatory Guide 1.147, Revision 13, approved ASME Code Case N-532-1 for use. This Report complies with the requirements of Code Case N-532-1 and the conditions identified in RG 1.147.

OWNER'S ACTMTY REPORTS - FORM OAR-1 Owner's Activity Reports Form OAR-I's were prepared and certified upon completion of the Nine Mile Point Unit 1, 2007 refueling outage (RFO-19) examination activity in accordance with the following inspection plans and schedules:

NMPI-ISI-003, Third Inservice Inspection Plan and Schedule NMPI-RI-ISI-003, Risk-Informed Inspection Plan and Schedule NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule.

In addition to the Owner's Activity Report, Form OAR-i, the following Tables are also included:

a.

Abstract of Examinations and Tests, Table 1, provides such Information as ASME Code Examination Category, Total Examinations Required for the Inspection Interval, Total Examinations Required for this Period, Total Examinations Credited (%) for this Period, Total Examinations Credited (%) to Date for the Interval, and any remarks that may be applicable to each Examination Category.

b.

Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, Table 2.

provides a listing of item(s) with flaws or relevant conditions that required evaluation to determine acceptability for continued service, whether or not the flaw or relevant condition was discovered during a scheduled examination or test, and provides such information as Examination Category, Examination Item Number, Item Description, Flaw Characterization (as required by IWA-3300).

c.

Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Table 3, identifies those items containing flaws or relevant conditions that exceeded the ASME Section XI acceptance criteria (IWX-3000) or In the case of supports IWF-3000 acceptance criteria; even though the discovery of the flaw or relevant condition that necessitated the repair, replacement or corrective measure, may not have resulted from an examination or test required by Section XI, and provides such Information as Code Class, whether the item Is a repair, replacement or corrective action, item description, description of work, If the flaw or relevant condition was found during a scheduled Section XI Examination or test, date completed and the repair replacement plan number.

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003419 Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev.

00 Nine Mile Point 2007 OWNERS' ACTIVITY REPORT Nudear Station FOR Date: April 26,2007 INSERVICE EXAMINATIONS Page 1.5of 1-13 In accordance with ASME Section XA, IWB-2412 (a), IWC-2412, IWD-2412 and IWE-2412(a), and with the exception of the examinations that may be deferred until the end of the inspection interval as specified in Table IWB-2500-1, IWC-2500-1, IWD-2500-1, IWF-2500-1 and IWE-2500-1, including those examinations which NMPNS has requested and received approval in the form of relief request, the required examinations In each examination category have been completed for the Third In-service Inspection Period In accordance with Tables IWB-2412-1, IWC-2412-1, IWD-2412-1, and IWE-2412-1.

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-19 0

Constellation Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev.

00 Nine Mile Point 2007 OWNERS' ACTIVITY REPORT Nuclear Station FOR Date: April 26, 2007 INSERVICE EXAMINATIONS Page I-6of 1-13 FORM OAR-1 OWNER'S ACTIVITY REPORT As required by the provisions of the ASME Code Case N-532-1 Report Number NMPI-OAR-003-19 Owner Constellation Nuclear Generation. 1997 Annapolis Exchanaie Parkway, Annapolis, Maryland 21401 (Name and Address of Owner)

Plant Nine Mile Point Nuclear Station. P. 0. Box 63. Lake Road. Lycominq. New York 13093 (Name and Address of Plant)

Plant Unit I

Commercial Service Date December 26. 1969 Refueling Outage Number RFO-19 Current inspection Interval Third Inservice Inspection Interval - December 26. 1999 to December 25, 2009 (1st. 2nd, 3rd, 4th, Other)

Current Inspection Period Third Inservice Insoction Period - December 26. 2006 to December 25. 2009 (1 st, 2nd. 3rd)

Edition and Addenda of Section XI applicable to the Inspection Plan 1989 Edition, No Addenda Date and Revision of Inspection Plan NMP-ISI-003. Revision 04. Dated November 28.2006 Edition and Addenda of ASME Section XI appficable to Repairs and Replacements. if different than the Inspection PlanhNfA CERTIFICATE OF CONFORMANCE I certify that the statements made in this Owners Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations and corrective measures represented by this report conform to the requirements of Section XI.

Certificate of Authorization No.

WA Expiration Date NIA Sign erd_

8u

_isor-

_l0o0te Engineeringrogras Date (General Supervisor -Corprate Engineering Programs)

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New York and employed by Hartford Steam Boiler (HSBCT3 of Hartford. Connecticut have Inspected the items described In this Owners Activity Report, during the period 03/19/07 to 04112107

, and state that to the best of my knowledge and belief, the Owner has performed oft activities represented by this report In accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measures described In this report. Furthermore, neither the Inspector nor his employer shall be lable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.

Inspector's Signatu.:I National Board. State, Province, and Endorsements Date

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-19 Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev.

00 Nine Mile Point 2007 OWNERS' ACTIVITY REPORT Nucear Station FOR Date: April 26,2007 INSERVICE EXAMINATIONS page 1-7 of 1-13 FORM OAR-I OWNER'S ACTIVITY REPORT As required by the provisions of tho ASME Code Case N-532-1 Report Number NMP1-OAR-003-19 Owner Constellation Nuclear Generation. 1997 Annapoois Exchanae Parkway, Annapolis. Maryland 21401 (Name and Address of Owner)

Plant Nine Mile Point Nuclear Station, P. 0. Box 63. Lake Road. Lvcomina. New York 13093 (Name and Address of Plant)

Plant Unit I

Commercial Service Date December 26. 1969 Refueling Outage Number REO-19 Current Inspection Interval Third Inservice Insoection Interval - December 26, 1999 to December 25. 2009 (1st, 2nd, 3rd. 4th, Other)

Current Inspection Period Thrd Inservice Inspection Period - December 26, 2006 to December 25, 2009 (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the Inspection Plan 1989 Edition, No Addenda Date and Revision of Inspection Plan NMPI-RI-ISI-003. Revision 01. Dated December 30, 2003 Edition and Addenda of ASME Section Xi applicable to Repairs and Replacements, K different than the Inspection Plan WA CERTIFICATE OF CONFORMANCE I certify that the statements made In this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations and corrective measures represented by this report conform to the requirements of Section XI.

Certificate of Authorization No.

NWA Expiration Date NA Signe A 4 4.A~.- 4>

(If applicable)

Dt Signed Sp o

A DateE 1L-(Geea Suevio Coprtni NPorm CERTIFICATE OF INSERVICE INSPECTION I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of ew Ygorkand employed by Hartford Steam Boiler 0IHSBCT) of Hartford. Connecticut have Inspected the Items described in this Owner'es Activity Report, during the period -=19&07 to 04//07 a and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section X1.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measures described In this report. Furthermore, neither the Inspector nor his employer shall be Roble in any manner for any personal injury or property damage or a loss of any kind arising from or connected with thispection.,(

Inseo SCommissions; NB9a89 A. S N. I NY 3061 Inspector's Signature~

National Board. State, Province, and Endorsements Date 519 1 (J-

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-19 O Constellation Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev.

00 Nine Mile Point 2007 OWNERS' ACTIVITY REPORT Nuclear Station FOR Date: April 26, 2007 INSERVICE EXAMINATIONS Page I-Sof 1-13 FORM OAR-1 OWNER'S ACTIVITY REPORT As required by the provisions of the ASME Code Case N-532-1 Report Number NMPI-OAR-003-19 Owner Constellation Nuclear Generation, 1997 Annapolis Exchanae Parkway. Annapolis, Maryland 21401 (Name and Address of Owner)

Plant Nine Mile Point Nuclear Station. P. 0. Box 63, Lake Road, Lycominq. New York 13093 (Name and Address of Plant)

Plant Unit..

1.__

Commercial Service Date December 26. 1969 Refueling Outage Number RFO-19 Current Inspection Interval First Containment Inspection Interval - December 26, 1999 to December 25. 2009 (1 at, 2nd, 3rd, 4th, Other)

Current Inspection Period Third Inservice Inspection Period - December 26, 2006 to December 25, 2009 (1st, 2nd. 3rd)

Edition and Addenda of Section XI applicable to the Inspection Plan 1998 Edition, No Addenda Date and Revision of Inspection Plan NMPI-IWE-003. Revision 05. Dated May 31. 2006 Edition and Addenda of ASME Section Xl applicable to Repairs and Replacements, if different than the Inspection Plan NIA CERTIFICATE OF CONFORMANCE I certify that the statements made In this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations and corrective measures represented by this report conform to the requirements of Section XI.

Certificate of Authorization No.

NIA Expiration Date WA Signed

/

A (if appicable)

/Date (General Supervisor - Corporate Engineering Programs)

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province ofNewYork and employed by Hartford Steam Boiler (HSBCTl of Hartford. Connecticut have Inspected the Riems described In this Owner's Activity Report, during the period 0311g17 to.4ZD7

, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xi.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied. concerning the examinations, tests, repairs, replacements, evaluations and corrective measures described in this report. Furthermore, neither the Inspector nor his employer shall be liable iTr2act manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

ý V%,

`ý Commissions NO9889 A. & K I NY 3061 Inspector's Signature National Board, State. Province, and Endorsements Date S-\\Ct\\lC

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-19 O

Constellation Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev.

00 Nine Mile Point 2007 OWNERS' ACTIVITY REPORT NjLear Station FOR Date: April 26, 2007 INSERVICE EXAMINATIONS Page 1-9of 1-13 TABLE I ABSTRACT OF EXAMINATION AND TESTS As required by ft provisions of the ASME Code Case N-832-1 TOTAL TOTAL

  • TOTAL TOTAL EXAMINATIONS CODE EXAMINATIONS EXAMINATIONS EXAMINATIONS CREDITED (%) TO EXAMINATION REQUIRED FOR REQUIRED FOR CREDITED (%) FOR DATE FOR THE CATEGORY INTERVAL THIS PERIOD THE PERIOD INTERVAL REMARKS B.A 45 33 8-24.2%

20-44.4%

Deferral Permissible 8-D 80 31 21-67.7%

71 -88.7%

Deferral Permissible 8-4-1 404 135 127-94.0%

396-98.0%

Deferral Permissible B-G-2 95 21 8-38.0%

82-86.3%

B-K 12 6

3-50.0%

9-75%

CC N-509 B-L-2 I

1 0- 0.0%

0- 0.0%

Deferral Permissible, When Disassembled B-M1 1

1 0-0.0%

0- 0.0%

Deferral Permissible B-M-2 24 11 1-0.09%

14-68.3%

Deferral Permissible, When Disassembled B-N-1 99 47 42-89.3%

94-94.9%

Note I B-N-2 28 13 12-92.3%

27-96.4%

Deferral Permissible B-0 a

3 3 - 100%

8-100%

Deferral Permissible C-A 4

2 2-100%

4-100%

C-8 4

2 2-100%

4-100%

C-C 33 13 11-84.6%

31-93.9%

CC N-509 C-G 21 10 0-0.0%

11 - 52.3%

RR-ISI-7, When Disassembled D-A 25 12 12.100%

25-100%

CC-N-509 D-B 12 0

0-0%

12-100%

CC-N-509 3

0 0-0%

3-100%

CC-N-509 F-A 201 80 57-71.2%

178-88.5%

CC N-491,1

~

72 34 19 -65.8%

57-79.1%

RI-ISI. Note2 E-A 2417 791 733 - 92.7%

2359-97.6%

Note 1 Notes:

1.

100% of accessible surfaces examined each period

2.

Reference RR-Ri-ISI-22, all Risk-lrformed examinations to be completed in the 2"d and 3 1d periods

Nine Mile Point Nuclear Station Unit I NMPl-OAR-003-19 O

Constellation Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev.

00 Nine Mile Point 2007 OWNERS' ACTIVITY REPORT Nuclear Station FOR Date: April 26, 2007 INSERVICE EXAMINATIONS Page 1-10 of 1-13 TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE As required by the provisions of the ASME Code Case N-532-1 FLAW OR RELEVANT FLAW CONDITION EXAMINATION ITEM ITEM CHARACTERIZATION FOUND DURING CATEGORY NUMBER DESCRIPTION (IWA-3300)

SCHEDULED SECTION XI EXAMINATION OR TEST (YES OR NO)

WA WA Reactor Vessel Flange Mating Surface Relevnt Coitions No F-A F1.30A ISuut7-

-t7 s I~RlJvAtC P%,tdon Yes R-A R1.20 NoATWEnd Surface Planar Yes R-A Rl.20 N

N s

d u

Ce S

~Yes E-C E4.l Drywll Uner 225 Releva~u*Cndition Yes

'neIationac a 25 E-C E4.11 I

Dl on*

% 4d Releva~Qnulo1 e

,k:-c

'ra-e at 225' E-C E4.11

%&Z-iatea Relevatodition Yes l

e ndition Yes E-C E4.11

%e-Zeva eTeonu

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-19 0Cons Energy Grotp THIRD INSERVICE INSPECTION INTERVAL Rev.

00 Nine Mile Point 2007 OWNERS' ACTMTY REPORT Nuclear Station FOR Date: April 26, 2007 INSERVICE EXAMINATIONS Page I -11 of 1-13 TABLE 3 ABSTRACT OF REPAIRS. REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE As recuired by the provisions of the ASME Code Case N-532-1 FLAW OR RELEVANT REPAIR CONDITION FOUND REPLACEMENT DURING SCHEDULED REPAIR OR DESCRIPTION SECTION Xi REPLACEMENT CODE CORRECTIVE ITEM OF EXAMINATION OR TEST DATE PLAN CLASS MEASURE DESCRIPTION WORK (YES OR NO)

COMPLETE NUMBER 1

Repair RPV Flange Weld Repair of two No 04/11/07 07-03643-00 Mating Surface steam cuts 2

Corrective 39-H2 Spring Adjusted Clamp Yes 027 07-03619-00 Measure Support following re.

installation

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-19 0

Constellation Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev.

00 Nine Mile Point 2007 OWNERS' ACTIVITY REPORT Nuclear Station FOR Date: April 26, 2007 INSERVICE EXAMINATIONS Page 1-12 of 1-13 END OF INSERVICE INSPECTION OWNER'S ACTIVITY REPORT FOR REFUELING OUTAGE NINETEEN (RFO-19)

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003.19 0

Constellation Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev.

00 Nine MiWe Point 2007 OWNERS' ACTIVITY REPORT Nuclear Station FOR Date: April26, 2007 INSERVICE EXAMINATIONS Page i-13of 1-13 THIS PAGE LEFT BLANK INTENTIONALY