ML071500262

From kanterella
Jump to navigation Jump to search
Cover Letter Only of MC&A Report for Duane Arnold
ML071500262
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 05/25/2007
From: Christine Lipa
NRC/RGN-III/DRP/RPB4
To: Vanmiddlesworth G
Duane Arnold
References
IR-07-401
Download: ML071500262 (5)


Text

Official Use Only - Security-Related Information May 25, 2007 Mr. Gary Van Middlesworth Vice-President FPL Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324-9785

SUBJECT:

DUANE ARNOLD ENERGY CENTER, NRC MATERIAL CONTROL & ACCOUNTING TI 2515/154 PHASE III INSPECTION REPORT 05000331/2007401(DRP)

Dear Mr. Van Middlesworth:

On April 13, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the material control and accounting (MC&A) safeguards program at the Duane Arnold Energy Center. The inspection was conducted under Phase III of Temporary Instruction 2515/154. The enclosed inspection report documents the inspection results, which were discussed with members of your staff during an exit meeting on April 12, 2007.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed storage of special nuclear material, and interviewed personnel. Areas examined during the inspection included physical inventory and accounting records.

Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.

EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)

Exemption number: 5 Nuclear Regulatory Commission review required before public release.

Christine A. Lipa, Chief, BR4, DRP, RIII Name and organization of person making determination.

Date of determination: 05/10/07 Official Use Only - Security-Related Information

Official Use Only - Security Related Information Gary Van Middlesworth Based on the results of this inspection, the NRC has determined that one Severity Level IV violation of NRC requirements occurred. The violation is being treated as a Non-Cited Violation (NCV) consistent with Section VI.A of the Enforcement Policy. This NCV is described in the subject inspection report. If you contest the violation or significance of the violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington DC 20555-0001; and the NRC Senior Resident Inspector at the Duane Arnold Energy Center.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from NRCs document system ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.

Official Use Only - Security-Related Information

Official Use Only - Security Related Information Gary Van Middlesworth Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-331 License No. DPR-49

Enclosure:

Inspection Report 05000331/2007401(DRP) w/

Attachment:

Supplemental Information cc w/o encl:

J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs D. Blair, Manager, Plant Operations D. McGhee, State Liaison Officer Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.

Official Use Only - Security-Related Information

Official Use Only - Security Related Information Gary Van Middlesworth Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-331 License No. DPR-49

Enclosure:

Inspection Report 05000331/2007401(DRP) w/

Attachment:

Supplemental Information cc w/o encl:

J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs D. Blair, Manager, Plant Operations D. McGhee, State Liaison Officer Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.

DOCUMENT NAME: C:\FileNet\ML071500262.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NSIR RIII NAME NShah:dtp DMelendez*CAL Rcostello*FPeduzzi CLipa for for DATE 05/11/07 05/25/07 05/24/07 05/25/07 OFFICIAL RECORD COPY Official Use Only - Security-Related Information

Official Use Only - Security Related Information Letter to Gary Van Middlesworth from Christine A. Lipa dated May 25, 2007

SUBJECT:

DUANE ARNOLD ENERGY CENTER, NRC MATERIAL CONTROL & ACCOUNTING TI 2515/154 PHASE III INSPECTION REPORT 05000331/2007401(DRP)

ADAMS Distribution w/encl:

Branch Chief SRI RI PE NRR LPM RHC-Ralph Costello MSW2 - Martha Williams DXV1 - Dori Votolato DKRI - Deani Riffle Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.

Official Use Only - Security-Related Information