ML071440470
| ML071440470 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 05/22/2007 |
| From: | Coutu T Exelon Nuclear |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2010-0209 | |
| Download: ML071440470 (12) | |
Text
Braidwood Generating Station NRC 2006 End of Cycle Meeting Tom Coutu Site Vice President
2 Plant Performance 2006 9 Operated Safely and Reliably in 2006 Achieved 4 million hours without a lost time accident Capacity Factor - 94.7%
Safe and successful completion of two refueling outages
3 2007 Focus Areas 9 Safety 9 Training 9 Employee Radiological Exposure 9 Equipment Reliability
4 Tritium Remediation 9 Remediation efforts are working - concentrations reduced by 87%
Exelon and Will County have sampled area drinking water wells and all are substantially below the U.S EPA safe drinking water limits Releases posed no health or safety hazard - confirmed by Agency for Toxic Substances and Disease Registry report (requested by U.S. Sen. Dick Durbin), Illinois Department of Public Health, Will County Health Department and NRC Committed to keeping the public informed
5 Supporting the Community 9 Exelon is a member of the community 9 Contributions and donations in 2006:
$11.5 million for the Village of Godley to purchase a new water system Employees donated $211,000 to the United Way Fishing for a Cure raised over $20,000 for Make-a-Wish of Illinois Supported Braidwood Family Care (local food bank)
Sponsored Braidwood Shootout (high school basketball tournament) and Braidwood SummerFest Fireworks Conducted Four Employee Blood Drives to Benefit Heartland Blood Centers 9 Braidwood is Will Countys highest taxpayer ($13.2 million paid in 2006)