June 11, 2007 Mr. G. R. Peterson Vice President McGuire Nuclear Station Duke Power Company LLC 12700 Hagers Ferry Road Huntersville, NC 28078
SUBJECT:
NRC RECEIPT OF DUKE POWER COMPANY LLCS RESPONSE TO NRC GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS, FOR MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 (TAC NOS. MD1596 & MD1597)
Dear Mr. Peterson:
The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your response dated June 7, 2006, to Generic Letter 2006-003, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. Under oath or affirmation, your response states that your nuclear power plant relies on the Hemyc fire barrier system, and you have submitted documentation that you plan to disposition any nonconforming conditions in accordance with Title 10 of the Code of Federal Regulations, Part 50, Section 50.48(c) process. Also, compensatory measures will remain in place until nonconforming conditions have been resolved and those resolutions are acceptable to the NRC.
The use of fire resistive cables, in-lieu of 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area, is in accordance with current NRC guidance.
The basis for stating that these fire resistive cables have been designed and installed in accordance with NRC guidance should be maintained on site, and will be subject to inspection during the normal NRC inspection process.
If you have any questions regarding this response, please contact me at 301-415-1345.
Sincerely,
/RA/
John Stang, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370 cc: See next page
June 11, 2007 Mr. G. R. Peterson Vice President McGuire Nuclear Station Duke Power Company LLC 12700 Hagers Ferry Road Huntersville, NC 28078
SUBJECT:
NRC RECEIPT OF DUKE POWER COMPANY LLCS RESPONSE TO NRC GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS, FOR MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 (TAC NOS. MD1596 & MD1597)
Dear Mr. Peterson:
The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your response dated June 7, 2006, to Generic Letter 2006-003, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. Under oath or affirmation, your response states that your nuclear power plant relies on the Hemyc fire barrier system, and you have submitted documentation that you plan to disposition any nonconforming conditions in accordance with Title 10 of the Code of Federal Regulations, Part 50, Section 50.48(c) process. Also, compensatory measures will remain in place until nonconforming conditions have been resolved and those resolutions are acceptable to the NRC.
The use of fire resistive cables, in-lieu of 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area, is in accordance with current NRC guidance.
The basis for stating that these fire resistive cables have been designed and installed in accordance with NRC guidance should be maintained on site, and will be subject to inspection during the normal NRC inspection process.
If you have any questions regarding this response, please contact me at 301-415-1345.
Sincerely,
/RA/
John Stang, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370 cc: See next page DISTRIBUTION:
LPL2-1 R/F PUBLIC RidsNrrPM (J. Driscoll)
RidsNrrDorlLpl2-1 (EMarinos)
RidsNrrDciCvib RidsOgcRp RidsNrrPMJStang (hard copy)
RidsRgn2MailCenter (JMoorman)
RidsNrrLAMOBrien (hard copy)
RidsAcrsAcnwMailCenter RidsNrrAfpbLeadPM (DFrumkin)
Adams Accession Number: ML071430162 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA AFPB/BC NRR/LPL2-1/BC NAME JStang:tw MOBrien SWeerakkody EMarinos DATE 6/8/07 6/8/07 6/7/07 6/11/07 OFFICIAL RECORD COPY
McGuire Nuclear Station, Units 1 & 2 cc:
Ms. Lisa F. Vaughn Associate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina 28202 County Manager of Mecklenburg County 720 E. Fourth St.
Charlotte, NC 28202 Mr. C. Jeffrey Thomas Regulatory Compliance Manager Duke Energy Corporation McGuire Nuclear Site 12700 Hagers Ferry Road Huntersville, NC 28078 Senior Resident Inspector c/o U.S. Nuclear Regulatory Commission 12700 Hagers Ferry Road Huntersville, NC 28078 Dr. John M. Barry Mecklenburg County Department of Environmental Protection 700 N. Tryon St Charlotte, NC 28202 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road, 12th Floor Charlotte, NC 28210 NCEM REP Program Manager 4713 Mail Service Center Raleigh, NC 27699-4713 Mr. Leonard G. Green Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602 Mr. R.L. Gill, Jr., Manager Nuclear Regulatory Issues &
Industry Affairs Duke Energy Corporation 526 S. Church St.
Mail Stop EC05P Charlotte, NC 28202 Division of Radiation Protection NC Dept of Environment, Health & Natural Resources 3825 Barrett Dr.
Raleigh, NC 27609-7721 Mr. T. Richard Puryear Owners Group (NCEMC)
Duke Energy Corporation 4800 Concord Road York, SC 29745 Mr. Henry Barron Group Vice President, Nuclear Generation
& Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Ms. Kathryn B. Nolan Senior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202