MONTHYEARML22314A0752022-11-10010 November 2022 2B - Exam Administrative Items - Normal Release ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML18338A0882018-12-0404 December 2018 Attachment FormerFAQResponses_11302018 ML18180A2602018-06-29029 June 2018 NFPA 805 FAQ 10-0059 - NFPA 805 Monitoring ML18073A3582018-03-15015 March 2018 NRC Staff Comments FAQ 18-0015 ML17235B1482017-08-23023 August 2017 U.S. Nuclear Regulatory Commission - Tornado Missile Risk Evaluator (TMRE) Methodology Topics and Methodology Feedback ML16315A2892016-11-10010 November 2016 Attachment 5 EPRI RETRAN-3D Computer Code Manuals, NP-7450(A) RA-16-003, Attachment 5 EPRI RETRAN-3D Computer Code Manuals, NP-7450(A)2016-11-10010 November 2016 Attachment 5 EPRI RETRAN-3D Computer Code Manuals, NP-7450(A) ML18039A8562016-06-0202 June 2016 Fpra FAQ 16-0011 - Cable Tray Ignition - Draft ML14191B2622014-07-10010 July 2014 NFPA 805 Transition FAQ 14-0070, Revision 0 ML13170A3282013-06-13013 June 2013 Special Inspection Question & Answers ML1214300352012-05-21021 May 2012 NFPA 805 Transition FAQ 12-0062, Revision 1 ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1204105892012-02-10010 February 2012 NFPA 805 Transition FAQ 10-0059, Revision 5 ML1204105852012-02-10010 February 2012 NRC Staff Response to NFPA 805 Transition FAQ 10-0059, Revision 4 ML1203201932012-02-0101 February 2012 NFPA 805 Transition FAQ 10-0059, Revision 4 ML1202603842012-01-13013 January 2012 FAQ Revision NFPA 805 Monitoring ML1201903132012-01-13013 January 2012 NFPA 805 Transition FAQ 10-0059, Rev 3 ML1202603722012-01-13013 January 2012 NFPA 805 Monitoring ML1202604252012-01-13013 January 2012 FAQ-1 - NFPA 805 Monitoring ML1202604402012-01-13013 January 2012 FAQ - NFPA 805 Monitoring ML1128600532011-09-30030 September 2011 NRC Staff Comments on FAQ 59R2 ML1127304102011-09-30030 September 2011 NRC Staff Response to NFPA 805 Transition FAQ 10-0059, Revision 2 RA-11-025, Enclosure 1, Attachment 2 - Duke Energy Corporation and Progress Energy, Inc. Organization Charts Post Merger2011-09-0202 September 2011 Enclosure 1, Attachment 2 - Duke Energy Corporation and Progress Energy, Inc. Organization Charts Post Merger ML1123401522011-08-19019 August 2011 NFPA 805 Transition FAQ 10-0059, Rev 2 ML1111804812011-04-21021 April 2011 NFPA 805 Transition FAQ 10-0059, Rev 1 ML1109105082011-03-31031 March 2011 NRC Staff Response to NFPA 805 Transition FAQ 10-0059, Revision 0 (Part 2) ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML0916101892009-06-0303 June 2009 NFPA 805 Transition Pilot Plant FAQ 07-0035, Revision 2, Bus Duct Counting Guidance for High Energy Arcing Faults ML0909905112009-04-29029 April 2009 Enclosure 1: Shearon Harris Regulatory Audit Participants ML1020301612009-04-12012 April 2009 Tritium Concern Talking Points ML1019402162009-04-12012 April 2009 Offsite Notification to State/Local Agencies Regarding Tritium Release Onsite - EN 44951 ML0909305002009-04-0303 April 2009 Afpb Staff Response to NFPA 805 Transition Pilot Plant FAQ 07-0035, Revision 1 ML1020301722009-04-0101 April 2009 Tritium Questions and Answers ML0908500122009-03-26026 March 2009 NFPA 805 Transition Pilot Plant FAQ 07-0035, Revision 1, Bus Duct Counting Guidance for High Energy Arching Faults ML0902902182009-01-22022 January 2009 NFPA 805 Transition Pilot Plant FAQ 07-0030 ML1019402762008-12-0202 December 2008 Nuclear Condition Report for Tritium in Groundwater NEI 04-02, NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 2, Lessons Learned - NEI 04-02 B-2 Table2008-09-12012 September 2008 NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 2, Lessons Learned - NEI 04-02 B-2 Table ML0825904662008-09-12012 September 2008 NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 2, Lessons Learned - NEI 04-02 B-2 Table ML0914201382008-09-0909 September 2008 NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 2 - Clean Version ML0821000342008-07-24024 July 2008 NFPA 805 Transition Pilot Plant FAQ 07-0038, Revision 1 ML0813006972008-05-0909 May 2008 NFPA 805 Transition Pilot Plant FAQ 07-0032, Revision 2 ML0809101362008-03-28028 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 1, Lessons Learned - NEI 04-02 B-2 and B-3 Tables ML0807004112008-03-10010 March 2008 NFPA 805 Transition Pilot Plant FAQ 07-0032, Revision 1, Clarification of 10 CFR 50.48(c), 50.48(a), and GDC 3. ML0807001572008-03-10010 March 2008 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 5 ML0806704192008-03-0707 March 2008 CDBI Findings ML0735500252007-12-20020 December 2007 NFPA 805 Transition Pilot Plant FAQ 07-0036, Revision 1 ML0735500212007-12-20020 December 2007 NFPA 805 Transition Pilot Plant FAQ 06-0025, Revision 4 2022-02-16
[Table view] |
Text
FAQ Number 07-0031 FAQ Revision 0 FAQ Title Clarification of Miscellaneous Ignition Source Binning Issues Plant: Harris Date: May 17, 2007
Contact:
Dave Miskiewicz Phone: 919.546.7588 Email: David.Miskiewicz@pgnmail.com Distribution: (NEI Internal Use) 805 TF FPWG RATF RIRWG BWROG PWROG Purpose of FAQ:
Clarification/enhancement of Ignition Source counting guidance for miscellaneous items in NUREG/CR-6850, supporting NFPA-805 Fire PRA application.
Is this Interpretation of guidance? Yes / No Proposed new guidance not in NEI 04-02? Yes / No Details:
NEI 04-02 guidance needing interpretation (include section, paragraph, and line numbers as applicable):
New attachment on interpretation issues Circumstances requiring guidance interpretation or new guidance:
NUREG/CR-6850, Section 6.5.6 The guidance provided in NUREG/CR-6850 for Task 6, Fire Ignition Frequency, is subject to application inconsistency in the treatment of motors/pumps (Bins 14, 21, 26).
Bin 14 (motors) - (count) greater than 5hp
- may include elevator motors, valve motors, etc.
Bin 21 (pumps) - (do not count) below 5 hp
- large valves that include hydraulic fluid powered mechanisms.
Bin 26 (ventilation subsystems) - (do not count) 5 hp or less And transformers:
Bin 23 - (count) essential service lighting transformers.
- count wall-mounted transformers if they do satisfy other counting criteria Page 1 of 3 faq 07-0031 rev 0.doc
FAQ Number 07-0031 FAQ Revision 0 FAQ Title Clarification of Miscellaneous Ignition Source Binning Issues
- do not count small lighting transformers.
The diversity in wording can cause differences in how 5 hp components and how small transformers are counted.
Detail contentious points if licensee and NRC have not reached consensus on the facts and circumstances:
This topic has impact on the NFPA-805 pilots, non-pilots and other users of NUREG/CR-6850.
Potentially relevant existing FAQ numbers:
The characterization and counting of electrical cabinets for Bin 15 determination is addressed by FAQ 06-0016. HEAFs are addressed by FAQ-06-0017, and Main Control Boards are addressed by FAQ 06-0018.
Response Section:
Proposed resolution of FAQ and the basis for the proposal:
Bin 14, 21, 26 - Only count sources greater than 5 hp.
Bin 14 - Do not count MOV motors Bin 21 - Count Large hydraulic actuators (> 5 hp) as pumps only if the motor is greater than 5 hp Bin 23 - Count transformers rated 45 KVa or greater Basis:
The guidance proposed will provide more consistency when determining plant specific ignition frequencies while working within the bounds of the exiting data provided by the NUREG. This should facilitate the review and acceptability of the results.
The guidance for counting MOVs does not appear to the consistent with industry experience.
A review of the fire events database did not identify any MOV motor fires. In addition, their inclusion would tend to dilute the fire frequency for other general motors in the plant. MOV motors typically have NEMA TENV (totally enclosed non-ventilated) enclosures and are greased lubricated. The treatment of a fire at an MOV in a fire PRA will exclusively be a non-propagating fire whose consequent would be limited to loss of only the MOV. This would generally screen on the basis of the fire frequency being equivalent to the random failure of the MOV. Therefore, it is proposed that all MOVs that involve TENV enclosures be excluded from the fire frequency counted regardless of motor rating.
Page 2 of 3 faq 07-0031 rev 0.doc
FAQ Number 07-0031 FAQ Revision 0 FAQ Title Clarification of Miscellaneous Ignition Source Binning Issues There is only one bin for in-plant transformers with no size limitations. A counting threshold such as that used for motors is needed. 45 KVa is based on typical lighting transformers identified during walkdowns. These are generally about the size of a 2 drawer file cabinet.
If appropriate, provide proposed rewording of guidance for inclusion in the next Revision: