Inservice Testing and Inservice Inspection Programs 10-Year Interval Changes
ML071350369
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 05/03/2007
From: Price J
Dominion Nuclear Connecticut
To:
Document Control Desk, NRC/NRR/ADRO
References
07-0340
Download: ML071350369 (2)


Text

il.

Dominion Nuclear Connecticut, Inc.

Millstone Power Station Rope Ferry Road, Waterford, CT 06385 MAY 0 3 2007 U.S. Nuclear Regulatory Commission Serial No. 07-0340 Attention: Document Control Desk MPS Lic/WDB RO Washington, DC 20555 Docket Nos. 50-336 50-423 License No. DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT. INC.

MILLSTONE POWER STATION UNITS 2 AND 3 INSERVICE TESTING AND INSERVICE INSPECTION PROGRAMS 10-YEAR INTERVAL CHANGES The purpose of this letter is to inform the NRC staff of changes in the end date for the Millstone Power Station Units 2 and 3 (MPS2 and MPS3) third and second, respectively, 10-year Inservice Testing (IST) and Inservice Inspection (ISI) intervals. These changes are being made in accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, 1989 edition (no Addenda) pursuant to 10 CFR 50.55a(f) and (g).

As specified within ASME IWA-2430 paragraph (d), "Each inspection interval may be reduced or extended by as much as one year. Adjustments shall not cause successive intervals to be altered by more than one year from the original pattern of intervals." The MPS2 and MPS3 IST intervals are being adjusted to the same end date to synchronize and align the MPS2 and MPS3 IST Programs to the same Code Edition and Addenda. The MPS2 and MPS3 ISI intervals are being adjusted to coordinate the performance of required inspections with the dates of scheduled refueling outages.

The end of the MPS2 third 10-year IST interval will be reduced from March 31, 2009 to March 31, 2008, and the end of the MPS3 second 10-year IST interval will be extended from February 6, 2008 to March 31, 2008. The end of the MPS2 third 10-year ISI interval will be extended from March 31, 2009 to March 31, 2010, and the end of the MPS3 second 10-year ISI interval will be extended from October 23, 2008 to April 23, 2009. These adjustments do not cause successive intervals to be altered by more than one year from the original pattern of intervals.

If you have any questions or require additional information, please contact Mr.

David W. Dodson at (860) 447-1791, extension 2346.

Very truly yours, 2 Price ViVice President - Millstone

Serial No. 07-0340 Docket Nos. 50-336 and 50-423 IST/ISI Interval Changes Page 2 of 2 Attachments: None Commitments made in this letter: None.

cc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. J. D. Hughey Project Manager, Mail Stop 8B3 U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station