ML071340332
ML071340332 | |
Person / Time | |
---|---|
Site: | Nuclear Energy Institute, PROJ0669 |
Issue date: | 05/21/2007 |
From: | Rosenberg S NRC/NRR/ADRA/DPR/PSPB |
To: | Jeffrey Riley Nuclear Energy Institute |
Mensah T | |
References | |
TAC MD0705 1002865 | |
Download: ML071340332 (2) | |
Text
May 21, 2007 Mr. James H. Riley, Director Engineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708
SUBJECT:
WITHDRAWAL OF ELECTRIC POWER RESEARCH INSTITUTE (EPRI)
TOPICAL REPORT (TR)-1002865, REVISION 0, REACTIVITY INITIATED ACCIDENTS [(RIA)]: BASES FOR RIA FUEL ROD FAILURES AND CORE COOLABILITY CRITERIA (TAC NO. MD0705)
Dear Mr. Riley:
By letter dated April 22, 2002, as supplemented by letters dated June 12, 2002, and June 13, 2006, the Nuclear Energy Institute (NEI) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review an Electric Power Research Institute (EPRI) TR-1002865, Revision 0, Reactivity Initiated Accidents: Bases for RIA Fuel Rod Failures and Core Coolability Criteria.
Subsequently, by letter dated May 9, 2007, the NEI requested withdrawal of its TR from NRC review in light of the various discussions held with NRC staff and the recent release by the Office of Nuclear Reactor Regulation of interim acceptance criteria for RIA as a proposed revision to NUREG-0800. In its withdrawal letter, the NEI also indicated that it planned to resubmit EPRI TR -1002865 in early 2008. This resubmittal would revise the contents of the TR for consideration by the NRC as the basis for the final RIA acceptance criteria.
Based upon your request, the NRC staff will terminate its review of EPRI TR-1002865, Revision 0. The review schedule milestones will be discussed and agreed upon in a telephone conference between your staff and the NRC staff once the TR is resubmitted.
By letter dated January 3, 2005, a fee waiver was granted for the NRCs review in accordance with the applicable provisions of Title 10 of the Code of Federal Regulations, Section 170.11.
Since a fee waiver was approved to support the NRCs review of this TR, the correspondence which transmits the revised TR should reference this memorandum.
If you have questions regarding this matter, please contact Tanya M. Mensah at (301) 415-3610.
Sincerely,
/RA/
Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 689 and 669
May 21, 2007 Mr. James H. Riley, Director Engineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708
SUBJECT:
WITHDRAWAL OF ELECTRIC POWER RESEARCH INSTITUTE (EPRI)
TOPICAL REPORT (TR)-1002865, REVISION 0, REACTIVITY INITIATED ACCIDENTS [(RIA)]: BASES FOR RIA FUEL ROD FAILURES AND CORE COOLABILITY CRITERIA (TAC NO. MD0705)
Dear Mr. Riley:
By letter dated April 22, 2002, as supplemented by letters dated June 12, 2002, and June 13, 2006, the Nuclear Energy Institute (NEI) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review an Electric Power Research Institute (EPRI) TR-1002865, Revision 0, Reactivity Initiated Accidents: Bases for RIA Fuel Rod Failures and Core Coolability Criteria.
Subsequently, by letter dated May 9, 2007, the NEI requested withdrawal of its TR from NRC review in light of the various discussions held with NRC staff and the recent release by the Office of Nuclear Reactor Regulation of interim acceptance criteria for RIA as a proposed revision to NUREG-0800. In its withdrawal letter, the NEI also indicated that it planned to resubmit EPRI TR -1002865 in early 2008. This resubmittal would revise the contents of the TR for consideration by the NRC as the basis for the final RIA acceptance criteria.
Based upon your request, the NRC staff will terminate its review of EPRI TR-1002865, Revision 0. The review schedule milestones will be discussed and agreed upon in a telephone conference between your staff and the NRC staff once the TR is resubmitted.
By letter dated January 3, 2005, a fee waiver was granted for the NRCs review in accordance with the applicable provisions of Title 10 of the Code of Federal Regulations, Section 170.11.
Since a fee waiver was approved to support the NRCs review of this TR, the correspondence which transmits the revised TR should reference this memorandum.
If you have questions regarding this matter, please contact Tanya M. Mensah at (301) 415-3610.
Sincerely,
/RA/
Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 689 and 669 DISTRIBUTION:
PUBLIC PClifford RCaruso PSPB Reading File AMendiola JWermiel RidsNrrDpr JVoglewede DJackson RidsNrrDprPspb RMeyer MHart RidsNrrLADBaxley RLandry RidsAcrsAcnwMailCenter SRosenberg (Hardcopy)
RidsOgcMailCenter RidsNrrPMTMensah ADAMS ACCESSION NO.:ML071340332 NRR-106 OFFICE PSPB/PM PSPB/LA PSPB/BC NAME TMensah DBaxley SRosenberg DATE 5/18 /07 5/17 /07 5/ 21 /07 OFFICIAL RECORD COPY
Nuclear Energy Institute Project No. 689 Electric Power Research Institute Project No. 669 cc:
Mr. Anthony Pietrangelo, Vice President Mr. Alexander Marion, Executive Director Regulatory Affairs Nuclear Operations & Engineering Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 arp@nei.org am@nei.org Mr. Jack Roe, Director Mr. Jay Thayer, Vice President Operations Support Nuclear Operations Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 jwr@nei.org jkt@nei.org Mr. Charles B. Brinkman Mr. John Butler, Director Washington Operations Safety-Focused Regulation ABB-Combustion Engineering, Inc. Nuclear Energy Institute 12300 Twinbrook Parkway, Suite 330 1776 I Street, NW, Suite 400 Rockville, MD 20852 Washington, DC 20006-3708 brinkmcb@westinghouse.com jcb@nei.org Mr. Gary L. Vine, Executive Director Mr. James H. Riley, Director Federal and Industry Activities, Nuclear Engineering Sector Nuclear Energy Institute EPRI 1776 I Street, NW 2000 L Street, NW, Suite 805 Washington, DC 20006-3708 Washington, DC 20036 jhr@nei.org gvine@epri.com Mike Melton, Senior Project Manager Mr. James Gresham, Manager 1776 I Street, NW, Suite 400 Regulatory Compliance and Plant Licensing Washington, DC 20006-3708 Westinghouse Electric Company man@nei.org P.O. Box 355 Pittsburgh, PA 15230-0355 Mr. David J. Modeen greshaja@westinghouse.com Vice President and Chief Nuclear Officer EPRI Ms. Barbara Lewis 1300 W. T. Harris Boulevard Assistant Editor Charlotte, NC 28262-8550 Platts, Principal Editorial Office dmodeen@epri.com 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com 3/8/07
Mr. John Gaertner EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 jgaertner@epri.com Ms. Rosa Yang EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 ryang@epri.com Mr. Kenneth Huffman EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 khuffman@epri.com