|
---|
Category:Letter
MONTHYEARIR 05000413/20230042024-02-0202 February 2024 Integrated Inspection Report 05000413-2023004 and 05000414-2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined IR 05000413/20230012023-05-0505 May 2023 Integrated Inspection Report 05000413/2023001 and 05000414/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 ML23107A2542023-04-14014 April 2023 301 Examination Report Letter and Report (Merged) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20234012023-03-0101 March 2023 Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations IR 05000413/20224032022-11-17017 November 2022 Cyber Security Inspection Report 05000413/2022403 and 05000414/2022403 (Public) ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22319A0942022-11-10010 November 2022 EN 56219 - Flowserve. 10 CFR Part 21 Report 38878-8 Solenoid Valve at Duke, Catawba Flowserve Evaluation 105 IR 05000414/20220032022-10-31031 October 2022 Integrated Inspection Report 05000414/2022003 and 05000414/2022003 IR 05000413/20224022022-10-28028 October 2022 Security Baseline Inspection Report 05000413 2022402 and 05000414 2022402 ML22297A2642022-10-25025 October 2022 Project Manager Assignment ML22276A2492022-10-25025 October 2022 Completion of License Renewal Commitment No. 10, Aging Management of Environmentally Assisted Fatigue ML22303A0052022-10-24024 October 2022 EN 56178 - Tioga Final. LTR-TP-22-29 2021 10CFR Part 21 Improper Notification of NRC ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22303A0042022-08-31031 August 2022 Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Supply of 6 NPS Sch. 40 Seamless Stainless-Steel Pipe; Manufacturer: Maxim Tubes Company Pvt. Ltd.; Heat No: N200309AW01, SR No: 7; 9 Pcs; 180 Feet Total Procured as Unquali IR 05000413/20220052022-08-26026 August 2022 Updated Inspection Plan for Catawba Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000413/2022005 and 05000414/2022005 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) IR 05000413/20220022022-07-29029 July 2022 Integrated Inspection Report 05000413/2022002 and 05000414/2022002 IR 07200045/20220012022-07-26026 July 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200045/2022001 ML22215A2502022-07-25025 July 2022 EN 55960 - Update - Curtiss Wright IR 05000413/20220102022-07-21021 July 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000413/2022010 and 05000414/2022010 ML22195A2432022-07-19019 July 2022 Request for Withholding Information from Public Disclosure Regarding Reactor Vessel Closure Head Repair Alternative ML22164A0362022-07-19019 July 2022 Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public ML22199A2552022-07-0606 July 2022 Ds Catawba 2022 RQ Inspection Notification Letter ML22222A0092022-07-0101 July 2022 EN 55974 - Flowserve, Part 21 Report Re Solenoid Coil Failure of Model 38878-8 Solenoid Valve at Catawba Nuclear Station for Use on FWIV Actuator ML22175A0342022-06-28028 June 2022 Information Request for the Cyber-Security Baseline Inspection Notification to Perform Inspection 05000413/2022403 and 05000414/2022403 ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22111A3572022-05-16016 May 2022 Letter Issuing Exemption to Catawba IR 05000414/20220012022-04-28028 April 2022 Integrated Inspection Report 05000413/ 2022001 and 05000414/2022001 2024-02-02
[Table view] Category:License-Operator Examination Report
MONTHYEARML23116A1972023-04-26026 April 2023 301 2B ML23107A2542023-04-14014 April 2023 301 Examination Report Letter and Report (Merged) IR 05000413/20213012021-11-0808 November 2021 Operator Licensing Examination Report 05000413/2021301 and 05000414/2021301 ML19297E2292019-10-24024 October 2019 301 Exam Report Rev 0 IR 05000413/20153012015-07-13013 July 2015 Er 05000413/2015301, 05000414/2015301, Operating Test May 18 - 21, 2015 & Written Exam May 28, 2015; Catawba Nuclear Station; Operator License Examinations IR 05000413/20133012013-10-0808 October 2013 NRC Operator License Examination Report 05000413/2013301 and 05000414/2013301 ML12221A3912012-08-0606 August 2012 Duke Energy - Response to NRC Regulatory Issue Summary 2012-07 Preparation and Scheduling of Operator Licensing Examinations IR 05000413/20103012011-02-25025 February 2011 Er 05000413-10-301 and 05000414-10-301, on 12/13-17/10 - 12/21/10, Catawba Nuclear Station ML1115405252011-02-0202 February 2011 Initial Exam 2010-301 Final Simulator Scenarios ML1104102982011-02-0202 February 2011 Initial Exam 2010-301 Final SRO Written Exam ML1115700472011-02-0202 February 2011 Initial Exam 2010-301 Final Administrative JPMs ML1115404812011-02-0202 February 2011 Initial Exam 2010-301 Draft Administrative Documents ML1115404892011-02-0202 February 2011 Initial Exam 2010-301 Draft RO Written Exam ML1115404942011-02-0202 February 2011 Initial Exam 2010-301 Draft SRO Written Exam ML1115405092011-02-0202 February 2011 Initial Exam 2010-301 Draft Simulator Scenarios ML1115405152011-02-0202 February 2011 Initial Exam 2010-301 Draft Sim/IN-Plant JPMs ML1115405192011-02-0202 February 2011 Initial Exam 2010-301 Draft Administrative JPMs ML1115405222011-02-0202 February 2011 Initial Exam 2010-301 Final Administrative Documents ML1115700402011-02-0202 February 2011 Initial Exam 2010-301 Final Sim IN-Plant JPMs IR 05000413/20073012008-01-28028 January 2008 Er 05000413-07-301 & Er 05000414-07-301; on 12/03-06/2007 & 12/313/2007; Duke Power Co. Catawba Units 1 & 2, NRC Examination Report ML0734605652007-12-11011 December 2007 Oct 2007-301 Exam Approval Letter ML0711700042007-04-26026 April 2007 Er 05000413-07301, 05000414-07301, on 03/29/2007; Catawba Nuclear Station; Licensed Operator Examinations ML0701702592007-01-17017 January 2007 Operator Retake Initial Examinations - Catawba - 05000413/2007301 and 05000414/2007301 IR 05000413/20053012006-01-11011 January 2006 Er 05000413-05-301, 05000414/05-301; 12/5-12/8/2005 and 12/14/05; Catawba Nuclear Station, Units 1 and 2, Licensed Operator Examination ML0527602732005-09-21021 September 2005 Duke Power - Response to NRC Regulatory Issue Summary 2005-19 Preparation and Scheduling of Operator Licensing Examinations ML0220502652002-07-16016 July 2002 Response to NRC Regulatory Issue Summary 2002-09, Supplement Preparation and Scheduling of Operator Licensing Examinations 2023-04-26
[Table view] |
See also: IR 05000413/2007301
Text
April 26, 2007
Duke Power Company LLC
d/b/a Duke Energy Carolinas, LLC
ATTN: Mr. J. R. Morris
Site Vice President
Catawba Site
4800 Concord Road
York, SC 29745-9635
SUBJECT: CATAWBA NUCLEAR STATION - NRC EXAMINATION
REPORT 05000413/2007301 AND 05000414/2007301
Dear Mr. Morris:
On March 29, 2007, members of your staff administered an NRC Reactor Operator (RO) written
retake examination to one employee of your company who had reapplied for a license to
operate the Catawba Nuclear Station. The NRC waived the operating examination since the
individual passed that portion of the test during the initial examination. The examiner discussed
the examination questions and preliminary findings with those members of your staff identified
in the enclosed report.
One RO applicant passed the written examination. There were no post examination comments.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter
and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this letter, please contact me at (404) 562-4607.
Sincerely,
\\RA\\
Robert C. Haag, Chief
Operations Branch
Division of Reactor Safety
Docket Nos. 50-413, 50-414
License Nos. NPF-35, NPF-52
Enclosure: Report Details
cc w/encl: (See next page)
April 26, 2007
Duke Power Company LLC
d/b/a Duke Energy Carolinas, LLC
ATTN: Mr. J. R. Morris
Site Vice President
Catawba Site
4800 Concord Road
York, SC 29745-9635
SUBJECT: CATAWBA NUCLEAR STATION - NRC EXAMINATION
REPORT 05000413/2007301 AND 05000414/2007301
Dear Mr. Morris:
On March 29, 2007, members of your staff administered an NRC Reactor Operator (RO) written
retake examination to one employee of your company who had reapplied for a license to
operate the Catawba Nuclear Station. The NRC waived the operating examination since the
individual passed that portion of the test during the initial examination. The examiner discussed
the examination questions and preliminary findings with those members of your staff identified
in the enclosed report.
One RO applicant passed the written examination. There were no post examination comments.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter
and its enclosures will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this letter, please contact me at (404) 562-4607.
Sincerely,
\\RA\\
Robert C. Haag, Chief
Operations Branch
Division of Reactor Safety
Docket Nos. 50-413, 50-414
License Nos. NPF-35, NPF-52
Enclosure: Report Details
cc w/encl: (See next page
DPC 2
cc w/encl:
Randy D. Hart Elizabeth McMahon
Regulatory Compliance Manager Assistant Attorney General
Duke Power Company LLC S. C. Attorney General's Office
d/b/a/Duke Energy Carolinas, LLC Electronic Mail Distribution
Electronic Mail Distribution
Vanessa Quinn
Lisa F. Vaughn Federal Emergency Management Agency
Associate General Counsel Electronic Mail Distribution
and Managing Attorney
Duke Energy Corporation North Carolina Electric
526 South Church Street-EC 07H Membership Corporation
Charlotte, NC 28202 Electronic Mail Distribution
Kathryn B. Nolan Peggy Force
Senior Counsel Assistant Attorney General
Duke Energy Corporation N. C. Department of Justice
526 South Church Street-EC 07H Electronic Mail Distribution
Charlotte, NC 28202
County Manager of York County, SC
David A. Repka Electronic Mail Distribution
Winston & Strawn LLP
Electronic Mail Distribution Piedmont Municipal Power Agency
Electronic Mail Distribution
North Carolina MPA-1
Electronic Mail Distribution R. L. Gill, Jr., Manager
Nuclear Regulatory Issues
Henry J. Porter, Asst. Director and Industry Affairs
Div. of Radioactive Waste Mgmt. Duke Power Company LLC
S. C. Department of Health d/b/a Duke Energy Carolinas, LLC
and Environmental Control 526 S. Church Street
Electronic Mail Distribution Charlotte, NC 28201-0006
R. Mike Gandy Duke Energy Corporation
Division of Radioactive Waste Mgmt. ATTN: R. A. Lindsay
S. C. Department of Health and Training Manager
Environmental Control Catawba Nuclear Station
Electronic Mail Distribution 4850 Concord Road
York, SC 29745-9635
_________________________
OFFICE RII:DRS RII:DRS RII:DRP
SIGNATURE RFA RCH JHM2
NAME RAiello BHaag JMoorman
DATE 4/26/2007 4/26/2007 4/26/2007 April 30, 2007 April 30, 2007 April 30, 2007 April 30, 2007
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
DPC 4
NUCLEAR REGULATORY COMMISSION
REGION II
Docket Nos.: 50-413, 50-414,
License Nos.: NPF-35, NPF-52
Report Nos.: 05000413/2007301 and 05000414/2007301
Licensee: Duke Power Company, LLC
Facility: Catawba Nuclear Station
Location: 4830 Concord Rd.
York, SC 29745
Date: Written Examination - March 29, 2007
Examiner: R. Aiello, Chief, Senior Operations Examiner
Approved by: Robert C. Haag, Chief
Operations Branch
Division of Reactor Safety
Enclosure 1
SUMMARY OF FINDINGS
ER 05000413/2007301, 05000414/2007301; 03/29/2007; Catawba Nuclear Station; Licensed
Operator Examinations.
The NRC examiner conducted an operator licensing retake examination in accordance with the
guidance in NUREG-1021, Revision 9, Operator Licensing Examination Standards for Power
Reactors. This examination implemented the operator licensing requirements of 10 CFR
§55.41.
Members of the Catawba Nuclear Station training staff administered the Reactor Operator (RO)
written retake examination on March 29, 2007. The McGuire Nuclear Station developed the
written examination outline which was used for both the McGuire initial examination and the
Catawba retake examination. The Catawba Nuclear Station used a portion of the McGuire
written examination and then modified examination questions and added new questions to
address the subtle differences between the two sites. Since both written examination outlines
and approximately 25% of the examinations were similar, they were administered
simultaneously.
One RO applicant passed the written examination and was issued a license. There were no
post examination comments.
No findings of significance were identified.
Enclosure 1
Report Details
4. OTHER ACTIVITIES
4OA5 Operator Licensing Initial Examinations
a. Inspection Scope
Efforts for the McGuire Nuclear Station initial examination were utilized by the Catawba
Nuclear Station during the developed of the retake written examination. The McGuire
written examination outline was used for the Catawba examination development.
Catawba used the McGuire written examination and modified it as appropriate to
address differences between the two sites. The written examination was developed in
accordance with NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 9. The examiner reviewed the proposed written examination.
Examination changes agreed upon between the NRC and the licensee were made
according to NUREG-1021 and incorporated into the final version of the examination
material.
The examiner reviewed Catawbas examination security measures while preparing the
examination to ensure examination security and integrity complied with 10 CFR 55.49,
Integrity of examinations and tests.
The examiner evaluated one RO applicant who was being assessed under the
guidelines specified in NUREG-1021. Members of the Catawba Nuclear Station training
staff administered the written examination on March 29, 2007. The evaluation of the
applicant and review of documentation were performed to determine if the applicant,
who applied for a license to operate the Catawba Nuclear Station, met the requirements
specified in 10 CFR 55, Operators Licenses.
b. Findings
No findings of significance were identified.
The NRC determined that the licensees submittal was within the range of acceptability
expected for a proposed examination. One RO applicant passed the written
examination.
The RO written examination with answers, may be accessed in the ADAMS system
(ADAMS Accession Number, ML071140431).
4OA6 Meetings
Exit Meeting Summary
On April 23, 2007, the examiner discussed the examination and preliminary findings
with Mr. Brewer, Operations Training Manager, and members of his staff over the
phone. The examiner asked the licensee whether any material reviewed during the
Enclosure 1
2
examination should be considered proprietary. No proprietary information was
identified.
PARTIAL LIST OF PERSONS CONTACTED
Licensee personnel
E. Brewer, Operations Training Manager
J. Suptela, Senior Engineer, Special Projects
NRC personnel
A. Sabisch, Senior Resident Inspector
Enclosure 1