May 7, 2007 Mr. Joseph J. Hagan President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company 76 South Main Street Akron, OH 44308
SUBJECT:
FIRSTENERGY NUCLEAR OPERATING COMPANY, LLC, RESPONSE TO GENERIC LETTER 2006-02 GRID RELIABILITY AND THE IMPACT ON PLANT RISK AND THE OPERABILITY OF OFFSITE POWER (TAC NOS. MD0949, MD0950, MD0973, and MD1016)
Dear Mr. Hagan:
On February 1, 2006, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (Agencywide Document Access and Management System (ADAMS) Accession No. ML060180352) to all holders of operating licenses for nuclear power reactors except those who have permanently ceased operation and have certified that fuel has been removed from the reactor vessel.
GL 2006-02 notified licensees of the NRC staffs need for information in the following four areas:
(1) use of protocols between the nuclear power plant (NPP) and the transmission system operator (TSO), independent system operator (ISO), or reliability coordinator/authority (RC/RA) and the use of transmission load flow analysis tools (analysis tools) by TSOs to assist NPPs in monitoring grid conditions to determine the operability of offsite power systems under plant technical specifications (TSs). (The TSO, ISO, or RC/RA is responsible for preserving the reliability of the local transmission system. In this GL the term TSO is used to denote these entities);
(2) use of NPP/TSO protocols and analysis tools by TSOs to assist NPPs in monitoring grid conditions for consideration in maintenance risk assessments; (3) offsite power restoration procedures in accordance with Section 2 of NRC Regulatory Guide (RG) 1.155, Station Blackout; and (4) losses of offsite power caused by grid failures at a frequency equal to or greater than once in 20 site-years in accordance with RG 1.155.
Subsequent to GL 2006-02, the NRC issued a request for additional information (RAI), (ADAMS Accession No. ML063380308), regarding the resolution of GL 2006-02, to 63 of the 65 holders of operating licenses for nuclear power reactors. The RAI requested that the licensees respond to questions in the following areas:
J. Hagan 2
(1) Switchyard Minimum Voltage; (2) Loss of Real-Time Contingency Analysis (RTCA) Capability; (3) Verification of RTCA Predicted Post-Trip Voltage; (4) Identification of Applicable Single Contingencies; (5) Seasonal Variation in Grid Stress (reliability and loss-of-offsite power probability);
(6) Interface with Transmission System Operator during Extended Plant Maintenance.
By letters dated April 3, 2006 (ADAMS Accession No. ML060970276), and January 31, 2007, (ADAMS Accession No. ML070400250) you responded to the information request of GL 2006-02 and the subsequent RAI, for Beaver Valley Power Station, Units 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1.
Based on the information you provided, the NRC staff has concluded that compliance is being maintained with NRC regulatory requirements governing electric power sources and associated personnel training and considers your responses to GL 2006-02 complete.
If you have any questions, please contact me 301-415-1055.
Sincerely,
/RA/
Christopher Gratton, Sr. Project Manager Plant Licensing Branch 3-2 Division of Operating Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-344, 50-412, 50-346 and 50-440 cc: See next page
ML060970276), and January 31, 2007, (ADAMS Accession No. ML070400250) you responded to the information request of GL 2006-02 and the subsequent RAI, for Beaver Valley Power Station, Units 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1.
Based on the information you provided, the NRC staff has concluded that compliance is being maintained with NRC regulatory requirements governing electric power sources and associated personnel training and considers your responses to GL 2006-02 complete.
If you have any questions, please contact me 301-415-1055.
Sincerely,
/RA/
Christopher Gratton, Sr. Project Manager Plant Licensing Branch 3-2 Division of Operating Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-344, 50-412, 50-346 and 50-440 cc: See next page DISTRIBUTION:
PUBLIC RidsNrrDorlLpl3-2 RidsRgn3MailCenter LPL3-2 R/F RidsNrrDorlLpl1-1 RidsRgn1MailCenter LPL1-1 R/F RidsNrrLASLittle RidsNrrLAEWhitt RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrPMTWengart RidsNrrPMCGratton RidsNrrPM RidsNrrPMNMorgan RidsNrrDorlLpl1-1 JRobinson, NRR RidsNrrDeEeeb ADAMS ACCESSION #: ML071160442 NRR-106 OFFICE LPL3-2/PM LPL3-2/LA NRR/EEEB/BC LPL3-2/BC NAME CGratton EWhitt GWilson RGibbs DATE 5/2/07 5/1/07 5/3/07 5/7/07
Beaver Valley Power Station, Unit Nos. 1 and 2 cc:
Joseph J. Hagan Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-18 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44333 Ohio EPA-DERR ATTN: Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149 James H. Lash Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, Ohio 44333 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-A P.O. Box 4, Route 168 Shippingport, PA 15077 Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 Akron, Ohio 44308 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.
Harrisburg, PA 17110-9364
Beaver Valley Power Station, Unit Nos. 1 and 2 (continued) cc:
Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077 Mr. James H. Lash Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077
Davis-Besse Nuclear Power Station, Unit 1 cc:
Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3065 5501 North State Route 2 Oak Harbor, OH 43449-9760 Director, Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH 43068-9009 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, IL 60532-4352 Resident Inspector U.S. Nuclear Regulatory Commission 5503 North State Route 2 Oak Harbor, OH 43449-9760 Stephen Helmer Supervisor, Technical Support Section Bureau of Radiation Protection Ohio Department of Health 35 East Chestnut Street, 7th Floor Columbus, OH 43215 Carol OClaire, Chief, Radiological Branch Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235-2206 Zack A. Clayton DERR Ohio Environmental Protection Agency P.O. Box 1049 Columbus, OH 43266-0149 State of Ohio Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Attorney General Office of Attorney General 30 East Broad Street Columbus, OH 43216 President, Board of County Commissioners of Ottawa County Port Clinton, OH 43252 President, Board of County Commissioners of Lucas County One Government Center, Suite 800 Toledo, OH 43604-6506 The Honorable Dennis J. Kucinich United States House of Representatives Washington, D.C. 20515 The Honorable Dennis J. Kucinich United States House of Representatives 14400 Detroit Avenue Lakewood, OH 44107 Joseph J. Hagan Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-18 76 South Main Street Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GHE-115 395 Ghent Road Akron, OH 44333
Davis-Besse Nuclear Power Station, Unit 1
cc:
Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GHE-315 395 Ghent Road Akron, OH 44333 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State, Route 2 Oak Harbor, OH 43449-9760 Perry Nuclear Power Plant, Unit 1 cc:
Resident Inspector's Office U.S. Nuclear Regulatory Commission P.O. Box 331 Perry, OH 44081-0331 Sue Hiatt OCRE Interim Representative 8275 Munson Mentor, OH 44060 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Mail Stop A-PY-A210 P.O. Box 97, 10 Center Road Perry, OH 44081-0097 Mayor, Village of North Perry North Perry Village Hall 4449 Lockwood Road North Perry Village, OH 44081 Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH 43068-9009 Mayor, Village of Perry P.O. Box 100 Perry, OH 44081-0100 Chairman Perry Township Board of Trustees 3750 Center Road, Box 65 Perry, OH 44081