I , ORDER FOR SUPPLIES OR SERVICES PAGE OF PAGES IMPORTANT: Mark all packages and papers with contract and/or order numbers.
I. DATE OF ORDER JAN 4 2007 2. CONTRACT NO. (It any)
BPA NO.
- 6. SHIP TO
- 3. ORDER NO MODIFICATION NO. 4. REQUISITION/REFERENCE NO.
T093 a. NAME OP CONSIGNEE NC-03-03-037093 U.S. Nuclear Regulatory Commission
- b. STREET ADDRESS to)
- 5. ISSUING OFFICE (Address correspondence U.S. Nuclear Regulatory Commission Div of Contracts Two White Flint Attn: Nicole North - MS T-7-I-2 A. Pratt, (301) 415-0236 Washington, DC 20555 c. CITY d.STATE e. ZIPCODE Washington
- 7. TO:
DC 20555 I OII1e\hI^
BECKMAN & ASSOCIATES INC
- 8. TYPE OF ORDER C.STREET ADDRESS L a. PURCHASE REFERENCE YOUR Please furnish the following on the I b. DELIVERY Except for billing instructions on the reverse, this delivery order is subject to instructions 1071 STATE ROUTE conditions specified on both sides terms and 136 of this order contained on this side only of this form and is and on the attached sheet, if any, including issued subject to the terms and conditions delivery as indicated.
dl. CITY of the above-numbered contract.
BELLE VERNON Iýe. STATE PA
- 9. ACCOUNTING AND APPROPRIATION DATA 720-15-122-142 J-3020 252A 31X0200.720 Obligate: $191,583.23 Duns: 785915794
- 11. BUSINESS CLASSIFICATION (Check appropriate box(es))
El a. SMALL El b. OTHER THAN SMALL 12 d.WOMEN-OWNED jJe.HUBZone
- 13. PLACE OF
- a. INSPECTION I b. ACCEPTANCE SUPPLIES OR SERVICES (b)
ISSUANCE OF TASK ORDER NO. 093 TITLE: COMPONENT DESIGN BASES INSPECTION (CDB)
AT TMI AND INDIAN POINT 2 ESTIMATED COSTS: $185,267.17 FIXED FEE: $6,316.06 TOTAL ESTIMATED COST AND FEE: $191,583.23 PERIOD OF PERFORMANCE: 01/05/2007 - 03/05/2007 CONTRACTOR SIGNATURE REQUIRED ON PAGE 2 OF 5
- 21. MAILINVOICE TO:
SEE BILLING a. NAME INSTRUCTIONS U.S. Nuclear Regulatory Commission ON* Division of Contracts REVERSE b.STREET ADDRESS (or P.O. Box)
Mail Stop: T-7-I-2 CITY Washi notnn
- 22. UNITED STATES OF AMERICA BY(Signature)
XUTHORIZED FOR LOCAL REPRODUCTION IREVIyf 1NOMABL fi - LM XMI RE VVIEW CoMpLETE OPTIONA(REV. 4/2006)
A MO R "AFAIR 48 CFR 53.213(f)
NRC-03-03-037 Task Order No. 093 Page 2 of 5 In accordance with Section G.5, Task Order Procedures, of contract number NRC-03-03-037, this definitizes Task Order No. 093. The effort shall be performed in accordance with the enclosed Statement of Work.
Task Order No. 093 shall be in effect from 01/05/2007 through 03/05/2007, with a cost ceiling of
$191,583.23. The amount of $185,267.17 represents the estimated reimbursable costs, and the amount of $6,316.06 represents the fixed fee.
The followirgLdividuals are considered to be essential to the successful-grf nrmance for work hereunder: The Contractor agrees--TMU n persomnariiovre removed from the effort undr;M task order without compliance with Contract Clause H.4, Key Personnel.
The issuance of this task order does not amend any terms or conditions of the subject contract.
Your contacts during the course of this task order are:
Technical Matters: Donald P. Norkin Contractual Matters: Nicole A. Pratt Project Officer Contract Specialist (301) 415-2954 (301) 415-0236 Acceptance of Task Order No. 093 should be made by having an official, authorized to bind your organization, execute three copies of this document in the space provided and return two copies to the Contract Specialist. You should retain the third copy for your records.
ACCEPTED: Task Order No. 093 NAME TITLE DATE
STATEMENT OF WORK TO 93, Component Design Bases (CDB) Inspections at TMI, Indian Point 2 B&R NUMBER: 720-15-122-142 JOB CODE: J-3020 NRC PROJECT OFFICER: Donald Norkin, NRR, (301) 415-2954 PERIOD OF PERFORMANCE: January 5, 2007 through March 5, 2007 BACKGROUND As required by the Baseline Inspection portion of the NRC Reactor Oversight Process, CDB inspections will be conducted in accordance with the schedule contained in the attachment to this statement of work. The following inspection procedure will be used:
71111.21," Component Design Bases Inspection" OBJECTIVE The objective of the task order is to obtain expert technical assistance in the Mechanical and Electrical/I&C Systems areas to assist the NRC inspection teams in the performance of the CDB inspections at TMI, Indian Point 2. Contractors may be assigned an NRC inspector to work with during the inspection in a developmental role. The specialists shall have a design background (such as from an architect-engineer firm) and experience/knowledge regarding:
(1) design, analysis, operations, installation, modification, maintenance and testing of nuclear plant safety systems.
(2) reviewing design basis and detailed design (calculations, drawings, etc.) of nuclear plant safety systems; and (3) NRC regulations and risk informed inspection methodology WORK REQUIREMENTS AND SCHEDULE It shall be the responsibility of the contractor to assign qualified technical staff, employees, and subcontractors, who have the required educational background, experience, or combination thereof, to meet both the technical and regulatory objectives of the work specified in this Statement of Work (SOW). The NRC will rely on representation made by the contractor concerning the qualifications of the personnel proposed for assignment to this task order including assurance that all information contained in the technical and cost proposals, including resumes and conflict of interest disclosures, is accurate and truthful.
The NRC Team Leader may issue technical direction from time to time during the duration of the task order. Technical direction must be within the general Statement of Work stated in the task order, and shall not constitute new assignments of work or changes of such nature as to justify an adjustment in cost or period of performance. The contractor shall refer to the basic contract for further information and guidance on any technical directions issued under this task order.
Any modifications to the scope of work, cost, or period of performance of the task order must be issued by the Contracting Officer and will be coordinated with the Project Officer. Specific tasks:
for each individual and the estimated level of effort:
Week Activity 1 On-site preparation/sample selection (30 - 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />) 2 Inspection preparation at home office (unused portion of above 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />) 3 On-site inspection (50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br />) 4 Home office preparation/inspection (40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />) 5 On-site inspection (50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br />) 6 On-site inspection (50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br />) 7 Documentation of inspection results. (20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />)
The above activities shall be performed in accordance with the attached schedule which indicates the start of the first and last week. For Regions I and IV use above 7 week cycle. For Regions II and Ill, use 8 week cycle which has an additional home office preparation/inspection week between the last two on-site inspection weeks. Both have a total of 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> for home office preparation/inspection. At team leader discretion, skip Week 1 and use 44 hours5.092593e-4 days <br />0.0122 hours <br />7.275132e-5 weeks <br />1.6742e-5 months <br /> for Week 2 inspection preparation at region.
REPORT REQUIREMENTS Contractors shall provide inspection plans and inspection related documentation, as directed by the Team Leader.
Feeder to final inspection report shall be provided in Word Perfect and in an electronic format acceptable to the Team Leader. A hard copy shall be provided to the Project Officer. The contractor shall not undertake any further efforts toward report finalization, such as management review of the feeder report.
TRAVEL (for estimating purposes only) for each individual:
One 3-4 day trip to the plant site, or one 5 day trip to region (team leader discretion)
Three 5 day trips to the plant site TMI is located 10 miles Southeast of Harrisburg, PA.
Indian Point 2 is located 24 miles North of New York City, NY.
4
Contractor shall coordinate all travel arrangements in advance with the Team Leader. Off-normal travel time may be required to ensure timely arrival at the site, as scheduled by Team Leader.
NRC FURNISHED MATERIAL Documents required to prepare for the inspection will be provided by Team Leaders.
OTHER APPLICABLE INFORMATION The work specified in this SOW is 100% licensee fee recoverable. The contractor shall provide fee recovery information in the monthly progress reports in accordance with the requirements of the basic contract.
5