ML071080045

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Emergency Amendment 257 Regarding One-Time Extension of Diesel Allowed Outage Time (TS-460-T)
ML071080045
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 04/06/2007
From:
NRC/NRR/ADRO/DORL/LPLII-2
To:
Brown E, NRR/DORL, 415-2315
Shared Package
ML071070302 List:
References
TAC MD5148
Download: ML071080045 (2)


Text

(3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or equipment and instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70, to possess but not separate, such byproduct, and special nuclear materials as may be produced by the operation of the facility.

C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I:

Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 3458 megawatts thermal.

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 257, except for Amendment No. 248, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

For Surveillance Requirements (SRs) that are new in Amendment 212 to Facility Operating License DPR-68, the first performance is due at the end of the first surveillance interval that begins at implementation of the Amendment 212. For SRs that existed prior to Amendment 212, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the surveillance was last performed prior to implementation of Amendment 212.

BFN-UNIT 3 Renewed License No. DPR-68 Amendment No. 257

AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.2 Declare required 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br /> from feature(s), supported by discovery of the inoperable Unit 3 DG, Condition B inoperable when the concurrent with redundant required inoperability of feature(s) are inoperable. redundant required feature(s)

AND B.3.1 Determine OPERABLE 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> Unit 3 DG(s) are not inoperable due to common cause failure.

OR B.3.2 Perform SR 3.8.1.1 for 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> OPERABLE Unit 3 DG(s).

AND B.4 Restore Unit 3 DG to 7 days(a)

OPERABLE status.

AND 14 days from discovery of failure to meet LCO (continued)

(a)This 7-day Completion Time, which was entered on April 1, 2007, at 0815 hours33.958 days <br />4.851 weeks <br />1.116 months <br />, may be extended an additional 7 days to complete repair and testing of DG 3D. Unit 1 shall be maintained in a shutdown condition during this extended time interval.

BFN-UNIT 3 3.8-3 3Amendment No. 212, 218, 256:, 257