Completion of Pre-application Review of Main Steam and Feedwater Isolation System Controls Replacement
ML071060275
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/25/2007
From: Donohew J
NRC/NRR/ADRO/DORL/LPLIV
To: Muench R
Wolf Creek
Donohew J N, NRR/DLPM,415-1307
References
TAC MD3209, TAC MD3561
Download: ML071060275 (4)


Text

April 25, 2007 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation Post Office Box 411 Burlington, KS 66839

SUBJECT:

WOLF CREEK GENERATING STATION - COMPLETION OF PRE-APPLICATION REVIEW OF MAIN STEAM AND FEEDWATER ISOLATION SYSTEM CONTROLS REPLACEMENT (TAC NOS. MD3209 AND MD3561)

Dear Mr. Muench:

By letter dated August 2, 2006 (ET 06-0032), the Wolf Creek Nuclear Operating Corporation (the licensee) requested a pre-application review of the plans to replace the main steam and feedwater isolation system (MSFIS) controls during the refueling outage scheduled for the spring of 2008. In that letter, it was mentioned that your staff met with the Nuclear Regulatory Commission (NRC) staff on June 28, 2006, regarding these plans to submit a license amendment request (LAR) to use field programmable gate array (FPGA) technology in the replacement MSFIS controls at Wolf Creek Generating Station. The NRC meeting summary was issued July 12, 2006. The NRC staff issued the fee bearing TAC MD3209 for this pre-application review.

Since this application of FPGA technology would be unique at this time, being the first application of the technology at a nuclear power plant in the United States, the licensee also requested that the NRC approve a fee exemption for that portion of the NRC amendment review that would have value to the NRC developing generic review guidance on the application of this technology at nuclear power plants. In response to this request, the NRC issued a partial fee exemption in its letter dated November 6, 2006, and assigned the non-fee bearing TAC MD3561 for this review.

Since the letter of August 2, 2006, your staff and the NRC staff have had several discussions in conference calls, which have lead up to your LAR application that was submitted to the NRC on March 14, 2007 (ET 07-0004). The following fee bearing TAC numbers were assigned for the review of this application: (1) MD4839, review of the MSFIS digital upgrade, (2) MD4840, review of the changes to Technical Specifications (TSs) for the replacement of the main steam isolation valves (MSIVs) and main feedwater isolation valves (MFIVs), and (3) MD5266, review of the TS changes associated with Technical Specification Task Force (TSTF) traveler 491 (TSTF-491), Revision 2, Removal of Main Steam and Feedwater Valve Isolation Times.

At this time, the NRC staff is reviewing the LAR submittal to determine if sufficient information has been provided to allow the NRC to begin its review. Because the LAR has been submitted, the pre-application review has been completed and, therefore, this letter closes out the fee

R. A. Muench bearing TAC MD3209 for the pre-application review. The non-fee bearing TAC MD3561 will continue until the review on the LAR submittal dated March 14, 2007, is completed with respect to the MSFIS digital upgrade.

Sincerely,

/RA/

Jack Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-482 cc: See next page

R. A. Muench bearing TAC MD3209 for the pre-application review. The non-fee bearing TAC MD3561 will continue until the review on the LAR submittal dated March 14, 2007, is completed with respect to the MSFIS digital upgrade.

Sincerely,

/RA/

Jack Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-482 cc: See next page DISTRIBUTION PUBLIC LPLIV r/f RidsNrrDorl RidsNrrDorlLpl4 RidsNrrPMJDonohew RidsOgcRp RidsNrrLALFeizollahi RidsAcrsAcnwMailCenter RidsRgn4MailCenter ACCESSION NO.: ML071060275 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME JDonohew LFeizollahi THiltz DATE 4/24/07 4/24/07 4/24/07 OFFICIAL RECORD COPY

February 2006 Wolf Creek Generating Station cc:

Jay Silberg, Esq.

Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, D.C. 20037 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 311 Burlington, KS 66839 Chief Engineer, Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS 66604-4027 Office of the Governor State of Kansas Topeka, KS 66612 Attorney General 120 S.W. 10th Avenue, 2nd Floor Topeka, KS 66612-1597 County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS 66839 Chief, Radiation and Asbestos Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366 Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Supervisor Licensing Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 U.S. Nuclear Regulatory Commission Resident Inspectors Office/Callaway Plant 8201 NRC Road Steedman, MO 65077-1032