Letter Sequence Response to RAI |
---|
|
|
MONTHYEARML0710201562007-04-10010 April 2007 RAI for the Third Year Interval, Request for Relief Nos. RR-46 Through RR-50, RR-52 Through RR-57 and RR-61 (TAC Nos. MD2592, MD2593, MD2594, MD2595, MD2596, MD2598, MD2699, MD2602, MD2603, MD2604, MD2605, MD2606, MD2607.. Project stage: RAI NL-07-0802, Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests2007-04-13013 April 2007 Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests Project stage: Response to RAI NL-07-1082, Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests2007-05-30030 May 2007 Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests Project stage: Response to RAI ML0718300102007-07-20020 July 2007 Evaluation of Third 10-Year Interval Inservice Inspection Program Plan Request for Relief Nos. RR-46, RR-47, RR-48, RR-49, RR-50, RR-52, RR-53, RR-54, RR-55, RR-56, RR-57, and RR-61 (Tac Nos. MD2592.. Project stage: Other 2007-04-13
[Table View] |
Similar Documents at Hatch |
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARNL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-22-0365, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R302022-05-31031 May 2022 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R30 NL-21-0905, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R292022-01-26026 January 2022 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R29 NL-19-1491, Update to the Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval2019-12-0909 December 2019 Update to the Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval NL-19-0726, Inservice Inspection Program Owner'S Activity Report for Outage 2R252019-06-17017 June 2019 Inservice Inspection Program Owner'S Activity Report for Outage 2R25 NL-19-0317, Submittal of Fifth Ten-Year Interval Lnservice Testing Program Update2019-04-0202 April 2019 Submittal of Fifth Ten-Year Interval Lnservice Testing Program Update NL-17-1194, Submittal of Response to Request for Information Fourth Interval Relief Requests RR-13, RR-14, RR-18, RR19, RR-23, and RR-242017-07-10010 July 2017 Submittal of Response to Request for Information Fourth Interval Relief Requests RR-13, RR-14, RR-18, RR19, RR-23, and RR-24 NL-17-0951, Inservice Inspection Program, Owner'S Activity Report for Outage 2R242017-05-30030 May 2017 Inservice Inspection Program, Owner'S Activity Report for Outage 2R24 NL-16-2707, Units 1 and 2; Fourth 10-year Interval In-service Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements (NL-16-2707)2016-12-27027 December 2016 Units 1 and 2; Fourth 10-year Interval In-service Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements (NL-16-2707) ND-16-1437, Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval2016-08-24024 August 2016 Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval NL-16-0795, Inservice Inspection Program - Owner'S Activity Report for Outage IR272016-06-0101 June 2016 Inservice Inspection Program - Owner'S Activity Report for Outage IR27 NL-16-0421, Full Structural Weld Overlays on Reactor Recirculation and Residual Heat Removal Systems, Nondestructive Examination Results - Spring 2016 Outage (1R27)2016-03-17017 March 2016 Full Structural Weld Overlays on Reactor Recirculation and Residual Heat Removal Systems, Nondestructive Examination Results - Spring 2016 Outage (1R27) NL-15-1096, Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval2015-06-18018 June 2015 Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval NL-15-1032, E. I. Hatch, Unit 2 - Inservice Inspection Program Owner'S Activity Report for Outage 2R232015-06-12012 June 2015 E. I. Hatch, Unit 2 - Inservice Inspection Program Owner'S Activity Report for Outage 2R23 NL-15-0784, Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval2015-05-0404 May 2015 Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval NL-14-1821, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 - Supplemental Information2014-11-13013 November 2014 Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 - Supplemental Information NL-14-1276, Snubber Inspection Plan Submittal in Accordance with ASME OM Code2014-10-31031 October 2014 Snubber Inspection Plan Submittal in Accordance with ASME OM Code NL-14-1250, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.02014-09-19019 September 2014 Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 NL-14-0840, Lnservice Inspection Program Owner'S Activity Report for Outage 1R262014-06-0303 June 2014 Lnservice Inspection Program Owner'S Activity Report for Outage 1R26 NL-14-0231, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 1.02014-03-0606 March 2014 Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 1.0 NL-12-1266, Inservice Inspection Program, Owner'S Activity Report for Outage 1R252012-06-14014 June 2012 Inservice Inspection Program, Owner'S Activity Report for Outage 1R25 NL-10-0989, Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Requests2010-07-0808 July 2010 Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Requests NL-10-1023, Inservice Inspection Program, Owner'S Activity Report for Outage 1R242010-06-11011 June 2010 Inservice Inspection Program, Owner'S Activity Report for Outage 1R24 NL-08-1798, Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Request RR-012008-12-19019 December 2008 Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Request RR-01 NL-08-0901, Unit 1, Inservice Inspection Program Owner'S Activity Report for Outage 1R23 and Structural Integrity Design Report for the N9 CRD Nozzle-to-Cap Full Structural Weld Overlay2008-06-13013 June 2008 Unit 1, Inservice Inspection Program Owner'S Activity Report for Outage 1R23 and Structural Integrity Design Report for the N9 CRD Nozzle-to-Cap Full Structural Weld Overlay NL-07-0987, Fourth Interval Inspection (ISI) Plan Correction2007-05-0909 May 2007 Fourth Interval Inspection (ISI) Plan Correction NL-07-0802, Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests2007-04-13013 April 2007 Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests ML0704300922006-11-20020 November 2006 E. I. Hatch, Unit 2, Volume 1, Revision 2, Introduction Fourth Ten-Year Examination Plan. ML0704301002006-11-20020 November 2006 E. I. Hatch, Unit 2, Volume 3, Revision 1.0, Class 1, 2 and 3 Figures Fourth Ten-Year Inservice Inspection Plan. ML0704300942006-11-20020 November 2006 E. I. Hatch, Unit 2, Volume 2, Revision 1, Class 1, 2 and 3 Components Fourth Ten-Year Examination Plan. ML0704301012006-08-10010 August 2006 E. I. Hatch, Unit 2, Version 1.0, Pressure Test Section Fourth Ten-Year Examination Plan. NL-06-1358, Inservice Inspection Program, Owner'S Activity Report for Outage 1R222006-06-29029 June 2006 Inservice Inspection Program, Owner'S Activity Report for Outage 1R22 ML0704300812006-02-0606 February 2006 E. I. Hatch, Unit 1, Volume 1, Revision 1, Introduction Fourth Ten-Year Inservice Inspection Plan. ML0704300832006-02-0606 February 2006 E. I. Hatch, Unit 1, Volume 2, Revision 1, Class 1, 2 and 3 Components Fourth Ten-Year Inservice Inspection Plan. ML0704300872006-02-0606 February 2006 E. I. Hatch, Unit 1, Volume 3, Revision 1, Class 1, 2 and 3 Figures, Fourth Ten-Year Inservice Inspection Plan. ML0704300962005-08-31031 August 2005 E. I. Hatch, Unit 1, Version 1.0, Pressure Test Section Fourth Ten-Year Examination Plan. NL-05-1190, Fourth 10-Year Interval Inservice Testing (Ist)Program Updates Submittal for Edwin I. Hatch Nuclear Plant2005-07-11011 July 2005 Fourth 10-Year Interval Inservice Testing (Ist)Program Updates Submittal for Edwin I. Hatch Nuclear Plant ML0516403852005-06-0707 June 2005 Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report NL-04-0813, Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report2004-06-0707 June 2004 Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report NL-04-0478, Third 10-Year Interval Inservice Inspection Program Submittal of Relief Requests (RR) RR-38, RR-39, and RR-402004-03-29029 March 2004 Third 10-Year Interval Inservice Inspection Program Submittal of Relief Requests (RR) RR-38, RR-39, and RR-40 NL-03-1380, Third 10-Year Interval Inservice Testing Program, Submittal of Relief Requests RR-V-182003-07-11011 July 2003 Third 10-Year Interval Inservice Testing Program, Submittal of Relief Requests RR-V-18 ML0230903562002-11-0101 November 2002 Third 10-Year Interval Inservice Inspection (ISI) Program, Revision of Relief Request RR-11 ML0228200262002-10-0404 October 2002 Third 10-Year Interval Inservice Inspection Program, Response to Request for Additional Information (RAI) ML0226604362002-09-17017 September 2002 Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report 2024-07-09
[Table view] Category:Letter type:NL
MONTHYEARNL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 NL-24-0067, 10 CFR 72.48(d)(2) Biennial Report2024-02-26026 February 2024 10 CFR 72.48(d)(2) Biennial Report NL-24-0051, License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-02-20020 February 2024 License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 NL-23-0069, Correction of Technical Specification Omission and Typographical Error2023-01-20020 January 2023 Correction of Technical Specification Omission and Typographical Error NL-23-0003, Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 12023-01-20020 January 2023 Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1 2024-09-09
[Table view] |
Text
Southern Nuclear Operating Company, Inc.
Post Off ice Box 1295 Birmingham, Alabama 35201-1295 Tel 205.992.5000 A p r i l 13, 2007 Energy to Serve Your W o r l d S M Docket Nos.: 50-321 50-366 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-000 1 Edwin I. Hatch Nuclear Plant Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Recluests Ladies and Gentlemen:
On July 10,2006, Southern Nuclear Operating Company (SNC) submitted relief requests for the Edwin I. Hatch Nuclear Plant - Units 1 and 2, Third 10-Year Interval IS1 Program.
By facsimile letter on February 5,2007, the NRC requested additional information concerning these relief requests.
The enclosures to this letter contain the SNC response to the referenced NRC Request for Additional Information (RAI).
This letter contains no NRC commitments. If you have any questions, please advise.
Sincerely, Manager, Nuclear Licensing
Enclosures:
- 1. SNC Response to Request for Additional Information
- 2. Figures
- 3. Revised Relief Request RR-5 1
- 4. Synopsis of Leak Detection and Radiation Monitoring
U. S. Nuclear Regulatory Commission NL-07-0802 Page 2 cc: Southern Nuclear ODerating Comvany Mr. J. T. Gasser, Executive Vice President Mr. D. H. Jones, Vice President - Engineering Mr. D. R. Madison, Vice President - Hatch RTYPE: CHA02.004 U. S. Nuclear Regulatory Commission Dr. W. D. Travers, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Hatch Mr. D. S. Sirnpkins, Senior Resident Inspector - Hatch
Enclosure I Edwin I. Hatch Nuclear Plant Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests SNC Response to NRC Request for Additional Information
HATCH NUCLEAR PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION TMRD INTERVAL RELIEF REQUESTS NRC Reauest Pertaining to RR-42 and RR-43 For RR-42 the licensee requested relief from the volumetric examination requirements in ASME Code,Section XI, Category B-A, Item B1.21 and Item B1.22 for Hatch, Unit 1 reactor pressure vessel (RPV) bottom head meridional welds BHD-A thru F and circumferential weld C.
For RR-43 the licensee requested relief from the volumetric examination requirements in ASME Code,Section XI, Category B-A, Item B1.21 and Item B1.22 for Hatch, Unit 2 RPV bottom head dome meridional welds ZBHD-A through D and bottom head torus meridional welds 2BHT-A through G.
The ASME Code,Section XI, Table IWB-2500-1, Category B-A, Item B1.21 and Bl.22 requires a volumetric examination of essentially 100% of the accessible length of all welds on the subject RPV bottom head.
According to the information provided by the licensee in its letter dated July 10,2006, the licensee was unable to obtain any volumetric coverage on Hatch, Unit 1RPV bottom head dome meridional welds 2BHD-A through D and circumferential weld C due to the RPV support skirt causing the subject welds to be inaccessible for examination. For Hatch, Unit 1,the licensee examined bottom head meridional welds BHT-A, BHT-B, BHT-C, BHT-D, BHT-E, BHT-F, BHT-G, and BHT-H, and bottom head circumferential weld C-7 in 2006 and the licensee obtained 100% coverage for each weld. The licensee detected no indications during these examinations.
For Hatch, Unit 2, the licensee found the examinations to be limited for bottom head dome meridional welds 2BHD-A through D and bottom head torus meridional welds 2BHT-A through G due to the control rod drives that penetrate the bottom head near the welds and the RPV support skirt interfering with the examinations. The licensee obtained 27% to 28% of the length of welds bottom head dome meridional welds 2BHD-A through D. In addition the licensee obtained 88%of the length of each weld for the bottom head torus meridional welds 2BHT-A through G. The licensee detected no indications during these examinations.
For this particular ASME Code,Section XI, Examination Category B-A and Item Numbers B121 and B1.22, the ASME Code specifically states examination is of the accessible weld length. Therefore, the licensee may want to consider reassessing the ASME Code requirements in that if the licensee actually obtained essentially 100% of the accessible weld length relief may not be required.
SNC Reswnse RR-42and RR-43are withdrawn because the accessible length of the welds was examined.
HATCH NUCLEAR PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS NRC Reauest pertain in^ to RR-44 The licensee requested relief from volumetric examination requirements in ASME Code,Section XI, Table IWB-2500,Category B-D, Item B3.90 for nozzle-to-vessel welds listed in the licensee's Tables RR-44-1 and RR-44-2 for Hatch ,Units 1and 2 respectively.
- 1. Provide drawings or sketches of the ASME Code,Section XI, Category B-D components listed in Tables RR-44-1 and RR-44-2 for Hatch, Units 1and 2 respectively. Drawings or sketches of every component are not required. An example of one each type of similar components will satisfy this request.
- 2. For the nozzles listed in Tables RR-44-1 and RR-44-2, identify which nozzle belongs to which vessel.
- 3. Clarify if the examinations of the nozzles listed in Tables RR-44-1 and RR-44-2 were performed from the inside or the outside of the nozzles.
- 4. Clarify which ASME Code Edition and Addenda were used regarding the Performance Demonstration Initiative (PDI) examination techniques.
- 5. Describe the plant's leakage and radiation monitor systems with regard identifying leakage from the subject welds. Also, describe when VT-2 visual examinations were last performed on the subject welds.
SNC Reswnse
- 1. Figures 1,2,3,4,5,6,7, and 8 are provided in Enclosure 2.
- 2. Table RR-44-1 is for Unit 1 (weld numbers are prefixed by 1B11) and Table RR-44-2 is for Unit 2 (weld numbers prefixed by 2B11).
- 3. The examinations were performed from outside the nozzles.
- 4. ASME Section XI, Supplement 7, Qualification Requirementsfor Nozzle-to-Vessel Welds, was implemented on November 22,2002, as required by 10 CFR 50.55a(g)(6)(ii)(C).
Examinations performed at Hatch after the implementation of Supplement 7 were performed in Spring 2005 and Spring 2006; therefore, the 2001 Edition of Section XI was used regarding the Performance Demonstration Initiative (PDI) examination techniques.
- 5. The leakage and radiation monitoring systems for identifying leakage from these welds, which are located in the drywell, are discussed in Enclosure 4. VT-2 visual examinations are performed as part of the leakage test conducted each refueling outage.
HATCH NUCLEAR PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS The licensee requested relief from the surface examination requirements in ASME Code,Section XI, Code Case N-509, Category B-K, Item B1O.10 for Hatch, Unit 2 RPV stabilizer brackets SB1 through SB6.
Provide drawings of the RPV stabilizers.
SNC Res~onse Figure 1 1 is provided in Enclosure 2.
HATCHNUCLEARPLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS NRC Request Pertaining to RR-51 The licensee requested relief from volumetric examination requirements in ASME Code,Section XI, IWB-2500-1, Category B-A, Item B1.12 for RPV longitudinal welds, shown in the licensee's Table RR-51-1 for Hatch, Unit 1.
- 1. Provide drawings or sketches of the ASME Code,Section XI, Category B-A, Item B1.12 components listed in Table RR-51-1for Hatch, Unit 1.
- 2. Describe the plant's leakage and radiation monitor systems with regard identifying leakage from the subject welds. Also, describe when VT-2 visual examinations were last performed on the subject welds.
- 3. For weld C-4-B, has the licensee considered VT-1 visual examination by remote camera or any other type of visual examinations of the subject weld as an alternative to the ASME Code volumetric examinations if they can not be performed in the February 2008?
- 4. Has the licensee considered examining weld C-4-B from the inside of the RPV if at any time there is a core off load and dismantling of internal components for Hatch, Unit I?
- 5. In RR-51 the licensee erroneously stated that the ASME Code requirements for ASME Code,Section XI, Table IWB-2500-1, Examination Category B-A, Item B1.12 requires that 100% of the accessible length of each weld be examined. Note 2 of the ASME Code,Section XI Table IWB-2500-1, Examination Category B-A, Item B1.12 requires that essentially 100% of the weld length is to be examined, not the accessible length.
Please correct this error in RR-51.
SNC Response
- 1. Figure 1 is provided in Enclosure 2.
- 2. See the response to question 5 in RR-44.
- 3. SNC has requested the vendor to develop tooling to perform an ultrasonic examination of C-4-B. In the unlikely event that the ultrasonic examination cannot be performed, a VT-1 examination will be performed to the extent practical.
- 4. The obstructing tie rod would only be removed if there was an issue with the tie rod discovered during the outage in-vessel examinations. Since discovery would be during the outage, there would be insufficient time to obtain automated scanning equipment to examine C-4-B.
- 5. RR-5 1 was revised to comply with this request and is resubmitted in Enclosure 3.
HATCH NUCLEAR PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS NRC Reauest pertain in^ to RR-58, RR-59, RR-60, and RR-62
- 1. Provide drawings or sketches of the RHR heat exchangers welds for Hatch, Units 1 and 2.
- 2. Identify the materials (both base material and weld material) by material specification associated with the welds in these RRs. Discuss how the materials properties andlor nozzle geometry hindered the volumetric examinations.
- 3. Describe the plant's leakage and radiation monitor systems with respect to identifying leakage from the welds. Also, describe when VT-2 visual examinations were last performed on the subject welds.
- 4. For ASME Code,Section XI, Category C-B, Item Number C2.21 where both a volumetric and surface examination are required, please provide the coverage obtained for the surface examinations.
- 1. Figures 9 and 10 are provided in Enclosure 2.
- 2. Material Properties - The RHR Heat Exchanger shell and head were fabricated from SA-516 material. The inlet and outlet nozzles were fabricated from SA-541, Class I1 material. The weld metal is not shown on the outline drawings and associated Bill of Materials. These materials did not have an appreciable effect on the examination. Nozzle Geometry - As shown in the figures in Enclosure 2, examinations are limited by the geometry.
- 3. The plant's leakage and radiation monitor systems with regard to identifying leakage from the RHR heat exchanger welds is discussed in Enclosure 4. VT-2 visual examinations are performed as part of the leakage test conducted each period.
- 4. The surface examination coverage for Category C-B was 100%.
Enclosure 2 Edwin I. Hatch Nuclear Plant Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests Figures
HATCHNUCLEARPLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS The following figures were copied from the latest examination sketches for the reactor vessels and the RHR heat exchangers. Even though a weld in a figure may have a specific identifier, the figures should be considered as generic for similar components for defining limitations.
FIGURE DESCRIPTION NUMBER 1 FIGURE 1 1 HNP-1 Reactor Pressure Vessel Welds 1 FIGURE 2 / HNP-2 Reactor Pressure Vessel Welds
/ FIGURE 3 ( Coverage looking for circumferential flaws in a typical large diameter flange type nozzle. I 1
FIGURE 4 I Coverage looking for axial flaws in a typical large diameter flange type nozzle.
1 FIGURE 5 1 Impact of the insulation support ring on the recirculation system outlet nozzles Coverage looking for circumferential flaws in a typical medium diameter barrel type FIGURE 6 nozzle I FIGURE 7 I Coverage looking f i r axial flawsin a typicalmedium diameter barrel type nozzle FIGURE 8 Impact of the insulation support ring on the recirculation system inlet nozzles FIGURE 9 HNP- 1 RHR Heat Exchanger FIGURE 10 HNP-2 RHR Heat Exchanger
/ FIGURE L 1 I HNP-2 Stabilizer Brackets
HATCH NUCLEAR PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS FIGURE 1 HNP-1 REACTOR PRESSURE VESSEL 0-I 'P'
HATCH NUCLEAR PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS FIGURE 2 HNP-2 REACTOR PRESSURE VESSEL
HATCH NUCLEAR PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS FIGURE 3 TYPICAL LARGE DIAMETER FLANGE TYPE NOZZLE COVERAGE LOOKING FOR CIRCUMFERENTIAL FLAWS
HATCH NUCLEAR PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS FIGURE 4 TYPICAL LARGE DIAMETER FLANGE TYPE NOZZLE COVERAGE LOOKING FOR AXIAL FLAWS
HATCH NUCLEAR PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS FIGURE 5 TYPICAL COVERAGE RESTRICTION FOR RECIRCULATION OUTLET NOZZLES DUE TO THE INSULATION SUPPORT RING Restricted Area Insulation support ring 242.8" az.
Area
HATCH NUCLEAR PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS FIGURE 6 TYPICAL MEDIUM DIAMETER BARREL TYPE NOZZLE COVERAGE LOOKING FOR CIRCUMFERENTIALFLAWS
HATCH NUCLEAR PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS FIGURE 7 TYPICAL MEDIUM DIAMETER BARREL TYPE NOZZLE COVERAGE LOOKING FOR AXIAL FLAWS
HATCH NUCLEAR PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS FIGURE 8 TYPICAL COVERAGE RESTRICTION FOR RECIRCULATION INLET NOZZLES DUE TO THE INSULATION SUPPORT RING Insulation support ring 214.6" az. 327.2"az.
Area scanned
HATCH NUCLEAR PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS FIGURE 9 HNP-1RHR HEAT EXCHANGER
HATCHNUCLEARPLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS FIGURE 10 HNP-2 RHR HEAT EXCHANGER FLOW SECTION A-A 16' X 20' REDUCER I O' (SOUTH) 2Ell-2RHR-20A-HXI-1 PLATFORM 2HX-A-2s-1 lHZU EL 118'- 10 1/2' AT 0'. 90'. 180'. AND 270 RHRSV TO F002A SEE C-8 FROM F014A 2HX-A-3s-1 THRU 4 REFERENCE 2Ell-2RHR-20A-HXO-1 S-257W SEE B-27 LOCATION NORTMAST DIAGONAL NOTES
- 1. FOR VELD SPECIFICATIGNS
'A' LWP SEE FIGURE P I C . 111
HATCH NUCLEAR PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS FIGURE 11 HNP-2STABILIZER BRACKETS VESSEL I
180' PLAN MEW STABILIZLR 4RACM7 MCA 5 E C r I O N 'A-A' I
Enclosure 3 Edwin I. Hatch Nuclear Plant Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests Revised Relief Request RR-51
HATCHNUCLEARPLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS RELIEF REOUEST RR-51 Plant Site-Unit: Edwin I. Hatch Nuclear Plant-Unit 1.
Interval-Interval 3rd IS1 Interval-January 1, 1996 through December 3 1,2005.
Dates:
Requested Date Approval is requested by December 3 1,2006 to close-out 3'* Interval for Approval activities.
and Basis ASME Code Class 1, ASME Section XI Category B-A, Item B1.12 reactor pressure Components vessel (RPV) longitudinal welds, as shown in Table RR-51-1.
Affected:
Applicable Code ASME Section XI, 1989 Edition with no addenda.
Edition and Addenda:
Applicable Code Table IWB-2500- 1, Examination Category B-A, Item B 1.12 requires that Requirements: 100% of the length of each weld be examined. Per Code Case N-460, I coverage greater than 90% is acceptable.
Impracticality of As shown in Table RR-5 1- 1, coverage could not be obtained for seven Compliance: welds. Appreciably increasing coverage was impractical due to the interferences described in Table RR-5 1- 1.
Burden Caused Obtaining more coverage would require replacement of the RPV or the by Compliance: design of a new automated examination tool.
Proposed 10 CFR 50.55a(g)(6)(ii)(A)(2) required that licensees augment their reactor Alternative and pressure vessel examination by implementing once, as part of the inservice Basis for Use: inspection interval in effect on September 8, 1992, the examination requirements for reactor vessel shell welds specified in Item B 1.10 of Examination Category B-A, "Pressure Retaining Welds in Reactor Vessel,"
in Table IWB-2500-1 of subsection IWB of the 1989 Edition of Section XI.
Per 10 CFR 50.55a(g)(6)(ii) (A)(3) licensees with fewer than 40 months remaining in the inservice inspection interval in effect on September 8, 1992 could defer the augmented reactor vessel examination to the first period of the next inspection interval. HNP-1, met this criteria; therefore, the augmented examinations were deferred until the 1st period of the 3rd interval. Additionally, as allowed, the augmented examination was used as
HATCH NUCLEAR PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS a substitute for the reactor vessel shell weld examinations normally scheduled for the 31d inspection interval.
Examination coverage was reported by letters dated January 19, 1999 and February 5, 1999. Pursuant to 10 CFR 50.55a(g)(6)(ii)(A)(5)the NRC granted approval by letter from Herbert N. Berkow to H. L. Sumner, Jr.
dated March 11, 1999 with the caveat that weld C-4-B be examined if the obstructing tie rod is removed or if technology became available for examination with the tie rod in place. The NRC concluded that the proposed alternative provided an acceptable level of quality and safety.
(SNC will attempt to examine behind C-4-B during the examinations scheduled for February 2008 if equipment allows). Sufficient coverage was obtained during the examinations to assure the structural integrity of the welds. Therefore, relief should be granted per 10 CFR 50.55a(g)(6)(i).
Duration of The proposed relief request is applicable for the 3d Interval.
Proposed Relief Request:
Precedents: March 11, 1999 NRC Safety Evaluation for augmented RPV examinations.
References:
None Status: Awaiting NRC approval.
HATCH NUCLEAR PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION THIRD INTERVAL RELIEF REQUESTS TABLE RR-51-1 Weld Number Coverage Basis for Limited Coverage
, C-2-A 78% OD examination. Proximity of insulation support ring.
C-3-A 45% ID Examination. Proximity of a specimen bracket and jet pump r
riser braces.
C-3-B 79% ID Examination. Proximity of jet pump riser braces and shroud modification hardware.
C-3-C 80% ID Examination. Proximity of a specimen bracket and jet pump riser braces.
C-4-A 73% ID Examination. Manipulator lower limit and proximity of shroud gusset plates.
C-4-B 0% ID Examination. Proximity of shroud modification hardware (tie rod).
C-4-C 7390 ID Examination. Manipulator lower limit and proximity of shroud gusset plates.
Enclosure 4 Edwin I. Hatch Nuclear Plant Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests Synopsis of Leak Detection and Radiation Monitoring
Leakage Detection System (LDS)
The LDS is described in more detail in HNP-1 FSAR Section 4.10 and HNP-2 FSAR Section 5.2.7.
Inside drywell Drywell floor drain sump measurement monitors the normal design leakage collected in the floor drain sump. The drywell equipment drain sump measurement monitors identified leakage collected in the equipment drain sump, and is a closed system which receives leakage only from identified sources. All leakage inside the drywell will flow to one of these two sumps. The "unidentified leakage" is the portion of the total leakage rate received in the drywell sumps that cannot be attributed to pumps, valve seals, and the RPV head seal. The TS limit for unidentified leakage is 5 gpm. This value is based on, but conservatively much less than, the calculated flow (150 gpm) from a critical crack inside the drywell. The LDS is required to detect unidentified leakage of 5 gpm within one hour, but is capable of measuring much lower leakage rates. The post-accident radiation monitoring system (RMS) is part of the redundant LDS. The drywell fission products monitoring system provides a continuous air sampling of the drywell atmosphere through monitoring gross particulates, iodine, and noble gases. This system supplements the other methods and provides improved sensitivity to aid in determining the size and general source of leaks, particularly steam leaks.
Reactor Building Outside the primary containment, each system is monitored in compartments, or rooms, so that leakage may be detected by leak detection sumps and area temperature indications. An increase in the normal rate of leakage into the floor drain sumps results in actuation of an alarm in the Main Control Room (MCR). Thermocouples in the Reactor Building rooms monitor ambient air temperature as well as temperature differential in the inletloutlet of the normal ventilation and the standby coolers. High ambient air temperature or high differential temperature causes an alarm to annunciate in the MCR.