MONTHYEARML0710203472007-05-0909 May 2007 Tech Spec Pages for Amendment 184 Control Room Emergency Ventilation System and Air Conditioning System Project stage: Other ML0710203332007-05-0909 May 2007 Issuance of License Amendment 184 Control Room Emergency Ventilation System and Air Conditioning System Project stage: Approval 2007-05-09
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23052A0462023-02-21021 February 2023 Enclosure 4 - Revised Technical Specifications (Retyped Version) ML23052A0452023-02-21021 February 2023 Enclosure 3 - Revised Technical Specifications (Red Line Version) ML23067A1682022-12-29029 December 2022 Technical Specifications, Chapter 4, Design Features ML23067A1592022-12-29029 December 2022 Technical Specifications, Chapter 3, Limiting Condition for Operation (LCO) and Surveillance Requirement (SR) Applicability ML23067A1602022-12-29029 December 2022 Technical Specifications, Chapter 3.6, Containment Systems ML23067A1612022-12-29029 December 2022 Technical Specifications, Chapter 1, Use and Application ML23067A1632022-12-29029 December 2022 Technical Specifications, Chapter 2, Safety Limits (Sls) ML23067A1642022-12-29029 December 2022 Technical Specifications, Chapter 5, Administrative Controls ML23067A1662022-12-29029 December 2022 Technical Specifications, Table of Contents ML23067A1672022-12-29029 December 2022 Technical Specifications, List of Effective Pages ML23067A1692022-12-29029 December 2022 Technical Specifications, Chapter 3.4, Reactor Coolant System ML23067A1702022-12-29029 December 2022 Technical Specifications, Chapter 3.9, Refueling Operations ML23067A1572022-12-29029 December 2022 Technical Specifications, Chapter 3.3, Instrumentation ML23067A1712022-12-29029 December 2022 Technical Specifications, Chapter 3.2, Power Distribution Limits ML23067A1562022-12-29029 December 2022 Technical Specifications, Chapter 3.7, Plant Systems ML23067A1622022-12-29029 December 2022 Technical Specifications, Chapter 3.1, Reactivity Control Systems ML23067A1582022-12-29029 December 2022 Technical Specifications, Chapter 3.5, Emergency Core Cooling Systems (ECCS) ML23067A1652022-12-29029 December 2022 Technical Specifications, Chapter 3.8, Electrical Power System ML22301A0072022-12-0202 December 2022 Issuance of Amendment No. 229 to Revise Technical Specifications to Adopt TSTF-505, Revision 2, and TSTF-439, Revision 2 ML22334A2572022-11-30030 November 2022 Proposed Technical Specification TOC Page (Markup) ML22334A2582022-11-30030 November 2022 Proposed Technical Specification TOC Page (Clean Page) ML22334A2592022-11-30030 November 2022 Revised Technical Specification Pages (Markup) ML22334A2602022-11-30030 November 2022 Revised Technical Specification Pages (Clean Pages) ML22285A1192022-10-12012 October 2022 Attachment 2 to Enclosure 1: Revised Clean Technical Specifications ML22285A1182022-10-12012 October 2022 Attachment 1 to Enclosure 1: Marked-Up Existing Technical Specifications ML22251A3442022-09-0808 September 2022 Attachment 1: Marked-Up TS Pages for TS 3.6.8 ULNRC-06766, Attachment 2: Retyped TS Pages for TS 3.6.82022-09-0808 September 2022 Attachment 2: Retyped TS Pages for TS 3.6.8 ULNRC-06744, Revised Technical Specification Pages2022-08-0404 August 2022 Revised Technical Specification Pages ML22181B1322022-06-30030 June 2022 Attachment 2 - Replacement for Attachment 2, Proposed Technical Specification Changes (Mark-up), of ULNRC-06688 ML22181B1332022-06-30030 June 2022 Attachment 3 - Replacement for Attachment 3, Revised Technical Specification Pages, of ULNRC-06688, as Corrected in ULNRC-06702 ML22153A1772022-06-0202 June 2022 Attachment 1 - Marked-Up Existing Technical Specifications ML22153A1782022-06-0202 June 2022 Attachment 2 - Revised Clean Technical Specifications ML21343A0972021-12-0909 December 2021 Attachment 3: Revised Technical Specifications Pages ML21343A0962021-12-0909 December 2021 Attachment 2: Proposed Technical Specifications Changes (Mark-Up) ML21335A4562021-12-0101 December 2021 Enclosure 4: Retyped Technical Specification Pages ML21335A4552021-12-0101 December 2021 Enclosure 3: Proposed Technical Specification Changes (Mark-Up) ULNRC-06702, Enclosureplacement Version of Attachment 3 to ULNRC-06688, Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-5052021-11-24024 November 2021 Enclosureplacement Version of Attachment 3 to ULNRC-06688, Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505 ML21194A2752021-06-22022 June 2021 Technical Specification, Chapter 3.3, Instrumentation ML21194A2912021-06-22022 June 2021 Technical Specification, Chapter 3.9, Refueling Operations ML21194A2902021-06-22022 June 2021 Technical Specification, Chapter 4.0, Design Features ML21194A2892021-06-22022 June 2021 Technical Specification, List of Effective Pages ML21194A2882021-06-22022 June 2021 Technical Specification, Table of Contents ML21194A2872021-06-22022 June 2021 Technical Specification, Chapter 3.8, Electrical Power Systems ML21194A2852021-06-22022 June 2021 Technical Specification, Chapter 3.6, Containment Systems ML21194A2862021-06-22022 June 2021 Technical Specification, Chapter 5.0, Administrative Controls ML21194A2842021-06-22022 June 2021 Technical Specification, Chapter 3.7, Plant Systems 2024-01-18
[Table view] |
Text
(4) UE, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source of special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) UE, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level UE is authorized to operate the facility at reactor core power levels not in excess of 3565 megawatts thermal (100% power) in accordance with the conditions specified herein.
(2) Technical Specifications and Environmental Protection Plan*
The Technical Specifications contained in Appendix A, as revised through Amendment No. 184 and the Environmental Protection Plan contained in Appendix B, are hereby Incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Environmental Qualification (Section 3.11. SSE R #3) **
Deleted per Amendment No. 169 Amendments 133, 134, &135 were effective as of April 30, 2000 however these amendments were implemented on April 1, 2000.
The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report andlor Its supplements wherein the license condition is discussed.
Amendment 184
CREVS 3.7.10 ACTIONS (continued)
COMPLETION TIME CONDITION REQUIRED ACTION TIME D. Required Action and D.1 Place OPERABLE Immediately associated Completion CREVS train in CRVIS Time of Condition A not met mode.
in MODE 5 or 6, or during movement of irradiated fuel assemblies.
OR D.2.1 Suspend CORE Immediately ALTERATIONS.
AND D.2.2 Suspend movement of Immediately irradiated fuel assemblies.
E. Two CREVS trains E.1 Suspend CORE Immediately inoperable in MODE 5 or 6, ALTERATIONS.
or during movement of irradiated fuel assemblies.
AND E.2 Suspend movement of Immediately irradiated fuel assemblies.
F. Two CREVS trains F.1 Enter LCO 3.0.3. Immediately inoperable in MODE 1,2,3, or 4 for reasons other than Condition B.
CALLAWAY PLANT 3.7-26 Amendment No. 184
CRACS 3.7.11 ACTIONS (continued)
COMPLETION TIME CONDITION REQUIRED ACTION TIME C. Required Action and C.1 Place OPERABLE Immediately associated Completion CRACS train in Time of Condition A not met operation.
in MODE 5 or 6, or during movement of irradiated fuel assemblies.
OR C.2.1 Suspend CORE Immediately ALTERATIONS.
AND C.2.2 Suspend movement of Immediately irradiated fuel assemblies.
D. Two CRACS trains D.1 Suspend CORE Immediately inoperable in MODE 5 or 6, ALTERATIONS.
or during movement of irradiated fuel assemblies.
AND D.2 Suspend movement of Immediately irradiated fuel assemblies.
E. Two CRACS trains E.1 Enter LCO 3.0.3. Immediately inoperable in MODE 1,2,3, or 4.
CALLAWAY PLANT 3.7-29 Amendment No. 184
Emergency Exhaust System 3.7.13 3.7 PLANT SYSTEMS 3.7.13 Emergency Exhaust System (EES)
LCO 3.7.13 Two EES trains shall be OPERABLE.
--- -NOTE--
The auxiliary or fuel building boundary may be opened intermittently under administrative control.
APPLICABILITY: MODES 1, 2, 3, and 4, During movement of irradiated fuel assemblies in the fuel building.
NOTE The SIS mode of operation is required only in MODES 1, 2, 3 and 4. The FBVIS mode of operation is required only during movement of irradiated fuel assemblies in the fuel building.
ACTIONS coMPLETION REQUIRED ACTION TIME CONDITION TIME A. One EES train inoperable. A.1 Restore EES train to 7 days OPERABLE status. I B. Two EES trains inoperable B.1 Restore auxiliary building 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> due to inoperable auxiliary boundary to OPERABLE building boundary in status.
MODE 1, 2, 3 or 4.
(continued)
CALLAWAY PLANT 3.7-32 Amendment No. 184
Emergency Exhaust System 3.7.13 ACTIONS (continued)
COMPLETION REQUIRED ACTION TIME CONDITION TIME C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or B not AND met in MODE 1, 2, 3, or 4.
C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Two EES trains inoperable in MODE 1, 2, 3, or 4 for reasons other than Condition B.
D. Required Action and D.1 Place OPERABLE EES Immediately associated Completion Time train in the FBVIS mode.
of Condition A not met during movement of irradiated fuel assemblies in the fuel building.
DR D.2 Suspend movement-of Immediately irradiated fuel assemblies In the fuel building.
E. Two EES trains inoperable E.1 Suspend movement of Immediately during movement of irradiated fuel irradiated fuel assemblies in assemblies in the fuel the fuel building. building.
CALLAWAY PLANT 3.7-33 Amendment No. 184