May 10, 2007 Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station P.O. Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1 - CORRECTION TO ADMINISTRATIVE CHANGE TO FACILITY OPERATING LICENSE IN CONJUNCTION WITH THE COMMISSION ORDER EA-06-037 AND REVISIONS TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NO. MD2277)

Dear Mr. St. Pierre:

By letter dated March 29, 2007, the Nuclear Regulatory Commission (NRC) issued a conforming administrative change to the Facility Operating License (FOL) to ensure implementation of Order EA-06-037 regarding an updated adversary characteristic in the design basis threat.

Subsequent to issuance, it was identified that the updated license page 5 enclosed in the March 29, 2007, letter contained a typographical error. Specifically, the date of issuance for NRC Materials License No. SNM-1963 was listed as December 19, 2985. The correct date of December 19, 1985, has been reflected in the enclosed, corrected, license page 5 for implementation of the conforming administrative change to FOL NPF-86.

Sincerely,

/ra/

G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

Corrected Page 5 of License No. NPF-86 cc w/encl: See next page

May 10, 2007 Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station PO Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1 - CORRECTION TO ADMINISTRATIVE CHANGE TO FACILITY OPERATING LICENSE IN CONJUNCTION WITH THE COMMISSION ORDER EA-06-037 AND REVISIONS TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NO. MD2277)

Dear Mr. St. Pierre:

By letter dated March 29, 2007, The Nuclear Regulatory Commission (NRC) issued a conforming administrative change to the Facility Operating License (FOL) to ensure implementation of Order EA-06-037 regarding an updated adversary characteristic in the design basis threat.

Subsequent to issuance, it was identified that the updated license page 5 enclosed in the March 29, 2007, letter contained a typographical error. Specifically, the date of issuance for NRC Materials License No. SNM-1963 was listed as December 19, 2985. The correct date of December 19, 1985 has been reflected in the enclosed, corrected, license page 5 for implementation of the conforming administrative change to FOL NPF-86.

Sincerely,

/ra/

G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

Corrected Page 5 of License No. NPF-86 cc w/encl: See next page DISTRIBUTION PUBLIC RidsRgn1MailCenter RidsLAKGrimes LPLI-2 R/F JPeralta, NSIR DCardenas, NSIR RidsNrrDorlLplI-2 RidsNrrPMGMiller RidsNrrLASLittle PLee, NSIR Correction Letter Accession Number: ML071020030 OFFICE LPL1-2/PM LPL1-1/LA LPL1-2/BC NAME GEMiller SLittle HChernoff DATE 4/20/07 4/19/2007 5/10/2007 Official Record Copy

Seabrook Station, Unit No. 1 cc:

Mr. J. A. Stall John Giarrusso Senior Vice President, Nuclear and Massachusetts Emergency Management Agency Chief Nuclear Officer 400 Worcester Road Florida Power & Light Company Framingham, MA 01702-5399 P.O. Box 14000 Juno Beach, FL 33408-0420 Ms. Kelly Ayotte, Attorney General Mr. Orvil Fitch, Deputy Attorney General Mr. Peter Brann 33 Capitol Street Assistant Attorney General Concord, NH 03301 State House, Station #6 Augusta, ME 04333 Mr. Christopher M. Pope, Director Homeland Security & Emergency Mgmt.

Resident Inspector New Hampshire Department of Safety U.S. Nuclear Regulatory Commission Bureau of Emergency Management Seabrook Nuclear Power Station 33 Hazen Drive P.O. Box 1149 Concord, NH 03301 Seabrook, NH 03874 Mr. M. S. Ross, Managing Attorney Town of Exeter Florida Power & Light Company 10 Front Street P.O. Box 14000 Exeter, NH 03823 Juno Beach, FL 33408-0420 Regional Administrator, Region I Mr. Rajiv S. Kundalkar U.S. Nuclear Regulatory Commission Vice President - Nuclear Engineering 475 Allendale Road Florida Power & Light Company King of Prussia, PA 19406 P.O. Box 14000 Juno Beach, FL 33408-0420 Office of the Attorney General One Ashburton Place, 20th Floor James M. Peschel Boston, MA 02108 Regulatory Programs Manager FPL Energy Seabrook, LLC Board of Selectmen PO Box 300 Town of Amesbury Seabrook, NH 03874 Town Hall Amesbury, MA 01913 Mr. Mark E. Warner Vice President, Nuclear Operations Support Mr. Robert Poole Florida Power & Light Company Federal Emergency Management Agency P.O. Box 14000 Region I Juno Beach, FL 33408-0420 99 High Street, 6th Floor Boston, MA 02110 Ms. Marjan Mashhadi Senior Attorney Mr. Tom Crimmins Florida Power & Light Company Polestar Applied Technology 801 Pennsylvania Ave., NW Suite 220 One First Street, Suite 4 Washington, DC 20004 Los Altos, CA 94019

D. Exemptions FPL Energy Seabrook, LLC, is exempted from the Section III.D.2(b)(ii) containment airlock testing requirements of Appendix J to 10 CFR 50, because of the special circumstances described in Section 6.2.6 of SER Supplement 5 and authorized by 10 CFR 50.12(a)(2)(ii) and (iii) (51 FR 37684 October 23, 1986).

NRC Materials License No. SNM-1963, issued December 19, 1985, granted an exemption pursuant to 10 CFR 70.24 with respect to requirements for criticality alarms. FPL Energy Seabrook, LLC, is hereby exempted from provisions of 10 CFR 70.24 insofar as this section applies to the storage and handling of new fuel assemblies in the new fuel storage vault, spent fuel pool (when dry), and shipping containers.

These exemptions, authorized by law, will not present an undue risk to the public health and safety and are consistent with the common defense and security.

These exemptions are hereby granted pursuant to 10 CFR 50.12. With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E. Physical Security The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, submitted by letter dated l September 23, 2004, and supplemented by letters dated October 15, October l 22, and October 29, 2004, and May 18, 2006, is entitled: Florida Power and l Light & FPL Energy Seabrook Physical Security Plan, Training and Qualification l Plan and Safeguards Contingency Plan. The set contains Safeguards l Information protected under 10 CFR 73.21. l 1

The Training and Qualification Plan and Safeguards Contingency Plan are Appendices l to the Security Plan. l Revised by letter dated May 10, 2007