ML070260441

From kanterella
Jump to navigation Jump to search

Administrative Change to Facility Operating License in Conjunction with the Commission Order EA-06-037 & Revisions to Physical Security, Training & Qualification, & Safeguards Contingency Plan
ML070260441
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/29/2007
From: Geoffrey Miller
NRC/NRR/ADRO/DORL/LPLI-2
To: Peschel J, St.Pierre G
Florida Power & Light Energy Seabrook
Miller G, NRR/DORL, 415-2481
References
EA-06-037, TAC MD2277
Download: ML070260441 (6)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION March 29, 2007 Mr. Gene F. St. Pierre, Site Vice President FPL Energy Seabrook, LLC c/o Mr. James M. Peschel Seabrook Station P.O. Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1 - ADMINISTRATIVE CHANGE TO FACILITY OPERATING LICENSE IN CONJUNCTION WITH THE COMMISSION ORDER EA-06-037 AND REVISIONS TO PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NO. MD2277)

Dear Mr. St. Pierre:

By letter to the Nuclear Regulatory Commission (NRC) dated May 18, 2006, FPL Energy Seabrook, LLC (FPLE or the licensee) submitted its revised plans and confirmed the full implementation at the Seabrook Station, Unit No. 1 (Seabrook) of Order EA-06-037 regarding an updated adversary characteristic in the design basis threat.

The NRC staff has completed its review of the changes related to implementation of Order EA-06-037. As discussed in the enclosed safeguards evaluation (Enclosure 2), the NRC staff has determined that the licensees changes to the security plans meet the requirements of the NRC Order and Title 10 of the Code of Federal Regulations (10 CFR) Part 73 requirements and are, therefore, acceptable. The effectiveness of these security provisions will continue to be the subject of NRC review and inspection.

Consistent with the Order, a conforming administrative change to the Facility Operating License is required to ensure implementation of Order EA-06-037 requirements.

NOTICE: Enclosure 2 contains Security-Related Information. Upon separation from Enclosure 2, this letter and Enclosure 1 are DECONTROLLED.

G. St. Pierre Therefore, an administrative license change to Facility Operating License No. NPF-86 is being made to incorporate the reference to the revised Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan required by the Order. These changes comply with the standards and requirements of the Atomic Energy Act of 1954, as amended, and the Commission's rules and regulations set forth in 10 CFR Chapter I. Please replace page 5 of your Facility Operating License (Enclosure 1).

If you have any questions, please contact me at (301) 415-2481.

Sincerely,

/ra/

G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosures:

1. Revised Page 5 of License NPF-86
2. Safeguards Evaluation cc w/encls 1 and 2: James Tucker, Site Security Manager Seabrook Station P.O. Box 300 Seabrook, NH 03874 Paul Krohn, Branch Chief, Region I 475 Allendale Road King of Prussia, PA 19406 cc w/encl 1 only: See next page NOTICE: Enclosure 2 contains Security-Related Information. Upon separation from Enclosure 2, this letter and Enclosure 1 are DECONTROLLED.

OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION

G. St. Pierre Therefore, administrative license change to Facility Operating License No. NPF-86 is being made to incorporate the reference to the revised Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan required by the Order. These changes comply with the standards and requirements of the Atomic Energy Act of 1954, as amended, and the Commission's rules and regulations set forth in 10 CFR Chapter I. Please replace page 5 of your Facility Operating License (Enclosure 1).

If you should have any questions, please contact me at (301) 415-2481.

Sincerely,

/ra/

G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosures:

1. Revised Page 5 of License NPF-86
2. Safeguards Evaluation cc w/encls 1 and 2: James Tucker, Site Security Manager Seabrook Station P.O. Box 300 Seabrook, NH 03874 Paul Krohn, Branch Chief, Region I 475 Allendale Road King of Prussia, PA 19406 cc w/encl 1 only: See next page DISTRIBUTION (w/encl 1 only):

PUBLIC RidsRgn1MailCenter RidsNsirLAKGrimes LPLI-2 R/F SMorris, NSIR DCardenas, NSIR RidsNrrDorlLplI-2 RidsNrrPMGMiller RidsNrrLASLittle PLee, NSIR ADAMS Accession Number: ML070260441 OFFICE LPLI-2/PM LPL1-1/LA NSIR/RSB/LA NSIR/RSB/SS NSIR/RSB/BC LPLI-2/BC NAME GEMiller SLittle KGrimes DCardenas SMorris, HChernoff AFrazier for DATE 3/29/07 3/23/07 3/15/07 3/15/07 3/16/07 3/28/07 OFFICIAL RECORD COPY

D. Exemptions FPL Energy Seabrook, LLC, is exempted from the Section III.D.2(b)(ii) containment airlock testing requirements of Appendix J to 10 CFR 50, because of the special circumstances described in Section 6.2.6 of SER Supplement 5 and authorized by 10 CFR 50.12(a)(2)(ii) and (iii) (51 FR 37684 October 23, 1986).

NRC Materials License No. SNM-1963, issued December 19, 2985, granted an exemption pursuant to 10 CFR 70.24 with respect to requirements for criticality alarms. FPL Energy Seabrook, LLC, is hereby exempted from provisions of 10 CFR 70.24 insofar as this section applies to the storage and handling of new fuel assemblies in the new fuel storage vault, spent fuel pool (when dry), and shipping containers.

These exemptions, authorized by law, will not present an undue risk to the public health and safety and are consistent with the common defense and security.

These exemptions are hereby granted pursuant to 10 CFR 50.12. With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E. Physical Security The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, submitted by letter dated l September 23, 2004, and supplemented by letters dated October 15, October l 22, and October 29, 2004, and May 18, 2006, is entitled: Florida Power and l Light & FPL Energy Seabrook Physical Security Plan, Training and Qualification l Plan and Safeguards Contingency Plan. The set contains Safeguards l Information protected under 10 CFR 73.21. l 1

The Training and Qualification Plan and Safeguards Contingency Plan are Appendices l to the Security Plan. l Revised by letter dated

Seabrook Station, Unit No. 1 cc:

Mr. J. A. Stall Ms. Cristine McComb, Director Senior Vice President, Nuclear and ATTN: John Giarrusso Chief Nuclear Officer Massachusetts Emergency Management Agency Florida Power & Light Company 400 Worcester Road P.O. Box 14000 Framingham, MA 01702-5399 Juno Beach, FL 33408-0420 Ms. Kelly Ayotte, Attorney General Mr. Peter Brann Mr. Orvil Fitch, Deputy Attorney General Assistant Attorney General 33 Capitol Street State House, Station #6 Concord, NH 03301 Augusta, ME 04333 Mr. Christopher M. Pope, Director Resident Inspector Homeland Security & Emergency Mgmt.

U.S. Nuclear Regulatory Commission New Hampshire Department of Safety Seabrook Nuclear Power Station Bureau of Emergency Management P.O. Box 1149 33 Hazen Drive Seabrook, NH 03874 Concord, NH 03301 Town of Exeter Mr. M. S. Ross, Managing Attorney 10 Front Street Florida Power & Light Company Exeter, NH 03823 P.O. Box 14000 Juno Beach, FL 33408-0420 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Mr. Rajiv S. Kundalkar 475 Allendale Road Vice President - Nuclear Engineering King of Prussia, PA 19406 Florida Power & Light Company P.O. Box 14000 Office of the Attorney General Juno Beach, FL 33408-0420 One Ashburton Place, 20th Floor Boston, MA 02108 James M. Peschel Regulatory Programs Manager Board of Selectmen FPL Energy Seabrook, LLC Town of Amesbury PO Box 300 Town Hall Seabrook, NH 03874 Amesbury, MA 01913 Mr. Robert Poole Federal Emergency Management Agency Region I 99 High Street, 6th Floor Boston, MA 02110 Mr. Tom Crimmins Polestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019

Seabrook Station, Unit No. 1 cc:

Ms. Marjan Mashhadi Senior Attorney Florida Power & Light Company 801 Pennsylvania Ave., NW Suite 220 Washington, DC 20004 Mr. Mark E. Warner Vice President, Nuclear Operations Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420