Tech Spec Page Re Surveillance Requirements 3.3.2.1
ML071010262
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 04/09/2007
From: Richard Guzman
NRC/NRR/ADRO/DORL/LPLI-1
To:
References
TAC MC9041
Download: ML071010262 (3)


Text

PPL Rev. 1 Control Rod Block Instrumentation 3.3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY

b. Intermediate Power Range - Upscale Function is not bypassed when APRM Simulated Thermal Power is > Intermediate Power Range Setpoint specified in the COLR and < High Power Range Setpoint specified in the COLR.
c. High Power Range - Upscale Function is not bypassed when APRM Simulated Thermal Power > High Power Range Setpoint specified in the COLR.

SR 3.3.2.1.5 Verify the RWM is not bypassed when THERMAL POWER 24 months is < 10% RTP.

SR 3.3.2.1.6 Not required to be performed until 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after reactor mode switch is in the shutdown position.

Perform CHANNEL FUNCTIONAL TEST. 24 months SR 3.3.2.1.7 -- NOTE --

Neutron detectors are excluded.

Perform CHANNEL CALIBRATION. 24 months SR 3.3.2.1.8 Verify control rod sequences input to the RWM are in Prior to declaring conformance with BPWS. RWM OPERABLE following loading of sequence into RWM SUSQUEHANNA - UNIT 2 TS / 3.3-19 Amendment 1X1, 220 Reviedby letter datedl *gri 9, 2007