Summary of Annual Assessment Meeting with Dominion Nuclear Connecticut and the Connecticut Nuclear Energy Advisory Council (Neac) Regarding the Nrc'S Assessment of the Safety Performance of the Millstone for Calendar Year 2006
ML071010047
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/09/2007
From: Paul Krohn
NRC/RGN-I/DRP/PB6
To:
Krohn P, RI/DRP/PB6/610-337-5120
References
Download: ML071010047 (2)


Text

April 9, 2007 MEETING

SUMMARY

LICENSEE: DOMINION NUCLEAR CONNECTICUT FACILITY: MILLSTONE, UNITS 2 & 3

SUBJECT:

SUMMARY

OF MARCH 22, 2007, ANNUAL ASSESSMENT MEETING WITH DOMINION NUCLEAR CONNECTICUT AND THE CONNECTICUT NUCLEAR ENERGY ADVISORY COUNCIL (NEAC)

On March 22, 2007, at 3:00 p.m., an Annual Assessment Meeting was conducted at the Lenan F. Sillin Training Facility, Waterford, CT, between the Nuclear Regulatory Commission (NRC) and Dominion Nuclear Connecticut (Dominion). The NRC requested the meeting with Dominion management to discuss the NRCs assessment of the safety performance of the Millstone Nuclear Power Plant for calendar year 2006. At 6:00 p.m. the same day a joint meeting with NEAC was conducted at the Waterford Town Hall, Waterford, CT, to discuss the implementation of the Reactor Oversight Process and to answer questions regarding the Millstone Nuclear Power Plant performance for calendar year 2006.

The NRC presented and discussed its assessment of the safety performance of Millstone Units 2 and 3 for the period between January 1 through December 31, 2006. The NRC presentations included a discussion of the Reactor Oversight Process, general background on both plants, 2006 performance assessment results, and an overview of calendar year 2007 planned inspections. As part of the annual assessment at 3:00 p.m., Dominion presented an overview of their performance in the areas of Operations and Engineering. At the 6:00 p.m.

meeting, the NRC provided NEAC with an overall assessment of plant performance and with specific information concerning selected inspection findings.

The public observed both meetings and were offered the opportunity to communicate with the NRC regarding Dominions performance at Millstone and the role of the agency in ensuring safe plant operations. At the end of both meetings the NRC answered questions from the public, including a discussion of events and issues that occurred at the Millstone units over the previous year. The meeting notices with attached meeting agenda can be located in ADAMS Accession No. ML070670485 and ML070670489. The slides for the meetings can be found at ADAMS Accession No. ML070790730.

Sincerely,

/RA Barry Norris for/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

2 Distribution:

P. Krohn, DRP B. Norris, DRP S. Schneider, DRP J. Benjamin, DRP E. Bartels, DRP E. Huang, DRP A. Burritt, DRP V. Nerses, NRR E. Miller, NRR SUNSI Review Complete: PGK DOCUMENT NAME: G:\DRP\BRANCH 6\Meeting Notice and Summary and Slides\2007 Millstone AA Meeting Summary.wpd After declaring this document An Official Agency Record it will be released to the Public.