Ltr. to Andrew Feeney, Dated March 22, 2007 from Rebecca S. Thomson, Regional Assistant Committee (Rac) Chair, REP Program Branch Chief, Region II, Us Dept of Homeland Security, Re Indian Point Energy Ctr New Alert & Notification System (an
ML070940152
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/22/2007
From: Thomson R
US Dept of Homeland Security
To: Feeney A
Office of Nuclear Reactor Regulation, State of NY, Emergency Management Office
References
Download: ML070940152 (4)


Text

U.S. Department of Homeland Security Washington, DC 20528 26 Federal Plaza, 1 3rh Floor New York, NY 10278 SHomeland Security March 22, 2007 Mr. Andrew Feeney First Deputy Director New York State Emergency Management Office 1220 Washington Ave.

Building 22, Suite.10.1 Albany, NY 12226-2251

Dear Mr. Feeney,

Thank you for your letter requesting review of the final documents provided by the licensee concerning Indian Point Energy Center (IPEC) new alert and notification system (ANS) design as described in the January 5, 2007 report and the additional information provided, to DHS/FEMA at a meeting with your office, the licensee and the NRC on March 8,, 2007. These documents together form the Alert and Notification System Design Report of record. (See Attachment A to this letter for an inventory of the information that was provided on March 8, 2007.) Please see the attached memorandum from Craig Conklin, REP Program HQ (Attachment B) indicating DHS/FEMA approval of the design. Per 44 CFR 350.14, any "significant changes" to the design must receive DHS/FEMA regional prior review and acceptance before they can be implemented by IPEC. Following these procedures should keep the project on track and timely.

Final DHS/FEMA acceptance of the new IPEC siren system will be predicated on adequate documentation of the final system components and configuration including operating procedures, results of commissioning testing, software quality assurance (QA) and configuration management, siren system testing frequency; procedures and methods, alert and notification system performance indicators, system interfaces, and the preventive maintenance program. Any new backup notification procedures also need to be described, including testing results.

This information should be included in a. consolidated design report and submitted to DHS/FEMA as soon as possible after the new siren system is declared operational.

These actions will be necessary to provide reasonable assurance that the proposed IPEC'9 alert and notification system will continue to meet the design objectives described in'the' design report throughout its operating lifetime and that the.proposed new backup alert and notification method adheres to the applicable guidance of NUREG-0654/FEMA-REP-1,. Rev. 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants and FEMA-REP-10, Guide for the Evaluation ofAlert and Notification Systems for Nuclear Power Plants.

www.dhs.gov

As noted in the memorandum from DHS HQ REP Program Branch, the old alert and notification system must remain operational to ensure that sufficient ANS coverage is maintained. Once the DHS/FEMA REP Program has provided final approval of the new IPEC ANS, the old system may be dismantled.

If you have questions or concerns related to this matter, I can be reached at 212-680-8509. Thank you.

Sincerely yours, Rebecca S. Thomson Regional Assistance Committee (RAC) Chair REP Program Branch Chief, Region II cc:

Vanessa Quinn, Chief, REP Program Russell Gates, Principal Engineer, REP and CSEP Programs Dan Wilcox, Deputy Director, REP Program Michael Takacs, REP Program HQ Liaison to R.Ii Nader Mamish, Deputy Director of EP, NSIR, NRC HQ Anthony McMurtray, Chief, Regulatory Improvements and Outreach Branch, NSIR, NRC HQ Samuel Collins, Regional Administrator, NRC R. I

Attachment A INFORMATION PROVIDED BY ENTERGY ON MARCH 8,2007 FOR DHS/FEMA REP PROGRAM REVIEW Documents Radio Programming, Dated 01-2006 0 Evaluation of Siren Poll for IPEC, Dated 1-25-07 Siren Firmware Specification, Dated 07-07 a ANS Siren System Administration, Dated 16-05 a Indian Point Alert and Notification System Operability Check List, Dated

- None (03-07-07)

Cyber Security Program, Dated 01-06 Software Quality Assurance Program, Dated 01-06

  • Acoustic Technology Software Manual, Dated 06
  • Cybercomm (RF Propagation Coverage Chart), Dated 14-06 Siren System Notification Process (Data Flow to New York State SEMO Cap Servers), Dated - No Date Siren Status Reporting (IPEC Configuration), Dated 06-07
  • Putman County Site Survey Microwave and Simulcast Subsystem Project, Dated 15-06
  • ATI Maintenance Program, Dated 06-07 e

Entergy Indian*Point Entergy Center Modification Test Procedure Incremental test 04 Degraded Voltage testing, Dated - No Date Incremental Test 04 Siren System Degraded Voltage Test Worksheet, Dated -No Date Drawings Installation Drawing For ATI 3200 Watt Soundblaster, Dated -. 04-03-06 Microwave and Simulcast Radio Subsystem, Dated 28-06 0 400 Foot Tower MET, Site A, Dated-10-25-06

  • 400 Foot Tower Grasslands, Site C Dated 05-06
  • Tower/Antenna Locations - Harriman, Site B Dated 05-06
  • Plan View, Site B Dated 04-06 180 Foot Tower Tinker, Site D Dated 06-06
  • Pack Assembly Drawing MET Tower - Main, Site A, Dated 02-06 Rack Assembly Drawing - Harriman, Site B, Dated 28-06 Rack Assembly Drawing - Grasslands, Site C, Dated 28-06
  • Rack Assembly Drawing - Tinker - Stand-by, Site D, Dated 02-06 a 200 MHz Radio Rack, Dated 05-06 a Indian Point CCU Cabinet, Dated -- 09-15-06 Control Station Block Diagram, Dated 13-06

U.S. Department of Homeland Security Washington, DC 20528 ATTACHMENT B

MAR 1 2007 Homeland

~Secur ity MEMORANDUM FOR:

Rebecca Thomson Regional Assistance Committee Chair FEMA Region II THROUGH:

Vanessa E. Quinn Chief Radiological Emergency Preparedness Branch FROM:

W. Craig Conklin I_)

Director Chemical and Nuclear Preparedness and Protection Division

SUBJECT:

Analysis of the Indian Point Energy Center Alert and Notification System Design Report Based on the original Indian Point Energy Center ([PEC) Alert and Notification System (ANS)

Design Report, dated January 5, 2007, as well as the additional information provided by Entergy during our meeting of March 8, 2007, the IPEC ANS Design Report is hereby approved.

However, final acceptance of the IPEC ANS is contingent upon DHS approval of the system test results, as outlined in FEMA REP-0, "Guide for the Evaluation of Alert and Notification Systems for Nuclear Power Plants", dated November, 1985, and NUREG-0654/FEMA-REP-1 Rev 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants", reprinted March, 1987. The final system test results must indicate that the number of sirens tested for meeting the acceptable decibel levels above background was based on a statistical sampling methodology approved by DHS. A description of the sampling methodology used must also be provided with the final system test results.

During system testing and the DHS approval process, the old ANS must remain operational to ensure sufficient ANS coverage is maintained. Once DHS has provided final approval of the new IPEC ANS, the old system is no longer required to remain operational.

Please convey the contents of this memorandum to the appropriate Entergy and State of New York management representatives and request that they provide you with the necessary information and requirements. Thank your for the support that you and your staff have provided during this process. If you have any questions, or wish to discuss this matter further, please contact Ms. Vanessa Quinn at (703) 605-1535.