Letter Sequence Other |
---|
|
|
MONTHYEARML0705206062007-03-19019 March 2007 Issuance of Amendments Power Range Neutron Flux High Negative Rate Trip and Editorial Changes (Tac Nos. MD1490 and MD1491) Project stage: Approval ML0708104192007-03-19019 March 2007 Technical Specification for Amendment 278 Power Range Neutron Flux High Negative Rate Trip Project stage: Other 2007-03-19
[Table View] |
Similar Documents at Salem |
---|
Category:Technical Specifications
MONTHYEARML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML23192A8212023-08-14014 August 2023 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days ML21295A2292021-11-15015 November 2021 Issuance of Amendment Nos. 340 and 321 Revise Technical Specifications to Adopt TSTF 569, Revision of Response Time Testing Definitions ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19275D6942019-11-18018 November 2019 Issuance of Amendment Nos. 330 and 311 Revise Technical Specifications to Adopt TSFT-547, Clarification of Rod Position Requirements LR-N18-0129, License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements.2019-02-0404 February 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements. ML16096A4192016-04-28028 April 2016 Issuance of Amendments Replacement of Source Range and Intermediate Range Neutron Monitoring Systems ML16054A0682016-03-28028 March 2016 Issuance of Amendments Regarding Revision to Reactor Trip System Instrumentation Technical Specifications ML16035A0872016-03-0707 March 2016 Issuance of Amendments New Technical Specifications to Isolate Unborated Water Sources in Mode 6 LR-N16-0044, Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel2016-02-11011 February 2016 Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel LR-N15-0224, Response to Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling)2015-11-25025 November 2015 Response to Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling) LR-N15-0182, License Amendment Request to Correct a Non-Conservative Technical Specification Applicability Statement and Inconsistent Action Statements2015-10-12012 October 2015 License Amendment Request to Correct a Non-Conservative Technical Specification Applicability Statement and Inconsistent Action Statements ML15245A6362015-09-0404 September 2015 Issuance of Emergency Amendment Regarding Removal of Pressurizer Power Operated Relief Valve Position Indication Instrumentation from Technical Specifications ML15153A2302015-07-30030 July 2015 Issuance of Amendments Adopting Technical Specification Task Force (TSTF)-510, Rev, 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection(Tac Nos. MF4574 & MF457 ML15141A2712015-06-17017 June 2015 and Salem Nuclear Generating Station, Unit Nos.1 and 2, Issuance of Amendments Update of Appendix B to the Renewed Facility Operating Licenses ML15063A2932015-03-30030 March 2015 Issuance of Amendments Revision to Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor LR-N14-0074, License Amendment Request to Revise Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor2014-03-24024 March 2014 License Amendment Request to Revise Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor LR-N12-0183, License Amendment Request: Revision to Technical Specification (TS) 3.7.6.1 (Unit 1) and 3.7.6 (Unit 2) Control Room Emergency Air Conditioning System2012-07-17017 July 2012 License Amendment Request: Revision to Technical Specification (TS) 3.7.6.1 (Unit 1) and 3.7.6 (Unit 2) Control Room Emergency Air Conditioning System LR-N11-0208, Revised License Condition- Salem-Hope Creek Cyber Security Plan Supplement Submittal2011-07-0606 July 2011 Revised License Condition- Salem-Hope Creek Cyber Security Plan Supplement Submittal ML11175A2072011-06-30030 June 2011 Appendices a, B and C ML11136A0642011-06-30030 June 2011 Issuance of Renewed Facility Operating License Nos. DPR-70 and DPR-75 for Salem Nuclear Generating Station, Units 1 and 2 LR-N10-0363, License Amendment Request: Changes to Snubber Surveillance Requirements2010-10-0404 October 2010 License Amendment Request: Changes to Snubber Surveillance Requirements ML1020805012010-08-20020 August 2010 License Amendment, Issuance of Amendments Surveillance Requirements for Inservice Inspection and Inservice Testing LR-N10-0098, License Amendment Request - One Time On-Line Safety-Related Battery Replacement2010-03-29029 March 2010 License Amendment Request - One Time On-Line Safety-Related Battery Replacement ML1005704522010-03-29029 March 2010 Issuance of Amendment Steam Generator Inspection Scope and Repair Requirements ML0936308182010-01-12012 January 2010 License Amendment, Revise the Definition of Fully Withdrawn for the Rod Cluster Control Assemblies ML0929605842009-10-0808 October 2009 License Amendment Request, Revision to Technical Specification 6.8.4.i, Steam Generator Program, for One-Time (Interim) Alternate Repair Criteria (H*) LR-N09-0001, License Amendment Request to Eliminate Unnecessary Reporting Requirements in the Operating License and the Administrative Controls Section of the Technical Specifications2009-01-0505 January 2009 License Amendment Request to Eliminate Unnecessary Reporting Requirements in the Operating License and the Administrative Controls Section of the Technical Specifications ML0823409962008-09-24024 September 2008 Technical Specifications, Issuance of Amendment No. 273 Refueling Operations - Decay Time ML0823409752008-09-24024 September 2008 Technical Specifications, Issuance of Amendment No. 289 Refueling Operations - Decay Time ML0806700642008-03-13013 March 2008 Tech Spec Pages for Amendment 288, Surveillance Requirements for Containment Building Penetrations ML0806700822008-03-13013 March 2008 Tech Spec Pages for Amendment 272, Surveillance Requirements for Containment Building Penetrations LR-N08-0054, License Amendment Request (LAR) S08-03, Request for Change to Technical Specifications Refueling Operations - Containment Building Penetrations2008-03-0505 March 2008 License Amendment Request (LAR) S08-03, Request for Change to Technical Specifications Refueling Operations - Containment Building Penetrations ML0803204342008-03-0505 March 2008 Tech Spec Pages for Amendment 271 Re Refueling Operations - Decay Time ML0802204242008-02-27027 February 2008 Technical Specifications, Amendment. 270, License DPR-75, Steam Generator Feedwater Pump Trip, Feedwater Isolation Valve Response Time Testing and Containment Cooling System ML0802204142008-02-27027 February 2008 Technical Specifications to Amendment 287, License DPR-70, Steam Generator Feedwater Pump Trip, Feedwater Isolation Valve Response Time Testing and Containment Cooling System ML0734705152008-01-24024 January 2008 Amd 286/License DPR-75, Technical Specifications, Established More Effective & Appropriate Action, Surveillance & Administrative Requirements Re Ensuring the Habitability of the Control Room Envelop ML0734704082008-01-24024 January 2008 Amd 286/License DPR-70, Technical Specifications, Established More Effective & Appropriate Action, Surveillance & Administrative Requirements Re Ensuring the Habitability of the Control Room Envelop ML0717101192007-06-19019 June 2007 Technical Specifications for Amendment No. 266, Issuance of Amendments Relocation of Response Time Testing Limits (TAC Nos. MD2804 & MD2805) ML0717101212007-06-19019 June 2007 Technical Specifications for Amendment No. 283, Issuance of Amendments Relocation of Response Time Testing Limits (TAC Nos. MD2804 & MD2805) ML0715901892007-06-0606 June 2007 Units, 1 and 2, Tech Spec Pages for Amendment 282 Relocation of Technical Specification Requirements for the Movable Incore Detectors and Radioactive Gaseous Effluent Oxygen Monitoring Instrumentation ML0712202912007-05-10010 May 2007 Correction to Technical Specification Pages for Amendment Nos. 276 and 258 LR-N07-0103, Units 1 & 2, Correction to Technical Specification Pages/Amendment 276 and 2582007-05-0404 May 2007 Units 1 & 2, Correction to Technical Specification Pages/Amendment 276 and 258 ML0710906192007-04-19019 April 2007 Tech Spec Pages for Amendment 263 Accident Monitoring Instrumentation and Source Check Definition ML0710906332007-04-19019 April 2007 Tech Spec Pages for Amendment 280 Accident Monitoring Instrumentation and Source Check Definition ML0711503562007-04-19019 April 2007 Technical Specifications Elimination of Requirements for Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement Process ML0711503582007-04-19019 April 2007 Technical Specifications Elimination of Requirements for Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement Process LR-N07-0058, Application to Revise Technical Specifications (LCR S07-02) Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-15015 April 2007 Application to Revise Technical Specifications (LCR S07-02) Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0709203782007-03-29029 March 2007 Technical Specifications, Steam Generator Tube Integrity 2024-07-15
[Table view] |
Text
(1) Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at a steady state reactor core power level not in excess of 3459 megawatts (one hundred percent of rated core power).
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.278 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3) Deleted Per Amendment 22, 11-20-79 (4) Less than Four Loop Operation PSEG Nuclear LLC shall not operate the reactor at power levels above P-7 (as defined in Table 3.3-1 of Specification 3.3.1.1 of Appendix A to this license) with less than four (4) reactor coolant loops in operation until safety analyses for less than four loop operation have been submitted by the licensees and approval for less than four loop operation at power levels above P-7 has been granted by the Commission by Amendment of this license.
(5) PSEG Nuclear LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report, and as approved in the NRC Safety Evaluation Report dated November 20, 1979, and in its supplements, subject to the following provision:
PSEG Nuclear LLC may make changes to the approved fire protection program without prior, approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
Amendment No.278
INDEX BASES SECTION PAGE 3/4.3 INSTRUMENTATION 3/4.3.1 PROTECTIVE AND 3/4.3.2 ENGINEERED SAFETY FEATURES (ESF)
INSTRUMENTATION .................................. B 3/4 3-1 3/4.3.3 MONITORING INSTRUMENTATION ...................... B 3/4 3-la 3/4.3.4 TURBINE OVERSPEED PROTECTION .................... B 3/4 3-4 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.1 REACTOR COOLANT LOOPS AND COOLANT CIRCULATION .............................. ....... B 3/4 4-1 3/4.4.2 SAFETY VALVES ...................... .............. B 3/4 4-la 3/4.4.3 RELIEF VALVES ...................... .............. B 3/4 4-la 3/4.4.4 PRESSURIZER ......................... .............. B 3/4 4-2 3/4.4.5 STEAM GENERATOR (SG) TUBE INTEGRITY .............. B 3/4 4-2 3/4 .4 .6 REACTOR COOLANT SYSTEM LEAKAGE ..... ............. B 3/4 4-4a 3/4 . 4 .7 DELETED 3/4 .4 .8 SPECIFIC ACTIVITY ............................... B 3/4 4-5 3/4.4.9 PRESSURE/TEMPERATURE LIMITS ..................... B 3/4 4-6 3/4 .4 .10 STRUCTURAL INTEGRITY ............................. B 3/4 4-17 3/4.4.11 BLANK ........................................... B 3/4 4-17 3/4.4.12 REACTOR VESSEL HEAD VENTS ....................... B 3/4 4-17 SALEM - UNIT 1 Xll Amendment No. 278
TABLE 2.2-1 REACTOR TRIP SYSTEM INSTRUMENTATION TRIP SETPOINTS FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES
- 1. Manual Reactor Trip Not-Applicable Not Applicable
- 2. Power Range, Neutron Fluix Low Setpoint -
- 25% of RATED Low Setpoint -
- 26% of RATED THERMAL POWER THERMAL POWER High Setpoint -
- 109% of RATED High Setpoint -
- 110% of RATED THERMAL POWER THERMAL POWER
- 3. Power Range, Neutron Fluix,
- 5% of RATED THERMAL POWER with
- 5.5% of RATED THERMAL POWER High Positive Rate a time constant Ž 2 seconds with a time constant Ž 2 seconds
- 4. Deleted
- 5. Intermediate Range, Neut iron 25% of RATED THERMAL POWER
- 30% of RATED THERMAL POWER Flux
- 6. Source Range, Neutron F!.ux 105 counts per second 1.3 x 105 counts per second
- 7. Overtemperature AT See Note 1 See Note 3
- 8. Overpower AT See Note 2 See Note 4
- 9. Pressurizer Pressure--Lo 1865 psig Ž 1855 psig
- 10. Pressurizer Pressure--Hi gh 2385 psig 5 2395 psig
- 11. Pressurizer Water Level- -High 5 92% of instrument span .* 93% of instrument span
- 12. Loss of Flow 90% of design flow per loop* 89% of design flow per loop*
- Design flow is 82,500 gpm p er io<
SALEM - UNIT 1 2-5 Amendment No 278
POWER DISTRIBUTION LIMITS SURVEILLANCE REQUIREMENTS 4.2.2.1 The provisions of Specification 4.0.4 are not applicable.
4.2.2.2 FxY shall be evaluated to determine if Fo(Z) is within its limit by:
- a. Using the movable incore detectors to obtain a power distribution map:
- 1. When THERMAL POWER is
- 25%, but > 5% of RATED THERMAL POWER, or
- 2. When the Power Distribution Monitoring System (PDMS) is inoperable; and increasing the Measured FQ(Z) by the applicable manufacturing and measurement uncertainties as specified in the COLR.
- b. Using the PDMS or the moveable incore detectors when THERMAL POWER is > 25% of RATED THERMAL POWER, and increasing the measured FQ(Z) by the applicable manufacturing and measurement uncertainties as specified in the COLR.
- c. Comparing the FxY computed (Fxyc) obtained in b, above to:
- 1. The FY limits for RATED THERMAL POWER (FXyRTP) for the appropriate measured core planes given in e and f below, and
- 2. The relationship:
L =FxyRTP [I+PFy (l-P)i where FYL is the limit for fractional THERMAL POWER operation expressed as a function of FXyR1 PFy is the power factor multiplier for Fy in the COLR, and P is the fraction of RATED THERMAL POWER at which Fxy was measured.
- d. Remeasuring FY according to the following schedule:
- 1. When Fxyc is greater than the FXyRTP limit for the appropriate measured core plane but less than the FxyL relationship, additional core power distribution measurements shall be taken and Fxyc compared to FxyRTP and FxyL :
a) Either within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after exceeding by 20% of RATED THERMAL POWER or greater, the THERMAL POWER at which Fyc was last determined, or SALEM - UNIT 1 3/4 2-6 Amendment No. 278
TABLE 3.3-1 R EACTOR TRIP SYSTEM INSTRUMENTATION MINIMUM TOTAL NUMBER CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION
- 1. Manual Reactor Trip 2 i. 2 1,2 and
- 2. Power Range, Neutron Flux 4 2 3 1,2, and 3* 2
- 3. Power Range, Neutron Flux 4 2 3 1,2 2 High Positive Rate
- 4. Deleted
- 5. Intermediate Range, Neutron Flux 2 1 1,2 and
- 6. Source Range, Neutron Flux A. Startup 2 1 2 2## and
- 4 B. Shutdown 2 0 1 3,4, and 5 5
- 7. Overtemperature AT 4 2 3 1,2 6
- 8. Overpower AT 4 2 3 1,2 6
- 9. Pressurizer Pressure-Low 4 2 3 1,2 6
- 10. Pressurizer Pressure--High 4 2 3 1,2 6 278 SALEM - UNIT 1 3/4 3-2 Amendment No.
TABLE 3.3-2 REACTOR TRIP SYSTEM INSTRUMENTATION RESPONSE TIMES FUNCTIONAL UNIT RESPONSE TIME
- 1. Manual Reactor Trip NOT APPLICABLE
- 2. Power Range, Neutron Flux
- 3. Power Range, Neutron Flux, NOT APPLICABLE High Positive Rate
- 4. Deleted
- 5. Intermediate Range, Neutron Flux NOT APPLICABLE
- 6. Source Range, Neutron Flux NOT APPLICABLE
- 7. Overtemperature AT
- 8. Overpower AT NOT APPLICABLE
- 9. Pressurizer Pressure--Low
- 10. Pressurizer Pressure--High
- 11. Pressurizer Water Level--High NOT APPLICABLE
- Neutron detectors are exempt from response time testing. Response time of the neutron flux signal portion of the channel shall be measured from detector output or input of first electronic component in channel.
SALEM - UNIT 1 3/4 3-9 Amendment No.278
TABLE 4.3-1 REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL MODES IN WHICH CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST REQUIRED
- 1. Manual Reactor Trip Switcl N.A. N.A. R(9) 1, 2, and *
- 2. Power Range, Neutron Flux S D(2), M(3) Q 1, 2, and 3*
and Q(6)
- 3. Power Range, Neutron Flux, N.A. Q 1, 2 High Positive Rate
- 4. Deleted 1 '
- 5. Intermediate Range, Neutron Flux S R(6) S/U( 1, 2 and *
- 6. Source Range, Neutron Flux S(7)
R (6) Q and S/U(') 2, 3, 4, 5 and *
- 7. Overtemperature AT S R Q 1, 2
- 8. Overpower AT S R Q 1, 2
- 9. Pressurizer Pressure--Low S R Q 1, 2
- 10. Pressurizer Pressure--High S R Q 1, 2
- 11. Pressurizer Water Level--High S R Q 1, 2
- 12. Loss of Flow - Single Loop S R Q 1 SALEM - UNIT 1 3/4 3-I11 Amendment No278
ADMINISTRATIVE CONTROLS 6.9.1.5 Reports required on an annual basis shall include:
- a. DELETED
- b. DELETED
- c. The results of any specific activity analyses in which the primary coolant exceeded the limits of Specification 3.4.8. The following information shall be included: (1) Reactor power history starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the first sample in which the limit was exceeded; (2) Results of the last isotopic analysis for radioiodine performed prior to exceeding the limit, results of analysis while the limit was exceeded and results of one analysis after the radioiodine activity was reduced to less than the limit. Each result should include date and time of sampling and the radioiodine concentrations; (3) Clean-up system flow history starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the first sample in which the limit was exceeded; (4) Graph of the 1-131 concentration and one other radioiodine isotope concentration in microcuries per gram as a function of time for the duration of the specific activity above the steady state level; and (5) The time duration when the specific activity of the primary coolant exceeded the radioiodine limit.
MONTHLY OPERATING REPORT 6,9.1.6 DELETED SALEM - UNIT 1 6-21 Amendment No. 278