Report 22; Inspection/Activity Plan, 03/01/2007 - 09/30/2008
ML070600473
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/01/2007
From:
NRC/RGN-II/DRP/RPB2
To:
Southern Nuclear Operating Co
Shared Package
ML070600462 List:
References
IR-07-001
Download: ML070600473 (2)


Text

Farley Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2007 10:47:44 Report 22 1

PB2-SUPP

- SUPPLEMENTAL FOR COOLING WATER MSPI Supplemental Program 02/12/2007 03/23/2007 1, 2 95001 IP Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 2

EB3-ISI

- UNIT 2 ISI (AFW MINIFLOW HI VIB REVIEW)

Baseline Inspections 04/16/2007 04/20/2007 2

7111108P IP Inservice Inspection Activities - PWR 2

EB3SGISI

- UNIT 2 STEAM GENERATOR ISI Baseline Inspections 04/23/2007 04/27/2007 2

7111108P IP Inservice Inspection Activities - PWR 1

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)

Safety Issues 04/29/2007 05/04/2007 2

2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

1 DRP/BR2

- OPERATIONAL ISFSI INSPECTION BY RESIDENT Other Routine 07/09/2007 07/20/2007 1, 2 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 4

PB2-PI&R

- BIENNIAL PI&R Baseline Inspections 08/06/2007 08/10/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 08/20/2007 08/24/2007 1, 2 71152B IP Identification and Resolution of Problems 1

PSB1-EP

- EP INSP Baseline Inspections 09/10/2007 09/14/2007 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 09/10/2007 09/14/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 09/10/2007 09/14/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 09/10/2007 09/14/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 09/10/2007 09/14/2007 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 09/10/2007 09/14/2007 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 09/10/2007 09/14/2007 1, 2 71151-EP03 IP Alert & Notification System 3

OL PREP

- INITIAL EXAM PREPARATION Not Applicable 10/01/2007 10/05/2007 1

V23273 FARLEY/OCTOBER 2007 EXAM AT POWER FACILITIES 1

EB3-ISI

- UNIT 1 INSERVICE INSPECTION Baseline Inspections 10/08/2007 10/12/2007 1

7111108P IP Inservice Inspection Activities - PWR 1

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)

Safety Issues 10/21/2007 10/26/2007 1

2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

3 OL EXAM

- INITIAL EXAM WEEK #1 Not Applicable 10/29/2007 11/02/2007 1

V23273 FARLEY/OCTOBER 2007 EXAM AT POWER FACILITIES 3

OL EXAM

- INITIAL EXAM WEEK #2 Not Applicable 11/05/2007 11/09/2007 1

V23273 FARLEY/OCTOBER 2007 EXAM AT POWER FACILITIES 4

EB1-MODS

- MODIFICATIONS - 10CFR50.59 Baseline Inspections 11/26/2007 11/30/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 11/26/2007 11/30/2007 1, 2 7111117B IP Permanent Plant Modifications This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Package ML070600462 Enclosure ML070600473

Farley Inspection / Activity Plan 03/01/2007 - 09/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2007 10:47:44 Report 22 1

EBR - MR

- MAINTENANCE RULE Baseline Inspections 02/04/2008 02/08/2008 1, 2 7111112B IP Maintenance Effectiveness 5

EB2-TFP

- TRIENNIAL FIRE PROTECTION Baseline Inspections 02/26/2008 02/28/2008 1, 2 7111105T IP Fire Protection [Triennial]

Baseline Inspections 03/17/2008 03/21/2008 1, 2 7111105T IP Fire Protection [Triennial]

Baseline Inspections 03/31/2008 04/04/2008 1, 2 7111105T IP Fire Protection [Triennial]

2 OL RQ

- REQUAL INSPECTION Baseline Inspections 07/07/2008 07/11/2008 1, 2 7111111B IP Licensed Operator Requalification Program 3

PSB1-EP

- EP EXERCISE Baseline Inspections 08/11/2008 08/15/2008 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 08/11/2008 08/15/2008 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/11/2008 08/15/2008 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 08/11/2008 08/15/2008 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 08/11/2008 08/15/2008 1, 2 71151-EP03 IP Alert & Notification System 1

PSB1-RP

- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 08/25/2008 08/29/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.