UNDERWATER CONSTRUCTION CORPORATION I
I Coating Material
~
PROCEDURE: IOP.02.22 REVISION: 5 Material Exp. Date Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
lU300306 B:
2U300306 Material Issued By: T. Schuster Location Where Material was Used:
Bay 1 Date of Application:
10/26/06 Total Deficiencies = 14 Total Repairs = 14 Material Storage Maintained X Yes No ThermographSN N/AI Mixing (mixed by plural component dispenser)
Total Material Mixed: 80cc Material Mixed By:
- 1) N/A
- 2) N/A
- 3) NIA Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 64 SqFt Applied By: l)J. Massey 2)T. Schuster 3)s. Cappuccio 4)J. Francschi 5 )
Total Material Applied:
40cc Inspec tion DryFi1mThickness:Min 37 Max 40 Ave 38 GageNo(s) 1)173919
- 2) 181771 Rcpairs Acceptable X
Yes No Comments All repairs appear hlly cured and tightly bonded to base metahubstrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range 1-Thermograph not required for short term storage.
Date
UNDERWATER CONSTRUCTION CORPORATION I
PROCEDUKE: lOP.02.22 I
KEVISION: 5 ATTACHMENT 1 COATING REPAIR RECORD Client:
ExelordAmerGen Facility Location: Oyster Creek Nuclear Gen. Station Work Order No.: R2077340 Description of Vessel Being Repaired:
G.E. BWR /Mark I Containment-Torus UCC Project Manager:
Phillip Bower Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
lU300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By: T.Schuster Location Where Material was Used: Bay 2 Date of Application:
10/27/06 Total Deficiencies = 13 Material Storage Maintained X Yes No Thermograph SN N/A1 Total Repairs = 10 Mixing (mixed by plural component dispenser) 1 Total Material Mixed: 30cc Material Mixed By:
- 1) N/A
- 2) N/A
- 3) N/A 1 Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 70 SqFt Applied By: 1)s. Cappuccio
- 2)
- 3)
- 4)
- 5)
Total Material Applied:
30cc Inspection Dry Film Thickness: Min 19 Max 27 Ave 23 GageNo(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments Some repairs consolidated All repairs appear fully cured and tightly bonded to base
. metalhbstrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range I-Thermograph not required for short term st Quality Control Inspector Date Owners Representative Date
UNDERWAER CONSTRUCTION COWORATION ATTACHMENT 1 COATING REPAlR RECORD Client:
ExelordAmerGen Facility Location: Oyster Creek Nuclear Gen. Station Work Order No.: R2077340 Description of Vessel Being Repaired:
G.E. BWR /Mark I Containment-Torus UCC Project Manager:
Phillip Bower Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
lU300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By: T. Schuster Material Storage Maintained X Yes Location Where Material was Used:
Bay 3 Date of Application:
10/27/06 Total Deficiencies = 33 No Thermograph SN N/AI Total Repairs = 33 Mixing (mixed by plural component dispenser)
Total Material Mixed: 120cc Material Mixed By:
- 1) NIA
- 2) NIA
- 3) NIA Surface Preparation and Coating Application Surface Preparation:
SSPC-I I Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 286 SqFt REVISION: 5 PROCEDURE: lOP.02.22 Applied By: 1)s. Cappuccio
- 2)
- 3)
- 4) 5 )
Total Material Applied:
120cc Inspection Dry Film Thickness: Min 22 Max 37 Ave 30 Gage No(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments All repairs appear fully cured and tightly bonded to base
~~
~
~~~
~~
~~
~
metakubstrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range 1-Thermograph not required for short term storage.
f Date
UNDERWATER CONSTRUCTION CORPORATION ATTACHMENT 1 COATING REPAIR RECORD I
PROCEDURE: IOP.02.22 I
REVISION: 5 Client:
ExelodAmerGen Facility Location: Oyster Creek Nuclear Gen. Station Work Order No.: R2077340 Description of Vessel Being Repaired:
G.E. BWR /Mark I Containment-Torus UCC Project Manager:
Phillip Bower Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
1U300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By: T. Schuster Material Storage Maintained X Yes Location Where Material was Used:
Bay 4 Date of Application:
10/26/06 Total Deficiencies = 160 Total Repairs = 144 No Thermograph SN N/AI Mixing (mixed by plural component dispenser)
Total Material Mixed: 300cc Material Mixed By:
- 1) N/A
- 2) N/A
- 3) N/A 1 Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 478 SqFt Applied By:
1)J. Massey
- 2)
- 3)
- 4) 5 )
Total Material Applied:
300cc Inspection Dry FilmThickness: Min 23 Max 40 Ave 32 GageNo(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments Some repairs consolidated I
All repairs appear hlly cured and tightly bonded to base metallsubstrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range 1-Thermograph not required for short term storage.
Date
UNDERWATER CONSTRUCTION CORPORATION ATTACHMENT 1 COATING REPAIR RECORD Client:
ExelodAmerGen Facility Location: Oyster Creek Nuclear Gen. Station Work Order No.: R2077340 Description of Vessel Being Repaired:
G.E. BWR /Mark I Containment-Torus UCC Project Manager:
Phillip Bower PROCEDURE: IOP.02.22 REVISION: 5 1 Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
lU300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By: S. Morneau Location Where Material was Used:
Bay I5 Date of Application:
10/26/06 Total Deficiencies = 130 Total Repairs =130 No ThennographSN N/AI I_
Material Storage Maintained X Yes Mixing (mixed by plural component dispenser)
I Total Material Mixed: 200cc Material Mixed By:
- 1) N/A
- 2) N/A
- 3) N/A 1 Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 490 SqFt Applied By: 1)R. Dicarlo 2)J. Franceschi
- 3)
- 4) 5 )
Total Material Applied:
200cc Inspection Dry FilmThickness: Min 16 Max 28 Ave 21 GageNo(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments All repairs appear filly cured and tightly bonded to base metal/substrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range 1 -Thermograph not required for short term storage.
Date
UNDERWATER CONSTRUCTION CORPORATION ATTACHMENT 1 COATING REPAIR RECORD Client:
ExelodAmerGen Facility Location: Oyster Creek Nuclear Gen. Station Work Order No.: E077340 Description of Vessel Being Repaired:
G.E. BWR /Mark I Containment-Torus UCC Project Manager:
Phillip Bower PROCEDURE: IOP.02.22 EVISION: 5
[ Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
lU300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By: S. Morneau Material Storage Maintained X Yes Location Where Material was Used:
Bay 6 Date of Application:
10/26/06 Total Deficiencies = 66 Total ReDairs = 66 No Thermograph SN N/AI Mixing (mixed by plural component dispenser)
Total Material Mixed: 87cc Material Mixed By:
- 1) N/A
- 2) N/A
- 3) N/A Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 174 SqFt Applied By: l)R. Dicarlo 2)J. Swiggart
- 3)
- 4) 5 )
Total Material Applied:
87cc Inspection Dry Film Thickness: Min 15 Max 25 Ave.21 Gage No(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments All repairs appear hlly cured and tightly bonded to base metal/substrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range 1 -Thermograph not required for short temFcrp:
-l Quality Control Inspector Date Owners Representative Date
UNDERWATER CONSTRUCTION CORPORATION ATTACHMENT 1 COATING REPAIR RECORD Client:
ExelodAmerGen Facility Location: Oyster Creek Nuclear Gen. Station Work Order No.: It2077340 Description of Vessel Being Repaired:
G.E. BWR /Mark I Containment-Torus UCC Project Manager:
Phillip Bower Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
1U300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By: S. Morneau Location Where Material was Used: Bay 7 Date of Application:
10/26/06 Total Deficiencies = 36 Total Reuairs = 36 Material Storage Maintained X Yes No Thermograph SN N/AI REVISION: 5 PROCEDURE: 10P.02.22 Mixing (mixed by plural component dispenser)
Total Material Mixed: 46cc Material Mixed By:
- 1) N/A
- 2) N/A
- 3) NIA I Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 91 SqFt Applied By: l)R. Dicarlo
- 2)
- 3)
- 4) 5 )
Total Material Applied:
46cc Inspection Dry FilmThickness: Min 24 Max 28 Ave 26 GageNo(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments All repairs appear hlly cured and tightly bonded to base metal/substrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range 1 -Thermograph not required for short term storage I
Quality Control Inspector Date Owners Representative Date
UNDERWATER CONSTRUCTION CORPORATION PROCEDURE: IOP.02.22 ATTACHMENT 1 COATING REPAIR RECORD Client:
ExelodAmerGen Facility Location:
Oyster Creek Nuclear Gen. Station Work Order No.: R2077340 Description of Vessel Being Repaired:
G.E. BWR /Mark I Containment-Torus UCC Project Manager:
Phillip Bower REVISION: 5 I Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A: lU300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By: S. Morneau Material Storage Maintained X Yes No ThermographSN N/A1 Location Where Material was Used:
Bay 8 Date of Application:
I0/26106 Total Deficiencies = 6 1 Total Repairs = 59 Mixing (mixed by plural component dispenser)
I Total Material Mixed: 95cc Material Mixed By:
- 1) NIA
- 2) NIA
- 3) N/A I Surface Preparation and Coating Application Surface Preparation: SSPC-1 1 Tools Used:
3-M Wheel, Grinder Surface area of repair:
Sq In Sq Ft Applied By: 1)R. Dicarlo 2)J. Swiggart
- 3)
- 4)
- 5)
Total Material Applied:
95cc Inspection DryFilmThickness: Min 27 Max 39 Ave 35 GageNo(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments Some repairs consolidated I
All repairs appear fully cured and tightly bonded to base metalhubstrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range l-Thermograph not required for short term st Quality Control Inspector Date Owners Representative Date
UNDERWATER CONSTRUCTION COIiPORATION ATTACHMENT 1 COATING REPAlR RECORD Client:
ExelodAmerGen Facility Location: Oyster Creek Nuclear Gen. Station Work Order No.: R.2077340 Description of Vessel Being Repaired:
G.E. BWR /Mark I Containment-Torus UCC Project Manager:
Phillip Bower PROCEDURE: 10P.02.22 I
REVISION: 5 Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
1U300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By: S. Morneau Material Storage Maintained X Yes Location Where Material was Used:
Bay 9 Date of Application:
10/26/06 Total Deficiencies = 47 No Thermograph SN N/Al Total Repairs = 41 All repairs appear fully cured and tightly bonded to base l metallsubstrate and the surrounding coating. with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range Mixing (mixed by plural component dispenser)
Total Material Mixed: 94cc Material Mixed By:
- 1) N/A
- 2) N/A
- 3) N/A 1 -Thermograph not required for short term storage.
I I
Date I Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 141 SqFt Applied By: 1)J. Swiggart
- 2)
- 3)
- 4)
- 5)
Total Material Applied:
94cc Inspection Dry FilmThickness: Min 23 Max 40 Ave 32 GageNo(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments Some repairs consolidated I
UNDERWATER CONSTRUCTION COKPOKATION PROCEDURE: lOP.02.22 ATTACHMENT 1 COATING REPAIR RECORD Client:
ExelodAmerGen Facility Location: Oyster Creek Nuclear Gen. Station Work Order No.: R2077340 Description of Vessel Being Repaired: G.E. BWR /Mark I Containment-Torus UCC Project Manager:
Phillip Bower Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
1U300306 B:
2U300306 Material Issued By: S.Morneau, TSchuster Location Where Material was Used:
Bay 10 Date of Application:
10-26-06 Total Deficiencies = 80 Material Exp. Date 04/02/07 No Thermograph SN N/A1 Material Storage Maintained X Yes Total Repairs = 80 KEVISION: 5
~
~~~
Mixing (mixed by plural component dispenser)
Total Material Mixed: 193cc Material Mixed By:
- 1) N/A
- 2) N/A
- 3) N/A Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 354 SqFt Applied By: 1)J. Swiggart 2)s. Cappuccio
- 3)
- 4) 5 )
Total Material Applied:
193cc Inspection Dry FilmThickness: Min 29 Max 39 Ave 32 GageNo(s) 1)173919
- 2) 181771 Repairs Acccptable X
Yes No Comments All repairs appear fully cured and tightly bonded to base mctaVsubstrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range 1 -Thermograph not required for short term stora
~
Quality Control Inspector Date Owners Representative Date
UNDERWATER CONSTRUCTION CORPORATION PROCEDURE: lOP.02.22 ATTACHMENT 1 COATING REPAIR RECORD Client:
Exelon/AmerGen Facility Location:
Oyster Creek Nuclear Gen. Station Work Order No.: R2077340 Description of Vessel Being Repaired:
G.E. BWR /Mark I Containment-Torus UCC Project Manager:
Phillip Bower REVISION: 5
~-
~~
~
~~~
~
Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
1U300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By: S. Morneau, /T. Schuster Location Where Material was Used:
Bay 11 Date of Application:
10/25/06 Total Deficiencies = 7 1 Material Storage Maintained X Yes No Thermograph SN N/AI Total ReDairs = 62 Mixing (mixed by plural component dispenser)
Total Material Mixed: 99cc Material Mixed By:
- 1) N/A
- 2) N/A
- 3) N/A Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 183 SqFt Applied By: l)J. Swiggart 2)J. Massey
- 3)
- 4)
- 5)
Total Material Applied:
99cc Inspection Dry FilmThickness: Min 27 Max 39 Ave 35 GageNo(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments Some repairs consolidated All repairs appear fully cured and tightly bonded to base metalhbstrate and the surrounding: coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range 1-Thermograph not required for short term stora Date
UNDERWATER CONSTRUCTlON CORPORATION ATTACHMENT 1 COATlNC REPAIR RECORD Client:
ExelonlAmerGen Facility Location: Oyster Creek Nuclear Gen. Station Work Order No.: R2077340 Description of Vessel Being Repaired:
G.E. BWR /Mark I Containment-Torus UCC Project Manager:
Phillip Bower PROCEDURE: IOP.02.22 REVISION: 5 I Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
1U300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By: S. Morneau Location Where Material was Used:
Bay 12 Date of Application:
10/27/06 Total Deficiencies = 24 Material Storage Maintained X Yes No Thermograph SN N/A1 Total Repairs = 17 Total Material Applied:
70cc Inspection Dry FilmThickness: Min 30 Max 40 Ave 38 GageNo(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments Some repairs consolidated Mixing (mixed by plural component dispenser)
Total Material Mixed: 70cc Material Mixed By:
I) N/A
- 2) N/A
- 3) N/A Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 148 SqFt I Applied By: l)R. Dicarlo 2)J. Swiggart
- 3)
- 4) 5 )
All repairs appear fully cured and tightly bonded to base metal/substrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range
~
~
1 -Thermograph not required for short term storage.
Quality Control Inspector Date Owners Representative Date
UNDERWATER CONSTRUCTION CORPORATION ATTACHMENT 1 COATING REPAIR RECORD Client:
ExelordAmerGen Facility Location: Oyster Creek Nuclear Gen. Station Work Order No.: R2077340 Description of Vessel Being Repaired:
G.E. BWR /Mark I Containment-Torus UCC Project Manager:
Phillip Bower PROCEDURE: 10P.02.22 REVISION: 5 Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
lU300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By: S. Morneau Location Where Material was Used:
Bay 13 Date of Application:
10/25/06 Total Deficiencies = 41 Material Storage Maintained X Yes No ThermographSN N/AI Total Repairs = 20 Mixing (mixed by plural component dispenser)
Total Material Mixed: 63cc Material Mixed By:
- 1) N/A
- 2) N/A
- 3) N/A 1 Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 78 SqFt Applied By: 1)J.Swiggart
- 2)
- 3)
- 4)
- 5)
Total Material Applied:
63cc Inspection Dry FilmThickness: Min 25 Max 35 Ave 32 Gage No(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments Some repairs consolidated All repairs appear fully cured and tightly bonded to base metausubstrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range 1-Thermograph not required for short term stor Quality Control Inspector Date Owners Representative Date
UNDERWATER CONSTRUCTION CORPORATION PROCEDURE: 10P.02.22 ATTACHMENT 1 COATING REPAIR RECORD Client:
ExelonlAmerGen Facility Location:
Oyster Creek Nuclear Gcn. Station Work Order No.: R2077340 Description of Vessel Being Repaired:
G.E. BWR /Mark I Containment-Torus UCC Project Manager:
Phillip Bower Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
1U300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By: S. Morneau Material Storage Maintained X Yes No Thermograph SN N/AI Location Where Material was Used:
Bay 14 Date of Application:
10/25/06 Total Deficiencies = 34 Total Reuairs= 34 REVISION: 5 Mixing (mixed by plural component dispenser)
Total Material Mixed: 6 1 cc Material Mixed By:
- 1) N/A
- 2) N/A
- 3) N/A I Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 72 SqFt Applied By: l)R. Dicarlo
- 2)
- 3)
- 4) 5 )
~~-
~~
~
~
~
Total Material Applied:
61cc Inspection DryFilmThickness: Min 25 Max 35 Ave 32 GageNo(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments All repairs appear fully cured and tightly bonded to base metal/substrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range 1-Thermograph not required for short term storage.
Date
UNDERWATER CONSTRUCTION CORPORATION PROCEDURE: lOP.02.22 ATTACHMENT 1 COATING REPAIR RECORD Client:
ExelodAmerGen Facility Location: Oyster Creek Nuclear Gen. Station Work Order No.: R2077340 Description of Vessel Being Repaired: G.E. BWR /Mark I Containment-Torus UCC Project Manager:
Phillip Bower Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
lU300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By: S. Morneau, T. Schuster Material Storage Maintained X Yes No Thermograph SN N/AI Location Where Material was Used: Bay 15 Date of Application:
10/26/06 Total Deficiencies = 44 Total Repairs = 44 Mixing (mixed by plural component dispenser)
Total Material Mixed: 306cc Material Mixed By:
- 1) N/A
- 2) N/A
- 3) N/A Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 250 SqFt Applied By: 1)R. Dicarlo 2)T. Schuster
- 3)
- 4) 5 )
Total Material Applied:
306cc UVISION: 5 Inspection Dry FilmThickness: Min 25 Max 35 Ave 32 GageNo(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments All repairs appear fully cured and tightly bonded to base metausubstrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range 1 -Thermograph not required for short term storage.
Quality Control Inspector Date Owners Representative Date
UNDERWATER CONSTRUCTION CORPORATION ATTACHMENT 1 COATING REPAIR RECORD I
PROCEDURE: IOP.02.22 I
REVISION: 5 Client:
Exelon/AmerGen Facility Location: Oyster Creek Nuclear Gen. Station Work Order No.: E077340 Description of Vessel Being Repaired:
G.E. BWR /Mark I Containment-Toms UCC Project Manager:
Phillip Bower Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
lU300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By:
T. Schuster Location Where Material was Used: Bay 16 Date of Application:
10/26/06 Total Deficiencies = 19 Material Storage Maintained X Yes No ThermographSN N/A1 Total Repairs = 19 Mixing (mixed by plural component dispenser)
Total Material Mixed: 90cc Material Mixed By:
- 1) N/A
- 2) N/A
- 3) N/A Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 57 SqFt Applied By: l)T. Schuster
- 2)
- 3)
- 4)
- 5)
Total Material Applied:
306cc
~~
Inspection Dry Film Thickness: Min 15 Max 25 Ave 22 Gage No(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments All repairs appear fully cured and tightly bonded to base metausubstrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range 1-Thermograph not required for short term storaga
\\
I INFORMATION ONLY J Quality Control Inspector Date Owners Representative Date
UNDER WATER CONSTRUCTION CORPORATION ATTACHMENT 1 COATING REPAIR RECORD Client:
Exelon/AmerGen Facility Location: Oyster Creek Nuclear Gen. Station Work Order No.: R2077340 Description of Vessel Being Repaired:
G.E. BWR /Mark I Containment-Torus UCC Project Manager:
Phillip Bower PROCEDURE: IOP.02.22 REVISION: 5 I Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
1U300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By: T. Schuster Location Where Material was Used:
Bay 17 Date of Application:
10/26/06 Total Deficiencies = 27 No ThermographSN N/A1 Material Storage Maintained X Yes Total Repairs = 20 Mixing (mixed by plural component dispenser)
Total Material Mixed: 200cc Material Mixed By:
- 1) N/A
- 2) N/A
- 3) N/A Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 268 SqFt Applied By: 1)J. Massey
- 2)
- 3)
- 4) 5 )
Total Material Applied:
200cc Inspection DryFilmThickness: Min 33 Max 40 Ave 36 GageNo(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments Some repairs consolidated All repairs appear fully cured and tightly bonded to base metaVsubstrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range 1-Thermograph not required for short term storag Quality Control Inspector Date Owners Representative Date
UNDERWATER CONSTRUCTION CORPORATION ATTACHMENT 1 COATING REPAIR RECORD I
PROCEDURE: IOP.02.22 REVISION: 5 Client:
ExelordAmerGen Facility Location: Oyster Creek Nuclear Gen. Station Work Order No.: R2077340 Description of Vessel Being Repaired:
G.E. BWR /Mark I Containment-Torus UCC Project Manager:
Phillip Bower Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
1U300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By: T. Schuster Material Storage Maintained X Yes No Thermograph SN N/AI Location Where Material was Used:
Bay 18 Date of Application:
10/26/06 I Total Deficiencies = 24 Total Repairs = 24
~
~
Mixing (mixed by plural component dispenser)
Total Material Mixed: 167cc Material Mixed By:
- 1) N/A
- 2) N/A
- 3) N/A Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 268 SqFt Applied By: l)J. Massey
- 2)
- 3)
- 4) 5 )
Total Material Applied:
167cc Inspection Dry FilmThickness: Min 32 Max 39 Ave 36 GageNo(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments All repairs appear hlly cured and tightly bonded to base metahubstrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range 1-Thermograph not required for short term st Quality Control Inspector Date Owners Representative Date
UNDERWATER CONSTRUCTION CORPORATION ATTACHMENT 1 COATING REPAIR RECORD Client:
ExelodAmerGen Facility Location: Oyster Creek Nuclear Gen. Station Work Order No.: R2@i7340 Description of Vessel Being Repaired:
G.E. BWR /Mark I Containment-Torus UCC Project Manager:
Phillip Bower PROCEDURE: 10P.02.22 REVISION: 5 I Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
1U300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By: T. Schuster Material Storage Maintained X Yes No Thermograph SN N/AI Location Where Material was Used: Bay 19 Date of Application:
10/26/06 Total Deficiencies = 19 Total Repairs = 19 Mixing (mixed by plural component dispenser) 1 Total Material Mixed: 38cc Material Mixed By:
- 1) N/A
- 2) N/A
- 3) N/A I Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 114 SqFt Applied By: l)J. Massey
- 2)
- 3)
- 4)
- 5)
~
~
Total Material Applied 38cc Inspection Dry FilmThickness: Min 30 Max 30 Ave 32 GageNo(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments
~
All repairs appear fully cured and tightly bonded to base metalhubstrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range 1 -Thermograph not required for short term storage.
Date
UNDERWATER CONSTRUCTION CORPORATION PROCEDURE: IOP.02.22 REVISION: 5 ATTACHMENT 1 COATING REPAIR RECORD Client:
ExelodAmerGen Facility Location: Oyster Creek Nuclear Gen. Station Work Order No.: R2077340 Description of Vessel Being Repaired:
G.E. BWR Mark I Containment-Torus UCC Project Manager:
Phillip Bower I Coating Material Coating Name:
BioDur 561 Mfg. By:
TFT Batch No. A:
lU300306 B:
2U300306 Material Exp. Date 04/02/07 Material Issued By: T. Schuster Material Storage Maintained X Yes No ThermographSN N/AI Location Where Material was Used: Bay 20 Date of Application:
10/26/06 Total Deficiencies = 16 Total Repairs = 9 Mixing (mixed by plural component dispenser)
Total Material Mixed: 80cc Material Mixed By:
- 1) N/A
- 2) N/A
- 3) N/A Surface Preparation and Coating Application Surface Preparation: SSPC-11 Tools Used:
3-M Wheel, Grinder Surface area of repair:
SqIn 35 SqFt Applied By: l)J. Massey
- 2)
- 3)
- 4) 5 )
Total Material Applied:
80cc Inspection Dry FilmThickness: Min 27 Max 28 Ave 28 GageNo(s) 1)173919
- 2) 181771 Repairs Acceptable X
Yes No Comments Some repairs consolidated I
All repairs appear fully cured and tightly bonded to base mctahbstrate and the surrounding coating with no evidence of bleed-through. Dry film thicknesses of the repairs were within acceptable range 1 -Thermograph not required for short term st Date